John Jin Hang Wai
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to May 2014
- Last 24 months
- 0 permits filed
56 permits since 2000: 50 completed, 6 never finaled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2014 | Completed final sign-off Jul 2014 | 1200 Clay St | unit #12 only revision to pa #2014.0404.2533 - remove a bearing wall & provide posts & beam to support floor joist above. n/a maher ordinance 155-13Details
unit #12 only revision to pa #2014.0404.2533 - remove a bearing wall & provide posts & beam to support floor joist above. n/a maher ordinance 155-13 | $3,500 |
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 1200 Clay St | remodel apt # 12 existing 1 bathroom & one kitchenDetails
remodel apt # 12 existing 1 bathroom & one kitchen | $15,000 |
| Jan 6, 2014 | Completed final sign-off Jun 2014 | 2362 20th Av | add a storage room, an office and a toilet at ground floor. to comply with 201343101Details
add a storage room, an office and a toilet at ground floor. to comply with 201343101 | $15,000 |
| Jan 6, 2014 | Completed final sign-off Jun 2014 | 1435 21st Av | add rooms at ground floor. comply w/sfgbc table 4Details
add rooms at ground floor. comply w/sfgbc table 4 | $25,000 |
| Dec 12, 2013 | Completed final sign-off Dec 2013 | 220 Turk St | submit as built plan for approved stair construction. revision per pa# 2013-0509-6482Details
submit as built plan for approved stair construction. revision per pa# 2013-0509-6482 | $300 |
| Jul 15, 2013 | Never finaled issued Aug 2013, no final | 279 Broad St | to add one bed room, one family room, 2 full bathroom and laundry room on extg ground floor per plan.Details
to add one bed room, one family room, 2 full bathroom and laundry room on extg ground floor per plan. | $68,000 |
| Jun 21, 2013 | Completed final sign-off Oct 2013 | 2362 20th Av | convert (e) closets into a full bath at rear of (e) bedrooms on 2nd & 3rd floor unit. remodel (e) kitchen on (e) 2nd & 3rd floor.Details
convert (e) closets into a full bath at rear of (e) bedrooms on 2nd & 3rd floor unit. remodel (e) kitchen on (e) 2nd & 3rd floor. | $20,000 |
| May 22, 2013 | Completed final sign-off Jun 2013 | 624 Jackson St | to comply with ordinance 029-13 only; installation of grab bars in sro at the following locations: only install 2nd flr, 2 bathroom grab barsDetails
to comply with ordinance 029-13 only; installation of grab bars in sro at the following locations: only install 2nd flr, 2 bathroom grab bars | $300 |
| May 20, 2013 | Completed final sign-off Aug 2013 | 1042 Clement St | to comply with n.o.v. # 201217421. uninstall (12) vinyl windows (backyard windows: total 13 each floor ; replace 12th avenue and clement street side - second floor windows (total 28 each facing the street) replace in kind.Details
to comply with n.o.v. # 201217421. uninstall (12) vinyl windows (backyard windows: total 13 each floor ; replace 12th avenue and clement street side - second floor windows (total 28 each facing the street) replace in kind. | $12,000 |
| May 9, 2013 | Completed final sign-off Dec 2013 | 220 Turk St | change of use, add a new stair from ground floor retail to store to (e) basement storage. remodel retail store front entrance to become level landing. handicapp accessible entranceDetails
change of use, add a new stair from ground floor retail to store to (e) basement storage. remodel retail store front entrance to become level landing. handicapp accessible entrance | $2,000 |
| Feb 7, 2013 | Completed final sign-off Feb 2013 | 41 Tioga Av | repair the existing house front side stair way less than 50%Details
repair the existing house front side stair way less than 50% | $3,000 |
| Nov 7, 2012 | Never finaled issued Oct 2013, no final | 2359 38th Av | vertical & rear horizontal addition: add 3rd fl w/ 2 bedrms, playrm & full bath. 2nd fl: relocate kitchen, bedrms, add full bath. 1st fl: relocate bedrms, add family rm, exercise rm, guest rm & full bath.Details
vertical & rear horizontal addition: add 3rd fl w/ 2 bedrms, playrm & full bath. 2nd fl: relocate kitchen, bedrms, add full bath. 1st fl: relocate bedrms, add family rm, exercise rm, guest rm & full bath. | $250,000 |
| Jun 4, 2012 | Completed final sign-off Jan 2013 | 727 Excelsior Av | to add 2 bed rooms, one play room, one full bath room, one storage and laundry area on extg ground floor per plan.Details
to add 2 bed rooms, one play room, one full bath room, one storage and laundry area on extg ground floor per plan. | $45,000 |
| May 10, 2012 | Completed final sign-off Sep 2012 | 327 Rome St | to add one bedroom, one play room,laundry and 2 full bath room on extg ground floor per plan.Details
to add one bedroom, one play room,laundry and 2 full bath room on extg ground floor per plan. | $40,000 |
| Apr 30, 2012 | Completed final sign-off Feb 2013 | 1306 30th Av | construct 2 new bedrooms, 1 new bathroom, 1 new family room on ground floor. replace (e) water heater & (e) furnaceDetails
construct 2 new bedrooms, 1 new bathroom, 1 new family room on ground floor. replace (e) water heater & (e) furnace | $50,000 |
| Apr 26, 2012 | Completed final sign-off Aug 2012 | 4126 Pacheco St | add one bedroom, one bath and one family room at ground floor.Details
add one bedroom, one bath and one family room at ground floor. | $20,000 |
| Apr 19, 2012 | Completed final sign-off Jun 2012 | 311 De Long St | remodel (1) existing kitchen, (1) bathroom downstairs; one bathroom to comply with complaint # 201218201Details
remodel (1) existing kitchen, (1) bathroom downstairs; one bathroom to comply with complaint # 201218201 | $17,500 |
| Feb 22, 2012 | Completed final sign-off Jan 2013 | 401 Sansome St | 1. remove & replace portion of existing sidewalk, remove & replace deteiorated steel beams if found rusted below sidewalk and trap door with new (sub-sidewalk basement below.) 2. remove (e) curb ramp and replace with 2 new curb ramps at cornor of sansome & sacramento st.Details
1. remove & replace portion of existing sidewalk, remove & replace deteiorated steel beams if found rusted below sidewalk and trap door with new (sub-sidewalk basement below.) 2. remove (e) curb ramp and replace with 2 new curb ramps at cornor of sansome & sacramento st. | $8,000 |
| May 20, 2011 | Completed final sign-off Jul 2011 | 25 Coleridge St | remodeling upstairs one bathroom, high efficacy lighting or occupancy control, cec 150(k)Details
remodeling upstairs one bathroom, high efficacy lighting or occupancy control, cec 150(k) | $4,500 |
| Mar 24, 2011 | Completed final sign-off May 2011 | 1742 27th Av | 1)remove and repair 2nd floor exterior stucco on house front. all repair in kind.2)repair 2 bedrooms interior wall crack by refacing with sheetrock and paintDetails
1)remove and repair 2nd floor exterior stucco on house front. all repair in kind.2)repair 2 bedrooms interior wall crack by refacing with sheetrock and paint | $7,000 |
| Feb 18, 2011 | Completed final sign-off Mar 2011 | 4126 Pacheco St | remove non-permit built bath room and a bed room at rear of extg garage level.Details
remove non-permit built bath room and a bed room at rear of extg garage level. | $1,500 |
| Aug 11, 2010 | Completed final sign-off Sep 2010 | 2357 Bush St | the repair and reinforcement of (e) exterior stairs at rear, not visible from street. less than 50%Details
the repair and reinforcement of (e) exterior stairs at rear, not visible from street. less than 50% | $4,000 |
| Mar 18, 2010 | Completed final sign-off Mar 2010 | 1424 Ingalls St | replace the front 2 windows, u-factor o.40 maxDetails
replace the front 2 windows, u-factor o.40 max | $1,000 |
| Mar 11, 2010 | Completed final sign-off Mar 2010 | 1424 Ingalls St | replace 3 existing windows, face rear yardDetails
replace 3 existing windows, face rear yard | $2,000 |
| Jan 21, 2010 | Completed final sign-off Apr 2010 | 425 12th Av | remodel 2nd floor (#425 only): one kitchen ( cabinet, countertop, tile) & one bathroom fixtures., no structural changes, new lighting.Details
remodel 2nd floor (#425 only): one kitchen ( cabinet, countertop, tile) & one bathroom fixtures., no structural changes, new lighting. | $13,500 |
| Jan 11, 2010 | Completed final sign-off May 2010 | 440 Elmira St | convert e kitchen to bedroom, relocate kitchen to e dining area, convert e bath into 2 baths, all on 2nd fl. convert e storage into bedroom, family room, and storage, relocate e full bath at gr floorDetails
convert e kitchen to bedroom, relocate kitchen to e dining area, convert e bath into 2 baths, all on 2nd fl. convert e storage into bedroom, family room, and storage, relocate e full bath at gr floor | $40,000 |
| Nov 20, 2009 | Completed final sign-off Feb 2010 | 2232 Larkin St | remodel bathroom in apartment unit # 201. no removal or addition of wall.Details
remodel bathroom in apartment unit # 201. no removal or addition of wall. | $5,500 |
| Nov 17, 2009 | Never finaled issued Nov 2009, no final | 614 Garfield St | remodeling kitchen & bathroom upstairs floor. kitchen min 50% of lighting watt be of h.e. light. bathroom h.e. lights on manual onDetails
remodeling kitchen & bathroom upstairs floor. kitchen min 50% of lighting watt be of h.e. light. bathroom h.e. lights on manual on | $18,000 |
| Jul 8, 2009 | Completed final sign-off Nov 2009 | 423 12th Av | remdel 1 kitchen and 1 bath on upper floorDetails
remdel 1 kitchen and 1 bath on upper floor | $25,000 |
| May 15, 2009 | Completed final sign-off Jun 2013 | 712 08th Av | horizontal rear addition of 3 story of the house including (1) family room, (3) bedrooms, (3) bathrooms, (2) offices, (1) study room & (1) play room.Details
horizontal rear addition of 3 story of the house including (1) family room, (3) bedrooms, (3) bathrooms, (2) offices, (1) study room & (1) play room. | $250,000 |
| Oct 21, 2008 | Completed final sign-off Feb 2009 | 1658 30th Av | 1)remodel extg kitchen, bath room and add one new bath room. repair extg stair all work at 2nd floor. 2)construct one bed room. storage room, laundry room and 2 full bath room. all work at ground floor.Details
1)remodel extg kitchen, bath room and add one new bath room. repair extg stair all work at 2nd floor. 2)construct one bed room. storage room, laundry room and 2 full bath room. all work at ground floor. | $75,000 |
| Jul 22, 2008 | Completed final sign-off Oct 2008 | 1960 Sloat Bl | ground floor: legalize existing bedroom, family room, add 1 storage room, 1 full bath. add new deck from 2nd floor rear. convert (e) windows to slider.Details
ground floor: legalize existing bedroom, family room, add 1 storage room, 1 full bath. add new deck from 2nd floor rear. convert (e) windows to slider. | $53,000 |
| Jul 21, 2008 | Completed final sign-off Mar 2009 | 940 Cayuga Av | add bedroom, bathroom and storage area on ground floorDetails
add bedroom, bathroom and storage area on ground floor | $15,000 |
| Jun 30, 2008 | Completed final sign-off Mar 2009 | 2137 Vicente St | add a family room, a storage and a full bath in 1st floor for single family use onlyDetails
add a family room, a storage and a full bath in 1st floor for single family use only | $20,000 |
| May 28, 2008 | Completed final sign-off Jul 2008 | 468 Brussels St | remodeling upstair bathroom. replace the tile, bathtop, sink. toilet faucet & painting. no structural. lighting to be fluorescant or on occupant sansor.Details
remodeling upstair bathroom. replace the tile, bathtop, sink. toilet faucet & painting. no structural. lighting to be fluorescant or on occupant sansor. | $6,500 |
| Apr 16, 2008 | Completed final sign-off Jun 2008 | 509 Point Lobos Av | remodeling kitchen & bathroom. replace drywall & floor tiles bathroom. replace the kitchen, countertop, cabinet, floor tile, sink, faucet. lighting to comply with title 24.Details
remodeling kitchen & bathroom. replace drywall & floor tiles bathroom. replace the kitchen, countertop, cabinet, floor tile, sink, faucet. lighting to comply with title 24. | $14,000 |
| Apr 14, 2008 | Completed final sign-off Apr 2008 | 540 43rd Av | increase value of application 200803247807 by $7000.00. remodeling kitchen.Details
increase value of application 200803247807 by $7000.00. remodeling kitchen. | $7,000 |
| Mar 26, 2008 | Completed final sign-off May 2014 | 4401 Balboa St | renew permit application #200707187147 for final inspectionDetails
renew permit application #200707187147 for final inspection | |
| Feb 21, 2008 | Completed final sign-off Apr 2008 | 517 03rd Av | remodel existing bathrooms and kitchen at 2nd floor per planDetails
remodel existing bathrooms and kitchen at 2nd floor per plan | $20,000 |
| Jul 25, 2007 | Completed final sign-off Jan 2008 | 641 Jackson St | revise approved p.a. #2007/0308/5794 to relocate one toilet and one hand sink and add one hand sink.Details
revise approved p.a. #2007/0308/5794 to relocate one toilet and one hand sink and add one hand sink. | $500 |
| Jul 18, 2007 | Never finaled issued Jul 2007, no final | 4401 Balboa St | replace back side some siding wood. replace in kind exterior siding located on the south side of the building, 16'x16' area.Details
replace back side some siding wood. replace in kind exterior siding located on the south side of the building, 16'x16' area. | $4,000 |
| May 18, 2007 | Completed final sign-off Aug 2007 | 542 43rd Av | remodeling 2nd floor and 3rd floor kitchen and bathroom. (2) kitchen & (2) bath.Details
remodeling 2nd floor and 3rd floor kitchen and bathroom. (2) kitchen & (2) bath. | $18,500 |
| Feb 16, 2006 | Completed final sign-off Mar 2006 | 2183 Pacific Av | renew pa#200309164856 to condinue work obtain for final inspection.Details
renew pa#200309164856 to condinue work obtain for final inspection. | $5,000 |
| Jan 24, 2006 | Never finaled issued Jan 2006, no final | 1822 38th Av | replace and fix outside deckingDetails
replace and fix outside decking | $2,000 |
| Nov 18, 2005 | Completed final sign-off Jun 2006 | 2232 Divisadero St | remodel kitchen - taking out 2 minor non bearing walls. add kitchen island. replace kitchen cabinets. move the water line, add 2 electrical outlet.Details
remodel kitchen - taking out 2 minor non bearing walls. add kitchen island. replace kitchen cabinets. move the water line, add 2 electrical outlet. | $20,000 |
| Aug 3, 2005 | Completed final sign-off Feb 2006 | 2397 Folsom St | replace kitchen cabinets, sink,floor. no structural. bathroom sink, floor. linoleum.Details
replace kitchen cabinets, sink,floor. no structural. bathroom sink, floor. linoleum. | $8,000 |
| Jun 21, 2005 | Completed final sign-off Nov 2005 | 1445 48th Av | replace the no. 2,3,4 kitchen cabinets (3) bathrooms the tile, repair damaged wall by the stairway aDetails
replace the no. 2,3,4 kitchen cabinets (3) bathrooms the tile, repair damaged wall by the stairway a | $35,000 |
| Nov 24, 2004 | Completed final sign-off Aug 2008 | 1629 09th Av | horizontal addition @ rear; raise (e) bldg to add one unit in (e) crawl space; excavate basement to create 4 car garage.Details
horizontal addition @ rear; raise (e) bldg to add one unit in (e) crawl space; excavate basement to create 4 car garage. | $200,000 |
| Jul 28, 2004 | Completed final sign-off Sep 2004 | 1495 48th Av | repair outside stucco, replace dryrot & rouglhly 300 sq feet on kirkham st. facade replace 3 windoDetails
repair outside stucco, replace dryrot & rouglhly 300 sq feet on kirkham st. facade replace 3 windo | $6,000 |
| Jun 15, 2004 | Completed final sign-off Aug 2004 | 755 Monterey Bl | repair (e) deck 60'x4'Details
repair (e) deck 60'x4' | $1,200 |
| May 24, 2004 | Completed final sign-off May 2004 | 387 12th Av | remodel 2nd floor bthrm and floor porchDetails
remodel 2nd floor bthrm and floor porch | $5,000 |
| May 24, 2004 | Completed final sign-off May 2004 | 387 12th Av | renew app #200308283342Details
renew app #200308283342 | |
| Mar 31, 2004 | Completed final sign-off Jul 2004 | 1747 Sutter St | remodel kitchen & bathroom. top unit. no structural work.Details
remodel kitchen & bathroom. top unit. no structural work. | $15,000 |
| Jun 16, 2003 | Completed final sign-off Aug 2003 | 7 Balmy St | redoing whole bathrm @2nd fl. , cabinets, walls, tile, bath, no structural work.Details
redoing whole bathrm @2nd fl. , cabinets, walls, tile, bath, no structural work. | $6,000 |
| Nov 8, 2002 | Never finaled issued Nov 2002, no final | 751 Arguello Bl | renewal for remaining work per app #200002222409Details
renewal for remaining work per app #200002222409 | $8,000 |
| Jul 17, 2002 | Completed final sign-off Sep 2002 | 2240 45th Av | renew appn. 200010112644s for final inspDetails
renew appn. 200010112644s for final insp | $7,500 |