Jason Barber Construction Llc
- Based in
- San Diego
- On San Francisco permits
- Jun 2023 to Aug 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2023 | Completed final sign-off Nov 2023 | 3251 20th Av | #155: revision to 202306200439. update layout,floor plan and location of sales area fixtures. revise plumb permit remove drinking fountain. elec permit updated to show e service equipDetails
#155: revision to 202306200439. update layout,floor plan and location of sales area fixtures. revise plumb permit remove drinking fountain. elec permit updated to show e service equip | |
| Jun 20, 2023 | Completed final sign-off Nov 2023 | 3251 20th Av | #155: interior alteration to an (e) tenant space to house retail occup. scope includes new finishes and fixtures, while reusing the (e) walls, stock area, and (1) full access. toilet rm & modifications & extensions of (e) mep systems. no exterior work. no change of use.Details
#155: interior alteration to an (e) tenant space to house retail occup. scope includes new finishes and fixtures, while reusing the (e) walls, stock area, and (1) full access. toilet rm & modifications & extensions of (e) mep systems. no exterior work. no change of use. | $89,000 |