Jjay Builders
- Based in
- Daly City
- On San Francisco permits
- Aug 2018 to Jun 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 10 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | Completed final sign-off Sep 2026 | 1998 Bush St | to obtain final inspection for work approved under pa# 2024-0814-8603. all work is completeDetails
to obtain final inspection for work approved under pa# 2024-0814-8603. all work is complete | |
| Mar 16, 2026 | Completed final sign-off Apr 2026 | 85 Sharon St | to obtin final inspection for work approved under pa #202502059725. all work is complete.Details
to obtin final inspection for work approved under pa #202502059725. all work is complete. | |
| Dec 12, 2025 | Completed final sign-off Feb 2026 | 2325 Ortega St | recommencement and completion of work approved under pa# 2024-0419-0327Details
recommencement and completion of work approved under pa# 2024-0419-0327 | $30,000 |
| Oct 10, 2025 | Completed final sign-off Jan 2026 | 1859 31st Av | kitchen remodel: new cabinet, countertop and power outlet.Details
kitchen remodel: new cabinet, countertop and power outlet. | $30,000 |
| May 15, 2025 | Completed final sign-off Jun 2025 | 1998 Bush St | revision to permit 202408148603. dryrot approx. 24sf of siding-exterior wall and roof repair at the rear approx. 12x12 feet.Details
revision to permit 202408148603. dryrot approx. 24sf of siding-exterior wall and roof repair at the rear approx. 12x12 feet. | $2,900 |
| Feb 5, 2025 | Expired or cancelled expired Apr 2026 | 85 Sharon St | remodel kitchen like for like, new cabinets & countertops. remodel bathroom like for like, convert (e) bathtub to shower pan. replace 2 (e) windows like for like in sunroom, not visible from street.Details
remodel kitchen like for like, new cabinets & countertops. remodel bathroom like for like, convert (e) bathtub to shower pan. replace 2 (e) windows like for like in sunroom, not visible from street. | $20,000 |
| Aug 14, 2024 | Expired or cancelled expired Sep 2026 | 1998 Bush St | 1998 bush aka 1900 buchanan st: comply w/ nov #202423193: legalize as-built non-structural furr wall, as-built staircase, & electrical sub-panel.Details
1998 bush aka 1900 buchanan st: comply w/ nov #202423193: legalize as-built non-structural furr wall, as-built staircase, & electrical sub-panel. | $50,000 |
| Apr 19, 2024 | In progress issued Apr 2024 | 2325 Ortega St | one kitchen remodel, cabinet countertop, sink. upgrade service panel. non structuralDetails
one kitchen remodel, cabinet countertop, sink. upgrade service panel. non structural | $33,000 |
| Aug 23, 2023 | Expired or cancelled cancelled Mar 2025 | 2055 18th Av | bathroom remodel. convert bath tub to shower. shower pan, faucet, fixture, light. approx 40 sq. ft., no framing demo.Details
bathroom remodel. convert bath tub to shower. shower pan, faucet, fixture, light. approx 40 sq. ft., no framing demo. | $20,000 |
| Jul 26, 2023 | Never finaled issued Jul 2023, no final | 2315 20th Av | diconnect (e) tankless water heater (remove). repair rear stairway (less than 50%). to comply with nov 202309805 #2, #6 and its entiretyDetails
diconnect (e) tankless water heater (remove). repair rear stairway (less than 50%). to comply with nov 202309805 #2, #6 and its entirety | $1,800 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 4133 19th Av | one kitchen remodel. cabinet, countertop. upgrade 200 amp panel. replace waterline (underground). meter to main valve.Details
one kitchen remodel. cabinet, countertop. upgrade 200 amp panel. replace waterline (underground). meter to main valve. | $26,000 |
| Apr 13, 2022 | Completed final sign-off Nov 2022 | 245 Dorado Tr | remodel one kitchen and two bathrooms some electric and plumbing. non structural work. work to be done at 247 dorado terrace (2 units building)Details
remodel one kitchen and two bathrooms some electric and plumbing. non structural work. work to be done at 247 dorado terrace (2 units building) | $8,000 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 460 Filbert St | unit 2 - retile 1 bath floor and wall. replace shower door, shower headDetails
unit 2 - retile 1 bath floor and wall. replace shower door, shower head | $7,600 |
| Aug 30, 2019 | Completed final sign-off May 2020 | 2379 44th Av | add a family, a bedroom and a full bathroom on the 1st fl. replace water heater to tankless typeDetails
add a family, a bedroom and a full bathroom on the 1st fl. replace water heater to tankless type | $45,000 |
| Aug 6, 2018 | Completed final sign-off Jan 2019 | 286 Sadowa St | interior remodel. add 1 bedroom, 1 full bath, 1 media room at ground fl per planDetails
interior remodel. add 1 bedroom, 1 full bath, 1 media room at ground fl per plan | $40,888 |