Jewell Construction
- Based in
- Woodland
- On San Francisco permits
- Oct 2018 to Jun 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2019 | Completed final sign-off Oct 2019 | 321 Precita Av | replace (15) windows in kind with replacement insert windows. completely repaint entire exterior facade at all side- front, sides and rear. set up scaffolding aroung all sides for painting access. new windows to be marvin ultimate clad series with "ogee: profile sash lug to preserve original look.Details
replace (15) windows in kind with replacement insert windows. completely repaint entire exterior facade at all side- front, sides and rear. set up scaffolding aroung all sides for painting access. new windows to be marvin ultimate clad series with "ogee: profile sash lug to preserve original look. | $49,000 |
| Oct 16, 2018 | Completed final sign-off Dec 2018 | 321 Precita Av | remove/replace (e) floor with new tile floor in water closet.remove all existing finishes and electrical and plumbing fixtures.new tile walls at the three walls new tile floor at tub/ sink bathroom fixture all at new location. new window at tub/shower room. add exhaust fan at tub.new sheetrock.Details
remove/replace (e) floor with new tile floor in water closet.remove all existing finishes and electrical and plumbing fixtures.new tile walls at the three walls new tile floor at tub/ sink bathroom fixture all at new location. new window at tub/shower room. add exhaust fan at tub.new sheetrock. | $60,000 |