Joel Mark
- Based in
- Fremont
- On San Francisco permits
- Mar 2019 to May 2024
- Last 24 months
- 0 permits filed
47 permits since 2000: 24 completed, 3 in progress, 15 never finaled, 5 expired or cancelled.
Of the 15 never-finaled permits, 5 are 3 to 5 years old, 10 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | In progress issued May 2024 | 188 Minna St | 1 kitchen and 2 full bathroom remodel, all rough-ins to remain in the same location new painting throughout new flooring througout. no removal of wallsDetails
1 kitchen and 2 full bathroom remodel, all rough-ins to remain in the same location new painting throughout new flooring througout. no removal of walls | $40,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2025 | 1051 Francisco St | stucco repair, approx 700 sq ft. side of the street.Details
stucco repair, approx 700 sq ft. side of the street. | $15,000 |
| Sep 11, 2023 | In progress issued Sep 2024 | 2755 Scott St | revision to pa# 201801098205-s2: new unconditioned closet @ 1st floor, renovate & expand kitchen @ 2nd floor. work is extracted from previously approved pa# 201801098205 with sturctural revisions.Details
revision to pa# 201801098205-s2: new unconditioned closet @ 1st floor, renovate & expand kitchen @ 2nd floor. work is extracted from previously approved pa# 201801098205 with sturctural revisions. | $152,000 |
| Sep 8, 2023 | Never finaled issued Sep 2023, no final | 1778 48th Av | exploritory demo of walls at garage level to locate structural entities. patch and repair as needed. all finishes. do not demo plywood sheathing. do not demo wall framing.Details
exploritory demo of walls at garage level to locate structural entities. patch and repair as needed. all finishes. do not demo plywood sheathing. do not demo wall framing. | $5,000 |
| Aug 15, 2023 | Completed final sign-off Jan 2024 | 40 Dorantes Av | stucco repair in-kind on the right side of the house. roughly 350 sqft of repairDetails
stucco repair in-kind on the right side of the house. roughly 350 sqft of repair | $3,000 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 72 Jordan Av | siding repair, roughly 100 sq ft. like for like repair/replacement.Details
siding repair, roughly 100 sq ft. like for like repair/replacement. | $5,000 |
| Jul 26, 2023 | Never finaled issued Jul 2023, no final | 72 Jordan Av | roofing plywood repair. re-roofing permit pulled separately. approx 100sq ft.Details
roofing plywood repair. re-roofing permit pulled separately. approx 100sq ft. | $3,500 |
| Jul 26, 2023 | Never finaled issued Jul 2023, no final | 72 Jordan Av | reroofing. reference bp #202307263005.Details
reroofing. reference bp #202307263005. | $15,000 |
| Jul 3, 2023 | Completed final sign-off Feb 2026 | 72 Jordan Av | remodel 1/f bathroom & kitchen. all new finishes, plumbing and electrical. remodel 2/f bathroom master, all new finishes, plumbing and electrical. title 24 compliant. remodel in kind.Details
remodel 1/f bathroom & kitchen. all new finishes, plumbing and electrical. remodel 2/f bathroom master, all new finishes, plumbing and electrical. title 24 compliant. remodel in kind. | $150,000 |
| May 16, 2023 | Completed final sign-off Jun 2023 | 2820 Lake St | to obtain final inspection for work approved under pa#: 202111081982. all work is completeDetails
to obtain final inspection for work approved under pa#: 202111081982. all work is complete | |
| Apr 21, 2023 | In progress issued Nov 2023 | 1778 48th Av | fl1: convert portion of (e) fl into new primary bath, bedrm, closet & laundry rm, remove (e) back drs & windows & replace w/ new fire-rated drywall on (e) garage walls ceilings. fl2: remove portion of walls between kitchen and living rm. new laundryDetails
fl1: convert portion of (e) fl into new primary bath, bedrm, closet & laundry rm, remove (e) back drs & windows & replace w/ new fire-rated drywall on (e) garage walls ceilings. fl2: remove portion of walls between kitchen and living rm. new laundry | $75,000 |
| Nov 7, 2022 | Completed final sign-off Apr 2024 | 3365 Clay St | one master bath shower remodel. all structural to remain, all rough to remain.Details
one master bath shower remodel. all structural to remain, all rough to remain. | $15,000 |
| Oct 17, 2022 | Expired or cancelled expired Mar 2026 | 2842 Filbert St | exploritory demo of garage floor to location structural entities. patch and repair as needed. all finishes.Details
exploritory demo of garage floor to location structural entities. patch and repair as needed. all finishes. | $5,000 |
| Sep 22, 2022 | Completed final sign-off Jun 2023 | 1891 Church St | replace siding as needed due to dry rot - work in the front side and back - in kind replacement wood for wood in the front.Details
replace siding as needed due to dry rot - work in the front side and back - in kind replacement wood for wood in the front. | $1,200 |
| Sep 16, 2022 | Never finaled issued Sep 2022, no final | 1891 Church St | replace (3) double hung sashes on front window (replacement in-kind). replace (9) windows on the side and back (not visible to the street) in-kind replacement. u=0.30Details
replace (3) double hung sashes on front window (replacement in-kind). replace (9) windows on the side and back (not visible to the street) in-kind replacement. u=0.30 | $9,500 |
| Jun 24, 2022 | Completed final sign-off Jul 2022 | 1261 Filbert St | revision to pa# 202206075774 & 202001091530. consisting of infilling (e) door at rear kitchen & removing (e) exterior stair, see main floor plan.Details
revision to pa# 202206075774 & 202001091530. consisting of infilling (e) door at rear kitchen & removing (e) exterior stair, see main floor plan. | |
| Jun 7, 2022 | Completed final sign-off May 2023 | 1261 Filbert St | unit a: revision to pa# 202001091530. consisting of interior layout changes. (e) rear stair to remain with in-kind dryrot repair. (e) in ground concrete steps to basement area to be repaired as needed.Details
unit a: revision to pa# 202001091530. consisting of interior layout changes. (e) rear stair to remain with in-kind dryrot repair. (e) in ground concrete steps to basement area to be repaired as needed. | |
| Feb 28, 2022 | Expired or cancelled withdrawn Jul 2022 | 1261 Filbert St | revision to pa #202001091530: add a deck and stairs leading to the kitchen. changing main floor full bath to a powder room. changing dining area into a bedroom. adding stairs from the back ot go in the basement floor and a new door. adding access to attic.Details
revision to pa #202001091530: add a deck and stairs leading to the kitchen. changing main floor full bath to a powder room. changing dining area into a bedroom. adding stairs from the back ot go in the basement floor and a new door. adding access to attic. | $60,000 |
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 254 32nd Av | main floor: convert existing storage area into a powder bathroom.Details
main floor: convert existing storage area into a powder bathroom. | $10,000 |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 1036 Francisco St | 1 bathroom remodel. plumbing location to remain. structural to remain. new electrical in bathroom. replacing can lights with new led lights can lighting throughout home. t-24 complaint. no wall alteration.Details
1 bathroom remodel. plumbing location to remain. structural to remain. new electrical in bathroom. replacing can lights with new led lights can lighting throughout home. t-24 complaint. no wall alteration. | $150,000 |
| Nov 23, 2021 | Completed final sign-off Jun 2022 | 254 32nd Av | one kitchen remodel. no structural walls being moved. plumbing remain.Details
one kitchen remodel. no structural walls being moved. plumbing remain. | $50,000 |
| Nov 8, 2021 | Expired or cancelled expired Jun 2023 | 2820 Lake St | 180 sqft. of stucco repair, front of the house 2nd levelDetails
180 sqft. of stucco repair, front of the house 2nd level | $1,800 |
| Jun 15, 2021 | Never finaled issued Jun 2021, no final | 2310 Buchanan St | amendment to current permit 2020-1218-1331 - change of turning existing bathroom to 2 bathroom. bath 2Details
amendment to current permit 2020-1218-1331 - change of turning existing bathroom to 2 bathroom. bath 2 | $30,000 |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 2711 Scott St | stucco repair (800 sqft) total sqft of stucco at bldg 11,000 ~7%. not visible from street.Details
stucco repair (800 sqft) total sqft of stucco at bldg 11,000 ~7%. not visible from street. | $8,000 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 2310 Buchanan St | pa# 202012181331- per field insp. instruction, file permit to move laundry from one side of room to other side.Details
pa# 202012181331- per field insp. instruction, file permit to move laundry from one side of room to other side. | |
| Jun 4, 2021 | Completed final sign-off May 2022 | 1261 Filbert St | (1) garage door replacement.Details
(1) garage door replacement. | $1,000 |
| May 28, 2021 | Expired or cancelled expired Mar 2026 | 2842 Filbert St | basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door systemDetails
basement fl-replace perimeter concrete foundation at rear. add (n) workout rm, (n) bath. 1st flr-enlarge (e) fam rm, add (n) deck & stairs to rear yard. 2nd flr-add (n) deck off (e) dining rm. 3rd flr-replace (e) glass guardrail & (e) sliding glass door system | $325,000 |
| Feb 25, 2021 | Completed final sign-off Oct 2021 | 2411 Washington St | renew bpa#200912243820 for final inspection. all work is completedDetails
renew bpa#200912243820 for final inspection. all work is completed | |
| Jan 29, 2021 | Completed final sign-off Nov 2021 | 1783 Turk St | bathroom remodel - all rough to remain the same. kitchen remodel all nw finishes all rough to remain the same. replace patio door in kind. rear of bldg update to tile 24 compliant. no moving walls.Details
bathroom remodel - all rough to remain the same. kitchen remodel all nw finishes all rough to remain the same. replace patio door in kind. rear of bldg update to tile 24 compliant. no moving walls. | $80,000 |
| Jan 29, 2021 | Never finaled issued Jan 2021, no final | 2326 Pacific Av | install laundry in 2 units in existing closet space. replace 2 slider on and 2 windows in lightwell. unit 1 2 sliders, 1 windows, unit 2 1 window only.Details
install laundry in 2 units in existing closet space. replace 2 slider on and 2 windows in lightwell. unit 1 2 sliders, 1 windows, unit 2 1 window only. | $15,000 |
| Dec 18, 2020 | Never finaled issued Dec 2020, no final | 2310 Buchanan St | replacing bathroom finishes, new shower, new tube, new vanity, all rough plumbing/electrical to remain the same, no change to (e) framingDetails
replacing bathroom finishes, new shower, new tube, new vanity, all rough plumbing/electrical to remain the same, no change to (e) framing | $40,000 |
| Dec 18, 2020 | Completed final sign-off Jun 2022 | 212 Presidio Av | sistering of additional framing support onto (e) framing root work on 4th fl. discovered issued with framingDetails
sistering of additional framing support onto (e) framing root work on 4th fl. discovered issued with framing | $5,000 |
| Oct 28, 2020 | Completed final sign-off Oct 2021 | 1781 Turk St | remodel 1 kitchen and 1 bathroom in-kind. update electrical to t-24 compliant. plumbing to remain. no exterior workDetails
remodel 1 kitchen and 1 bathroom in-kind. update electrical to t-24 compliant. plumbing to remain. no exterior work | $60,000 |
| Aug 14, 2020 | Completed final sign-off Jul 2021 | 2111 Baker St | replace two french doors. replace two windows not visible from street. complete kitchen remodel. new bathroom. remodel one bathroomDetails
replace two french doors. replace two windows not visible from street. complete kitchen remodel. new bathroom. remodel one bathroom | $200,000 |
| Aug 7, 2020 | Expired or cancelled cancelled Sep 2024 | 2111 Baker St | demo of (1) bathroom, demo of cabinetry throughout. fixtures only no remodel of lath or sheetrackDetails
demo of (1) bathroom, demo of cabinetry throughout. fixtures only no remodel of lath or sheetrack | $6,000 |
| Aug 5, 2020 | Completed final sign-off Apr 2021 | 3430 Baker St | replacing kitchen backdoor in kindDetails
replacing kitchen backdoor in kind | $250 |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 15 Surrey St | removal of sliding door. replace w/ (n) wall window. no adjustment to framing. rear of property. not visible from street.Details
removal of sliding door. replace w/ (n) wall window. no adjustment to framing. rear of property. not visible from street. | $10,000 |
| Jul 8, 2020 | Never finaled issued Jul 2020, no final | 36 White St | removal and replacement of concrete floor of garage 750 sq ft. work is inisde the building.Details
removal and replacement of concrete floor of garage 750 sq ft. work is inisde the building. | $10,000 |
| Jun 16, 2020 | Never finaled issued Jun 2020, no final | 2711 Scott St | front deck terrace leak repair at third floor in-kind with new waterproofing. 2nd flr bath - new tub shower, new vanity, new finishes.Details
front deck terrace leak repair at third floor in-kind with new waterproofing. 2nd flr bath - new tub shower, new vanity, new finishes. | $60,000 |
| Jun 16, 2020 | Never finaled issued Jul 2020, no final | 36 White St | backing for shelving, sheetrock, new wall shelving and refinishing concrete floors for new epoxy floor.Details
backing for shelving, sheetrock, new wall shelving and refinishing concrete floors for new epoxy floor. | $10,000 |
| Jan 28, 2020 | Completed final sign-off Apr 2023 | 1259 Filbert St | revision to pa# 2019-1212-9315: re-arrange bathroom & windows at 1st floor. replace foundation at garage. all details no change. shall follow previous approved plans.Details
revision to pa# 2019-1212-9315: re-arrange bathroom & windows at 1st floor. replace foundation at garage. all details no change. shall follow previous approved plans. | $20,000 |
| Jan 15, 2020 | Completed final sign-off Feb 2021 | 2842 Filbert St | concrete sport court at rear yard. refinishe e cmu wall with concrete stepsDetails
concrete sport court at rear yard. refinishe e cmu wall with concrete steps | $2,000 |
| Jan 9, 2020 | Completed final sign-off Jul 2022 | 1261 Filbert St | interior remodel on main floor & convert (e) storage @ basement into habitable space. add stair connect new habitable space @ basement floor, add 1 bedroom, 1 bathroo and laundry on basement floor. replace (e) brick retaining wall foundationDetails
interior remodel on main floor & convert (e) storage @ basement into habitable space. add stair connect new habitable space @ basement floor, add 1 bedroom, 1 bathroo and laundry on basement floor. replace (e) brick retaining wall foundation | $80,000 |
| Dec 12, 2019 | Completed final sign-off Apr 2023 | 1259 Filbert St | interior remodel on 2nd fl. combine living and bedroom into master suite. remodel kitchen. add 1 1/2 bath and stair connect new habitable space on 1st fl. new lighting throughout.convert 1st fl rear portion of garage into playroom, 1 bedroom, 1 bath, laundryDetails
interior remodel on 2nd fl. combine living and bedroom into master suite. remodel kitchen. add 1 1/2 bath and stair connect new habitable space on 1st fl. new lighting throughout.convert 1st fl rear portion of garage into playroom, 1 bedroom, 1 bath, laundry | $20,000 |
| Aug 7, 2019 | Never finaled issued Aug 2019, no final | 2116 Baker St | replace sink and stone conter top, new facet rough in to remain, new smart switchesDetails
replace sink and stone conter top, new facet rough in to remain, new smart switches | $10,000 |
| Jun 25, 2019 | Completed final sign-off Aug 2019 | 1760 Dolores St | remodel bathroom. replace tub, vanity, tile. existing plumbing to remain. install new shower valve, new can lights, kitchen reface. new doors and new countertops. all existing electrical and plumbing to remain the same. bathroom: 5' x 8'. kitchen: 8' x 8'.Details
remodel bathroom. replace tub, vanity, tile. existing plumbing to remain. install new shower valve, new can lights, kitchen reface. new doors and new countertops. all existing electrical and plumbing to remain the same. bathroom: 5' x 8'. kitchen: 8' x 8'. | $30,000 |
| Mar 22, 2019 | Completed final sign-off Jul 2020 | 99 22nd Av | electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closetDetails
electrical upgrade; 1st fl - kitchen remodel & powder room, remove glassblock opening; 2nd fl - remodel (e) master bath, bath 2, add new bath & master closet | $300,000 |