Jam Construction Inc
- Based in
- Woodacre
- On San Francisco permits
- Nov 2007 to Jun 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2018 | Completed final sign-off Dec 2018 | 630 17th Av | install (5) new retro-fit windows, same size. same style. u-factor 0.32 max. not visible. install new cabinets in den. remodel two (e) bathrooms, in koind. new fixtures and tiles. rooms are 5'x8'Details
install (5) new retro-fit windows, same size. same style. u-factor 0.32 max. not visible. install new cabinets in den. remodel two (e) bathrooms, in koind. new fixtures and tiles. rooms are 5'x8' | $82,000 |
| Nov 16, 2007 | Completed final sign-off Mar 2008 | 30 Miller Pl | remove existing tile, expoy seal fl, install new shower valve, new tile shower, floor.Details
remove existing tile, expoy seal fl, install new shower valve, new tile shower, floor. | $10,000 |