J Z Construction
- Based in
- Oakland
- On San Francisco permits
- Mar 2011 to Apr 2025
- Last 24 months
- 2 permits filed
12 permits since 2000: 8 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2025 | Completed final sign-off Oct 2025 | 388 Park St | in kind window replacement, 23 windows at park (14) and andover st (4) frontages, wood clad windows, 5 windows being replaced at rear to be vinyl, no changes to opening size or operation to comply with nov 202534769 item 2 0.3 max u-factorDetails
in kind window replacement, 23 windows at park (14) and andover st (4) frontages, wood clad windows, 5 windows being replaced at rear to be vinyl, no changes to opening size or operation to comply with nov 202534769 item 2 0.3 max u-factor | $28,000 |
| Feb 19, 2025 | Completed final sign-off Dec 2025 | 584 02nd Av | replacement of 18 windows in kind. no changes to opening size or operation. wood aluminum clad for the 6 facade windows, vinyl for remaining windows. 80 sq,ft siding replacement on left (southeast) side of bldg(facing the bldg from back yard) partial compliance with n.o.v #202420052 (window changes)Details
replacement of 18 windows in kind. no changes to opening size or operation. wood aluminum clad for the 6 facade windows, vinyl for remaining windows. 80 sq,ft siding replacement on left (southeast) side of bldg(facing the bldg from back yard) partial compliance with n.o.v #202420052 (window changes) | $21,000 |
| May 3, 2024 | Completed final sign-off May 2025 | 152 Lombard St | unit 405; replace counter top in kitchen (20 ft2) (no other work in kitchen) and bathroom remodel in kind (55 sqft). no moving walls. all fixtures in the same location.Details
unit 405; replace counter top in kitchen (20 ft2) (no other work in kitchen) and bathroom remodel in kind (55 sqft). no moving walls. all fixtures in the same location. | $20,000 |
| Apr 18, 2024 | Completed final sign-off Nov 2025 | 388 Park St | unit#: a; in kind kitchen and bath remodel. replace cabinets, countertops and appliances in 90 sq ft kitchen. replace shower tub and vanity 60 sq ft bathroomDetails
unit#: a; in kind kitchen and bath remodel. replace cabinets, countertops and appliances in 90 sq ft kitchen. replace shower tub and vanity 60 sq ft bathroom | $25,000 |
| Feb 15, 2024 | Completed final sign-off Dec 2025 | 584 02nd Av | deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairsDetails
deck replacement at rear of the building to comply with nov# 2024200052. elimination of e) stairs, proposed n) spiral stairs | $5,000 |
| Feb 15, 2024 | Expired or cancelled withdrawn Aug 2025 | 584 02nd Av | reroofing: new roof in kind replace all downspouts in kind torch downDetails
reroofing: new roof in kind replace all downspouts in kind torch down | $25,000 |
| Sep 13, 2023 | Never finaled issued Sep 2023, no final | 494 Bartlett St | repair 29lf side/rear 7ft fence in-kind at south side of buildng, 26th st. frontage. repair includes board replacement only throughout 29lf of side fenceDetails
repair 29lf side/rear 7ft fence in-kind at south side of buildng, 26th st. frontage. repair includes board replacement only throughout 29lf of side fence | $7,000 |
| Mar 21, 2023 | Completed final sign-off Feb 2024 | 573 Scott St | remove (e) vinyl-siding at south facade. exterior work only. to add stucco to match front facade.Details
remove (e) vinyl-siding at south facade. exterior work only. to add stucco to match front facade. | $2,000 |
| Nov 28, 2018 | Never finaled issued Dec 2018, no final | 679 Teresita Bl | install gravel beds for erosion controlDetails
install gravel beds for erosion control | $1,000 |
| Sep 12, 2018 | Completed final sign-off Nov 2018 | 675 Teresita Bl | retrofit extg retaining wall in rear yard.Details
retrofit extg retaining wall in rear yard. | $40,000 |
| Mar 24, 2015 | Completed final sign-off Jul 2016 | 460 Andover St | interior remodeling: add 2nd unit to ground floor, partial foundation replacement. no building enlargementDetails
interior remodeling: add 2nd unit to ground floor, partial foundation replacement. no building enlargement | $60,000 |
| Mar 17, 2011 | Never finaled issued Mar 2011, no final | 410 Shrader St | repair damage only on stairs, less than 50% repair, rear stairs.Details
repair damage only on stairs, less than 50% repair, rear stairs. | $2,000 |