J U V Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2006 to Dec 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2011 | Completed final sign-off Oct 2016 | 2608 Post St | front and rear building: new fire sprinkler system through-out front and back building per nfpa 13 with new 4" fire service. site permit 200601132087.Details
front and rear building: new fire sprinkler system through-out front and back building per nfpa 13 with new 4" fire service. site permit 200601132087. | $12,000 |
| Aug 12, 2011 | Completed final sign-off Oct 2012 | 2608 Post St | renew pa#201002035858 issued 2/3/10 to finish workDetails
renew pa#201002035858 issued 2/3/10 to finish work | $25,000 |
| Feb 23, 2011 | Completed final sign-off Aug 2011 | 3647 23rd St | revision to 201001215126 and 201002116387 as built condition for structural framing and foundation. eliminate basement under garage locationDetails
revision to 201001215126 and 201002116387 as built condition for structural framing and foundation. eliminate basement under garage location | |
| Feb 11, 2010 | Completed final sign-off Aug 2011 | 3647 23rd St | new storefront @ ground floor commercial space facing 23rd st, replace (e)alum windows @fair oaks/23rd w/new.replace siding,modify resid facade @ fair oaks to add new windows,new entry dr,new door @ exit passage,new walkable rooftop surface 305 sf vert.addition, new access stair to roof,new curb cutDetails
new storefront @ ground floor commercial space facing 23rd st, replace (e)alum windows @fair oaks/23rd w/new.replace siding,modify resid facade @ fair oaks to add new windows,new entry dr,new door @ exit passage,new walkable rooftop surface 305 sf vert.addition, new access stair to roof,new curb cut | $80,000 |
| Nov 18, 2008 | Completed final sign-off Jan 2009 | 615 20th Av | renew pa# 2005/10/18/5864 to complete work & obtain final inspection.Details
renew pa# 2005/10/18/5864 to complete work & obtain final inspection. | $10,000 |
| Oct 31, 2008 | Completed final sign-off Nov 2008 | 615 20th Av | exterior painting, fiber cement siding at rear elevation.Details
exterior painting, fiber cement siding at rear elevation. | $12,500 |
| Jan 13, 2006 | Completed final sign-off Oct 2012 | 2608 Post St | erect 4 stories 2 family dwelling bldg.Details
erect 4 stories 2 family dwelling bldg. | $600,000 |