Jakela Inc
- Based in
- Novato
- On San Francisco permits
- Oct 2022 to Apr 2025
- Last 24 months
- 2 permits filed
7 permits since 2000: 1 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2025 | In progress issued Apr 2025 | 1270 Pacific Av | abatement of existing structural in conjunction with demo permit pa #202305026961 for asbestosDetails
abatement of existing structural in conjunction with demo permit pa #202305026961 for asbestos | |
| Mar 19, 2025 | In progress issued Mar 2025 | 2915 Vallejo St | manually remove 1300 sf. of racm gup board from ceilng and walls, will use wet methods for removel, final clean in 6 will include hepa vacuum hepa vacuuming and wiping all surfaces in containment area material will be placed in double polyethylene bags labeled manifiested and disposed as hazardousDetails
manually remove 1300 sf. of racm gup board from ceilng and walls, will use wet methods for removel, final clean in 6 will include hepa vacuum hepa vacuuming and wiping all surfaces in containment area material will be placed in double polyethylene bags labeled manifiested and disposed as hazardous | $5,000 |
| Feb 6, 2024 | In progress issued Feb 2024 | 459 Clipper St | remove abestos insulated duckwork and bootsDetails
remove abestos insulated duckwork and boots | $2,125 |
| Sep 29, 2023 | Never finaled issued Sep 2023, no final | 4333 26th St | asbestos abatement: drywall containing asbestos and vinyl flooring containing asbestos. approx. 950 sq. ft. of area.Details
asbestos abatement: drywall containing asbestos and vinyl flooring containing asbestos. approx. 950 sq. ft. of area. | $9,827 |
| Sep 15, 2023 | Completed final sign-off Nov 2024 | 1347 27th Av | asbestos abatementDetails
asbestos abatement | $6,000 |
| Sep 11, 2023 | Never finaled issued Sep 2023, no final | 15 Walnut St | asbestos containing materials and lead-base dpain remediation per pro-tech consulting and engineering report, dated 12/27/2002. for removal of acm and lbp throughout building.Details
asbestos containing materials and lead-base dpain remediation per pro-tech consulting and engineering report, dated 12/27/2002. for removal of acm and lbp throughout building. | $50,000 |
| Oct 3, 2022 | Expired or cancelled expired Feb 2026 | 576 27th Av | to comply with complaint # 201998301: asbestos removal in kitchen and bathroom floor.Details
to comply with complaint # 201998301: asbestos removal in kitchen and bathroom floor. | $3,000 |