Jaie Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2013 to Jun 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 8 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2025 | Completed final sign-off Dec 2025 | 175 Seal Rock Dr | 1) kitchen remodel at top floor. 2) electrical upgrade by code. 3) plumbing. (all work top floor kitchen).Details
1) kitchen remodel at top floor. 2) electrical upgrade by code. 3) plumbing. (all work top floor kitchen). | $20,000 |
| Nov 10, 2022 | In progress issued Apr 2026 | 2725 Clement St | to abate planning code 2020-004694enf. remove un-permitted horizontal and vertical expansions. legalize unauthorized dwelling unit on ground floor through the addition of an adu. new adu to be located within last recorded/authorized building envelope.Details
to abate planning code 2020-004694enf. remove un-permitted horizontal and vertical expansions. legalize unauthorized dwelling unit on ground floor through the addition of an adu. new adu to be located within last recorded/authorized building envelope. | $120,000 |
| Nov 9, 2022 | Completed final sign-off Nov 2023 | 632 London St | revision to pa#2018-1107-5335/r2: title 24 submission additional dwelling unit. remove q11 hers testDetails
revision to pa#2018-1107-5335/r2: title 24 submission additional dwelling unit. remove q11 hers test | |
| Mar 24, 2022 | Completed final sign-off Nov 2023 | 632 London St | renewal for final inspection 201811075335Details
renewal for final inspection 201811075335 | |
| Jun 8, 2021 | Completed final sign-off Jun 2021 | 2530 San Jose Av | front siding (dry rot) to be replaced with plywood sidings with same patter, total area 500 sq. ft.Details
front siding (dry rot) to be replaced with plywood sidings with same patter, total area 500 sq. ft. | $6,500 |
| Nov 7, 2018 | Expired or cancelled expired Nov 2023 | 632 London St | addition of a living room, dining, kitchen and bedroom and a three fixture bathroom at the garage level per ordinance 162-16. remove interior stairs at both floors of building to create two separate units. to comply with nov #200725091 & #201486691.Details
addition of a living room, dining, kitchen and bedroom and a three fixture bathroom at the garage level per ordinance 162-16. remove interior stairs at both floors of building to create two separate units. to comply with nov #200725091 & #201486691. | $40,000 |
| Oct 23, 2018 | Completed final sign-off Apr 2019 | 100 Sickles Av | revision on title 24Details
revision on title 24 | |
| Jan 29, 2018 | Completed final sign-off Apr 2019 | 100 Sickles Av | tenant improvement from a retail store to a barber shopDetails
tenant improvement from a retail store to a barber shop | $40,000 |
| May 12, 2016 | Completed final sign-off Jul 2017 | 70 Regent St | bedroom addition to (e) unenclosed space at the rear. bathroom/kitchen renovation/upgrade upstairs. add bathroom @ garage level with plumbing connection. upgrade electrical panel. front facade window to be wood frame, same operation. keep original garage drive. maher ord 155-13 naDetails
bedroom addition to (e) unenclosed space at the rear. bathroom/kitchen renovation/upgrade upstairs. add bathroom @ garage level with plumbing connection. upgrade electrical panel. front facade window to be wood frame, same operation. keep original garage drive. maher ord 155-13 na | $30,000 |
| Oct 17, 2013 | Completed final sign-off Feb 2015 | 2621 San Jose Av | document and legalize new/as-built bathrooms. install new windows in bedrooms 4 and 5. new plumbing associated with new bathrooms.Details
document and legalize new/as-built bathrooms. install new windows in bedrooms 4 and 5. new plumbing associated with new bathrooms. | $20,000 |