James Deasy
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Feb 2023
- Last 24 months
- 0 permits filed
22 permits since 2000: 15 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2023 | Completed final sign-off Jul 2023 | 1400 08th Av | replace glazing in the commercial space corner market. total 7 litesDetails
replace glazing in the commercial space corner market. total 7 lites | $10,000 |
| Feb 1, 2023 | Completed final sign-off Feb 2024 | 5451 Mission St | to renew for final. 201312033201. all workDetails
to renew for final. 201312033201. all work | |
| Sep 22, 2021 | Completed final sign-off Nov 2021 | 111 Cuvier St | dryrot repairs to back addition at eaves and gutter, replacement of gutter. shingle roof patching. all work in kindDetails
dryrot repairs to back addition at eaves and gutter, replacement of gutter. shingle roof patching. all work in kind | $5,000 |
| Jul 25, 2018 | Never finaled issued Jul 2018, no final | 1408 08th Av | street spaceDetails
street space | |
| Jun 19, 2017 | Completed final sign-off Aug 2024 | 1400 08th Av | soft story retrofit per 2016 sfebc chapeter 4d appx a4 commercial add new plyshear walls & simpson strong walls with new foundations residential 201706199744Details
soft story retrofit per 2016 sfebc chapeter 4d appx a4 commercial add new plyshear walls & simpson strong walls with new foundations residential 201706199744 | $20,000 |
| Jun 19, 2017 | Completed final sign-off Aug 2024 | 1408 08th Av | soft story retrofit per 2016 sfebc chapeter 4d appx a4 residential add new plyshear walls & simpson strong walls with new foundations commercial 201706199744Details
soft story retrofit per 2016 sfebc chapeter 4d appx a4 residential add new plyshear walls & simpson strong walls with new foundations commercial 201706199744 | $75,000 |
| Apr 16, 2014 | Completed final sign-off Aug 2015 | 778 32nd Av | remodel kitchen in both unitsDetails
remodel kitchen in both units | $140,000 |
| Apr 5, 2011 | Completed final sign-off Oct 2011 | 110 Carl St | revision to pa# 2010.1227.74.30. replace (e) concrete footings at post/beam system at garage level due to inferior concrete.Details
revision to pa# 2010.1227.74.30. replace (e) concrete footings at post/beam system at garage level due to inferior concrete. | $6,500 |
| Mar 18, 2011 | Completed final sign-off Aug 2011 | 10 Florentine Av | installation of new door in rear of building (2/f), replace & paint of 4 guard rails at back staircase with redwood, complete replacement of frame & door at roof, install exterior door to garbage can open. repalce in kind & comply with nov #201193368Details
installation of new door in rear of building (2/f), replace & paint of 4 guard rails at back staircase with redwood, complete replacement of frame & door at roof, install exterior door to garbage can open. repalce in kind & comply with nov #201193368 | $4,000 |
| Dec 27, 2010 | Completed final sign-off Oct 2011 | 110 Carl St | voluntary addition of anchor bolts to (e) foundation. add plywood to (e) rear wall and light well wallsDetails
voluntary addition of anchor bolts to (e) foundation. add plywood to (e) rear wall and light well walls | $2,500 |
| Sep 7, 2010 | Completed final sign-off Nov 2010 | 48 Landers St | kitchen remodel: (n) cabinets, appliances & finishes on 1-wall only. plumbing & electrical work under separate permits, no structural changes. min 50% of kitchen light wattage be in high efficency lights.Details
kitchen remodel: (n) cabinets, appliances & finishes on 1-wall only. plumbing & electrical work under separate permits, no structural changes. min 50% of kitchen light wattage be in high efficency lights. | $15,000 |
| Jan 5, 2009 | Expired or cancelled expired Feb 2010 | 52 Ceres St | to obtain a final inspection for work approved under pa#200804028612. all work has been completed.Details
to obtain a final inspection for work approved under pa#200804028612. all work has been completed. | |
| Apr 2, 2008 | Expired or cancelled expired Feb 2010 | 52 Ceres St | interior, non-structural work. combine 2 existing bath rooms into one bathroom including widening doorways and new plumbing fixtures, at 2nd fl.Details
interior, non-structural work. combine 2 existing bath rooms into one bathroom including widening doorways and new plumbing fixtures, at 2nd fl. | $9,000 |
| Dec 4, 2006 | Completed final sign-off Apr 2007 | 743 29th Av | renew pa#2005/12/28/1168 to continue workDetails
renew pa#2005/12/28/1168 to continue work | $10,000 |
| May 10, 2006 | Completed final sign-off Jul 2006 | 743 29th Av | replace of rotten stair w/ new redwood stair and const of new fire resistive wall.Details
replace of rotten stair w/ new redwood stair and const of new fire resistive wall. | $11,800 |
| Dec 28, 2005 | Expired or cancelled expired Jul 2006 | 743 29th Av | bathroom remodel- replace tub, lavatory, lighting fixtures, and ceramic tile floor, wainscot, and tub surroundDetails
bathroom remodel- replace tub, lavatory, lighting fixtures, and ceramic tile floor, wainscot, and tub surround | $15,000 |
| Nov 29, 2005 | Expired or cancelled expired Jul 2006 | 743 29th Av | repairing existing single story, straight-flight exterior wood-frame staircase at the north side of the house, repair less than 50 percentDetails
repairing existing single story, straight-flight exterior wood-frame staircase at the north side of the house, repair less than 50 percent | $4,500 |
| Jan 24, 2001 | Completed final sign-off Jun 2001 | 1670 17th Av | this permit to increase size of kitchen skylight from 3;o x 3'0 to 4'0 x 5'0"Details
this permit to increase size of kitchen skylight from 3;o x 3'0 to 4'0 x 5'0" | $15,000 |
| Dec 27, 2000 | Completed final sign-off Sep 2001 | 144 Downey St | sound attenuation. no structural changes. new walls, ceiling, & floor coverings. unit 144 on 2nd levDetails
sound attenuation. no structural changes. new walls, ceiling, & floor coverings. unit 144 on 2nd lev | $50,000 |
| Dec 27, 2000 | Completed final sign-off Jun 2001 | 187 Belvedere St | remodel of kitchen. no structural changes. no changes to windows.Details
remodel of kitchen. no structural changes. no changes to windows. | $10,000 |
| Nov 15, 2000 | Expired or cancelled expired May 2001 | 1670 17th Av | kitchen remodel - new cabinets, new window, new plumbing, new lightsDetails
kitchen remodel - new cabinets, new window, new plumbing, new lights | $12,000 |
| Sep 8, 2000 | Expired or cancelled expired Jan 2001 | 116 Downey St | renewal of application 9925637 for final inspection onlyDetails
renewal of application 9925637 for final inspection only |