James Smith
- Based in
- San Francisoc
- On San Francisco permits
- Feb 2003 to Apr 2004
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2004 | Completed final sign-off Dec 2004 | 1339 Vallejo St | replace 1 cabinet in kitchen replace tub in bathroom and sink remodel of apt replace sheetrock in 3Details
replace 1 cabinet in kitchen replace tub in bathroom and sink remodel of apt replace sheetrock in 3 | $15,000 |
| Jan 20, 2004 | Completed final sign-off Apr 2004 | 1632 Taylor St | install gas insert, ul listed in living roomDetails
install gas insert, ul listed in living room | $2,000 |
| Feb 5, 2003 | Completed final sign-off Mar 2004 | 1339 Vallejo St | comply with 3r-3806Details
comply with 3r-3806 | $500 |