John Construction Builder
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Sep 2026
- Last 24 months
- 8 permits filed
41 permits since 2000: 29 completed, 6 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 3558 20th St | recommencement and completion of work approved under pa#: 201904299176, 202006088261, and 202406043622.Details
recommencement and completion of work approved under pa#: 201904299176, 202006088261, and 202406043622. | $50,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 3554 20th St | recommencement and completion of work approved under pa# 202302172176Details
recommencement and completion of work approved under pa# 202302172176 | $25,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 246 20th Av | revision to pa 202601083485: removing 1 kitchen remodel from scope of work. will only be completing 1 bathroom remodel. electrical and plumbing as needed. replacing sheetrock on 2nd flr bathroom and bedroom.Details
revision to pa 202601083485: removing 1 kitchen remodel from scope of work. will only be completing 1 bathroom remodel. electrical and plumbing as needed. replacing sheetrock on 2nd flr bathroom and bedroom. | $10,000 |
| Jan 8, 2026 | In progress issued Jan 2026 | 246 20th Av | remodel (1) kitchen in kind. remodel (1) bathroom in kind. plumbing and electrical as needed. no walls removed.Details
remodel (1) kitchen in kind. remodel (1) bathroom in kind. plumbing and electrical as needed. no walls removed. | $25,000 |
| Jun 10, 2025 | Completed final sign-off Aug 2025 | 2729 Lombard St | in-kind remodel of kitchen and bathroom for unit 4: no change to floor layout, no change to wall layout, no structural work.Details
in-kind remodel of kitchen and bathroom for unit 4: no change to floor layout, no change to wall layout, no structural work. | $30,000 |
| Jun 10, 2025 | Completed final sign-off Aug 2025 | 2729 Lombard St | unit 6-in-kind remodel of kitchen and bathroom for unit 6: no change to floor layout. no change to wall layout, no structural work.Details
unit 6-in-kind remodel of kitchen and bathroom for unit 6: no change to floor layout. no change to wall layout, no structural work. | $30,000 |
| Feb 6, 2025 | Completed final sign-off Jul 2025 | 80 Chaves Av | convert front porch to interior foyer, replace front stairs, alter front roof and replace roof tiles, add 2 skylights, change windows per plan and elevations, repair and refinish stucco, replace rear and side wall cladding. ref 2024-1015-2911 for interior work.Details
convert front porch to interior foyer, replace front stairs, alter front roof and replace roof tiles, add 2 skylights, change windows per plan and elevations, repair and refinish stucco, replace rear and side wall cladding. ref 2024-1015-2911 for interior work. | $100,000 |
| Oct 15, 2024 | Completed final sign-off Jul 2025 | 80 Chaves Av | interior remodel: convert existing storage to 1 bedroom, 1 media room, 1 home office, and 1 bathroom on ground floor. add 1 bath on 2nd floor. no exterior work.Details
interior remodel: convert existing storage to 1 bedroom, 1 media room, 1 home office, and 1 bathroom on ground floor. add 1 bath on 2nd floor. no exterior work. | $250,000 |
| Jun 17, 2024 | In progress issued Oct 2024 | 1653 Anza St | convert g/f vacant laundromat into adu pert state adu program. no exterior expansion.Details
convert g/f vacant laundromat into adu pert state adu program. no exterior expansion. | $110,000 |
| Jun 4, 2024 | In progress issued Jun 2024 | 3558 20th St | revision to pa#201904299176 to add 1 master bathroom to 3rd floor unit. no change to egress or structural. revision to 202006088261 to change 2 tubs to 2 showers and remove living rm wall on 2nd fl unit (3556 20th st)Details
revision to pa#201904299176 to add 1 master bathroom to 3rd floor unit. no change to egress or structural. revision to 202006088261 to change 2 tubs to 2 showers and remove living rm wall on 2nd fl unit (3556 20th st) | $16,000 |
| Jan 19, 2024 | Completed final sign-off Oct 2024 | 1730 22nd Av | repair fire damage to comply with nov# 202303317. interior remodel, infill south lightwell, add 2 bedrooms, media room, and 2 baths on the ground floor and add 1.5 baths on the 2nd flr.Details
repair fire damage to comply with nov# 202303317. interior remodel, infill south lightwell, add 2 bedrooms, media room, and 2 baths on the ground floor and add 1.5 baths on the 2nd flr. | $250,000 |
| Dec 8, 2023 | Completed final sign-off Jun 2024 | 1730 22nd Av | remove (e) plaster and shore up unsafe portions of a fire damaged building to comply with nov 202303317. separate permit required for fire damage repairs. this permit alone will not remove nov.Details
remove (e) plaster and shore up unsafe portions of a fire damaged building to comply with nov 202303317. separate permit required for fire damage repairs. this permit alone will not remove nov. | $3,000 |
| Jul 25, 2023 | Completed final sign-off Jun 2024 | 838 Grant Av | accessible business entry: provide powered door operator for technical infeasibile upgrade abe# 2022-0606-1299Details
accessible business entry: provide powered door operator for technical infeasibile upgrade abe# 2022-0606-1299 | $4,000 |
| Feb 17, 2023 | Never finaled issued Feb 2023, no final | 3554 20th St | remove lightwell enclosure to comply w/nov# 202181498, add 1 bathroom to ground flr, unit#1. no change to egress or structural. all (e) lightwells to remain.Details
remove lightwell enclosure to comply w/nov# 202181498, add 1 bathroom to ground flr, unit#1. no change to egress or structural. all (e) lightwells to remain. | $50,000 |
| Nov 22, 2022 | Never finaled issued Feb 2023, no final | 3552 20th St | to comply with accessible business entrance program per ordinance 51-16, install (1) lever door hardware, door bell and ring bell for service sign. abe# 201812183115.Details
to comply with accessible business entrance program per ordinance 51-16, install (1) lever door hardware, door bell and ring bell for service sign. abe# 201812183115. | $300 |
| Oct 29, 2021 | Completed final sign-off May 2023 | 1050 Pine St | revision to pa# 202011179133 to revise interior layout for unit 6. revision to pa# 202101283554 to revise interior layout for unit 9. no change to facade, egress, structural or plumbing fixtures.Details
revision to pa# 202011179133 to revise interior layout for unit 6. revision to pa# 202101283554 to revise interior layout for unit 9. no change to facade, egress, structural or plumbing fixtures. | |
| Sep 7, 2021 | Completed final sign-off May 2023 | 1050 Pine St | revision to approved permit 201708296351. revise ground floor adu layout, add 1 bedroom, 1 bath, 1 powder room and laundry. no change to egress. structural under soft story permits 201708144682 and 202002204996.Details
revision to approved permit 201708296351. revise ground floor adu layout, add 1 bedroom, 1 bath, 1 powder room and laundry. no change to egress. structural under soft story permits 201708144682 and 202002204996. | |
| Sep 7, 2021 | Expired or cancelled revoked Apr 2023 | 3552 20th St | revision to 201904299176, add 1 bath to gr fl unit 1. close lightwell at gr fl only. no change to egress or structural. comply w nov 201878063 and 202181498Details
revision to 201904299176, add 1 bath to gr fl unit 1. close lightwell at gr fl only. no change to egress or structural. comply w nov 201878063 and 202181498 | $30,000 |
| Jan 28, 2021 | Completed final sign-off May 2023 | 1050 Pine St | interior remodel of vacant apartments for unit #2 on 2nd fl. unit# 5 on 3rd fl. & unit #9 on 4th fl. add one full bath for unit #9 . enclose interior lightwell on 2nd-4th floors, no change to facade or egress, no structuralDetails
interior remodel of vacant apartments for unit #2 on 2nd fl. unit# 5 on 3rd fl. & unit #9 on 4th fl. add one full bath for unit #9 . enclose interior lightwell on 2nd-4th floors, no change to facade or egress, no structural | $75,000 |
| Nov 17, 2020 | Completed final sign-off May 2023 | 1050 Pine St | #6: interior remodel. relocate kitchen. add a bedroom & bathroom. remodel existing bathroom.Details
#6: interior remodel. relocate kitchen. add a bedroom & bathroom. remodel existing bathroom. | $50,000 |
| Feb 20, 2020 | Completed final sign-off Aug 2021 | 1050 Pine St | revision to approved permit #201708144682. upgrade seismic work, replace lightwell footing from line c to lines 2 to 4.2.Details
revision to approved permit #201708144682. upgrade seismic work, replace lightwell footing from line c to lines 2 to 4.2. | $10,000 |
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 3552 20th St | upgrade electrical in all units and ground floor commercial, replace & patch sheetrock as needed, remodel kitchen & bathroom in all residential units.Details
upgrade electrical in all units and ground floor commercial, replace & patch sheetrock as needed, remodel kitchen & bathroom in all residential units. | $60,000 |
| Mar 13, 2019 | Expired or cancelled cancelled Apr 2021 | 1700 Jones St | remodel kitchen and (2) bathrooms. remodel in existing locationsDetails
remodel kitchen and (2) bathrooms. remodel in existing locations | $19,000 |
| Jan 31, 2019 | Completed final sign-off Feb 2021 | 1362 07th Av | as built revision to pa 2018-0309-3290 relocate full bath on 1st floor. relocate full bath on 1st floor, add one bath on 3rd floor. minor bath layout changes on 4th floor.Details
as built revision to pa 2018-0309-3290 relocate full bath on 1st floor. relocate full bath on 1st floor, add one bath on 3rd floor. minor bath layout changes on 4th floor. | $20,000 |
| Aug 28, 2018 | Completed final sign-off Feb 2019 | 2010 Lombard St | 3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010bDetails
3rd flr - interior remodel (e) kitchen adn add a full bathroom in unit 2010b | $25,000 |
| Mar 9, 2018 | Completed final sign-off Feb 2021 | 1362 07th Av | replace existing windows and doors with new. 3rd & 4th fl: remodel roof and guardrail. new roof deck. dry rot repair to exist deck. replace exterior wall stucco in kindDetails
replace existing windows and doors with new. 3rd & 4th fl: remodel roof and guardrail. new roof deck. dry rot repair to exist deck. replace exterior wall stucco in kind | $20,000 |
| Feb 2, 2018 | Completed final sign-off May 2018 | 1819 Lyon St | #2 -kitchen - open hole for install ceiling lights 2' x2' 15 holes. remodeling a kitchenDetails
#2 -kitchen - open hole for install ceiling lights 2' x2' 15 holes. remodeling a kitchen | $9,000 |
| Jan 22, 2018 | Completed final sign-off Sep 2018 | 2012 Lombard St | unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroomDetails
unit a: 4th fl - remodel existing kitchen and bathroom; add full bathroom | $30,000 |
| Dec 7, 2017 | Completed final sign-off Sep 2018 | 2012 Lombard St | unit b - remodel kitchen and add a full bathroomDetails
unit b - remodel kitchen and add a full bathroom | $30,000 |
| Aug 29, 2017 | Completed final sign-off May 2023 | 1050 Pine St | add additional unit per ord #162.16. remove garage. (n) unit includes kitchen & (2) bathrooms. soft story submitted #2017-08-14-4682.Details
add additional unit per ord #162.16. remove garage. (n) unit includes kitchen & (2) bathrooms. soft story submitted #2017-08-14-4682. | $75,000 |
| Aug 14, 2017 | Completed final sign-off Aug 2021 | 1050 Pine St | soft story retrofit per sfebc chapter 4d, fema p-807, add (7) (n) shear walls with required footings. electrical/plumbing under separate permit. appendex a4 - future adu under separate permit.Details
soft story retrofit per sfebc chapter 4d, fema p-807, add (7) (n) shear walls with required footings. electrical/plumbing under separate permit. appendex a4 - future adu under separate permit. | $30,000 |
| Aug 10, 2015 | Completed final sign-off Jan 2016 | 228 Chicago Wy | remodel extg kitchen. replace counter, cabinets, flooring, remove/re-built closet, & extended counter to double sink. all work at 2nd floor.Details
remodel extg kitchen. replace counter, cabinets, flooring, remove/re-built closet, & extended counter to double sink. all work at 2nd floor. | $12,000 |
| Jun 23, 2015 | Completed final sign-off Oct 2015 | 3914 24th St | remodel (e) toilet room, replace all fixtures, flooring & divide (e) storage room into employee room/storage room. all work at ground floor. change of use.Details
remodel (e) toilet room, replace all fixtures, flooring & divide (e) storage room into employee room/storage room. all work at ground floor. change of use. | $15,000 |
| Jun 20, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | revision under app#201404294404. add one full bath and laundry at 2nd floor and 3rd floor.Details
revision under app#201404294404. add one full bath and laundry at 2nd floor and 3rd floor. | $22,000 |
| May 8, 2014 | Never finaled issued May 2014, no final | 1155 Jones St | remodel kitchen and bathroom, upgrade electric in the apt, install new lights in kitchen and bathroom to conform with title 24, no structural work no window or door change work for apt 505, 205 & 504; compliance with ord 155-13 not requiredDetails
remodel kitchen and bathroom, upgrade electric in the apt, install new lights in kitchen and bathroom to conform with title 24, no structural work no window or door change work for apt 505, 205 & 504; compliance with ord 155-13 not required | $75,000 |
| Apr 29, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | remodel (e) kitchen/bathroom, convert (e) dining room into bedroom & remove (e) shower stall convert to toilet room for 2nd & 3rd floor.Details
remodel (e) kitchen/bathroom, convert (e) dining room into bedroom & remove (e) shower stall convert to toilet room for 2nd & 3rd floor. | $32,000 |
| Apr 29, 2014 | Completed final sign-off Sep 2014 | 3115 Balboa St | remodel existing bedroom, bathroom & rebuilt two bedrooms & one full bathroom & relocate water heaters/furnaces. all work at ground floor.Details
remodel existing bedroom, bathroom & rebuilt two bedrooms & one full bathroom & relocate water heaters/furnaces. all work at ground floor. | $28,000 |
| Mar 15, 2013 | Completed final sign-off Sep 2013 | 1618 Polk St | updating the electric in apt #1 @ 1618 polk st sf, remodeling kitchen and bathroomDetails
updating the electric in apt #1 @ 1618 polk st sf, remodeling kitchen and bathroom | $29,000 |
| Jun 7, 2011 | Completed final sign-off Aug 2011 | 1618 Polk St | remodel 1 bathroom, no change to walls windows doors @ residential; install new in-wall heater, lighting to comply with cec 150(k)Details
remodel 1 bathroom, no change to walls windows doors @ residential; install new in-wall heater, lighting to comply with cec 150(k) | $10,000 |
| Apr 27, 2011 | Completed final sign-off Aug 2011 | 1618 Polk St | remodel kitchen upgrade plumbing and elec inside uinte 18. completely paint unit and refinish hardwood floors. new lighting comply with cec 150 k. no structural work. no window door, ceiling or wall workDetails
remodel kitchen upgrade plumbing and elec inside uinte 18. completely paint unit and refinish hardwood floors. new lighting comply with cec 150 k. no structural work. no window door, ceiling or wall work | $26,000 |
| Mar 23, 2011 | Completed final sign-off Nov 2011 | 630 Cole St | replace cabinet, outlets, pipe kitchen. no structural workDetails
replace cabinet, outlets, pipe kitchen. no structural work | $4,900 |