Jhy Construction Inc
- Based in
- Alameda
- On San Francisco permits
- Jul 2012 to Jun 2018
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2018 | Completed final sign-off Oct 2018 | 70 Manor Dr | install 3 (n) skylights at front living room, skylights are not visible from public right of way. convert rear exterior closet on 2nd fl (ne corner of bldg) to a shower, to be connected to bath 2. add (n) window at bath 2- rear shower wall/rear facade. replace inkind 17 windows on theDetails
install 3 (n) skylights at front living room, skylights are not visible from public right of way. convert rear exterior closet on 2nd fl (ne corner of bldg) to a shower, to be connected to bath 2. add (n) window at bath 2- rear shower wall/rear facade. replace inkind 17 windows on the | $8,000 |
| May 29, 2018 | Completed final sign-off Oct 2018 | 70 Manor Dr | demo lathe & plaster at 2nd & 3rd flrs. remove load bearing wall btw dining and kitchen. reinforce roof framing @ 2nd flr living rm. remodel 1 kitchen & 3 bathrooms. reframe bedroom closets @3rd flr. relocate & expand master bath @3rd. replace/add interios doorsDetails
demo lathe & plaster at 2nd & 3rd flrs. remove load bearing wall btw dining and kitchen. reinforce roof framing @ 2nd flr living rm. remodel 1 kitchen & 3 bathrooms. reframe bedroom closets @3rd flr. relocate & expand master bath @3rd. replace/add interios doors | $50,000 |
| Jan 29, 2018 | Completed final sign-off Feb 2019 | 3201 Mission St | ground flr - commercial ti - demise (e) space into 2 seperate units, build out to northern unit to include non structural partition walls, new suspended ceiling, lighting. new electrical, new ada compliant entry on fair ave. new service sink, (e) bath fixtures to be replaced in kind. hvac under sepDetails
ground flr - commercial ti - demise (e) space into 2 seperate units, build out to northern unit to include non structural partition walls, new suspended ceiling, lighting. new electrical, new ada compliant entry on fair ave. new service sink, (e) bath fixtures to be replaced in kind. hvac under sep | $20,000 |
| Dec 13, 2017 | Expired or cancelled withdrawn Mar 2018 | 3201 Mission St | new entry door on fair ave.Details
new entry door on fair ave. | $3,000 |
| Nov 16, 2017 | Completed final sign-off Jan 2018 | 3201 Mission St | g/f- soft demo on g/f commercial office space, remove all partitions, no structural work, per ab-017, space to remain vacant.Details
g/f- soft demo on g/f commercial office space, remove all partitions, no structural work, per ab-017, space to remain vacant. | $15,000 |
| Nov 1, 2017 | Completed final sign-off Mar 2018 | 3201 Mission St | commercial- soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
commercial- soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $15,000 |
| Nov 1, 2017 | Completed final sign-off Mar 2018 | 3201 Mission St | residential- soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential- soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $30,000 |
| Oct 19, 2016 | Completed final sign-off Mar 2017 | 1336 04th Av | to comply with nov 201640891 - widen (e) garage opening by net 11" inches, replace (e) garage door with new carriage style wood door, create new shear wall adjacent to garage door openingDetails
to comply with nov 201640891 - widen (e) garage opening by net 11" inches, replace (e) garage door with new carriage style wood door, create new shear wall adjacent to garage door opening | $5,000 |
| Jul 29, 2016 | Completed final sign-off Mar 2017 | 1336 04th Av | replace (e) post footings on ground floor. replace (e) non-structural slab on ground floorDetails
replace (e) post footings on ground floor. replace (e) non-structural slab on ground floor | $3,000 |
| Apr 27, 2016 | Completed final sign-off Mar 2017 | 1336 04th Av | interior remodel at 1st floor, kitchen at 2nd floor, master bedroom at 3rd floor. all baths. horizontal subterranean expansion at 1st floor. infill pop out at 2nd floor/ repair 3rd floor rear popout in kind, add new master bath at 3rd floor/replace all rear wndws and siding.Details
interior remodel at 1st floor, kitchen at 2nd floor, master bedroom at 3rd floor. all baths. horizontal subterranean expansion at 1st floor. infill pop out at 2nd floor/ repair 3rd floor rear popout in kind, add new master bath at 3rd floor/replace all rear wndws and siding. | $125,000 |
| Aug 27, 2015 | Never finaled issued Feb 2017, no final | 274 Duncan St | vertical addition. remodel (e) 2 flr o/crawl space, add 3rd, 4th flrs, 2 new kitchens, 4 new full baths, 2 (n) 1/2 baths.Details
vertical addition. remodel (e) 2 flr o/crawl space, add 3rd, 4th flrs, 2 new kitchens, 4 new full baths, 2 (n) 1/2 baths. | $550,000 |
| Apr 1, 2015 | Completed final sign-off Jul 2017 | 1330 Hampshire St | side horizontal & 2 story vertical addition to transform (e) single family residence to 2 family residence. renovate (e) unit to expand down for master suite area. facade renovation, new shared entry space & new parking space.Details
side horizontal & 2 story vertical addition to transform (e) single family residence to 2 family residence. renovate (e) unit to expand down for master suite area. facade renovation, new shared entry space & new parking space. | $510,000 |
| Jun 24, 2014 | Completed final sign-off May 2018 | 1 Reposa Wy | revision to pa# 201312244953. increase valuation to add additional $100,000Details
revision to pa# 201312244953. increase valuation to add additional $100,000 | |
| May 21, 2014 | Completed final sign-off May 2018 | 1 Reposa Wy | revision to pa# 201312244953 remodel upstairs bathDetails
revision to pa# 201312244953 remodel upstairs bath | $4,000 |
| Dec 24, 2013 | Completed final sign-off Sep 2014 | 1 Reposa Wy | 1st fl: add a exercise room, a bedroom, a bath, a storage and a laundry room. 2nd fl: remodel kitchen, relocate living room, replace (e) windows w/new in kind.Details
1st fl: add a exercise room, a bedroom, a bath, a storage and a laundry room. 2nd fl: remodel kitchen, relocate living room, replace (e) windows w/new in kind. | $40,000 |
| Aug 30, 2012 | Completed final sign-off Apr 2013 | 1669 07th Av | foundation work due to increasing headroom on ground floor per planDetails
foundation work due to increasing headroom on ground floor per plan | $4,000 |
| Jul 26, 2012 | Completed final sign-off Apr 2013 | 1669 07th Av | remodel ground floor to have 2 bedrooms, 1 full bathroom, storage & laundry room. install new gas furnace & water heater in garage. 2nd floor-remodel kitchen & convert 1 full bathroom into 2 full bathroomsDetails
remodel ground floor to have 2 bedrooms, 1 full bathroom, storage & laundry room. install new gas furnace & water heater in garage. 2nd floor-remodel kitchen & convert 1 full bathroom into 2 full bathrooms | $53,000 |