J & T Construction
- Based in
- San Mateo
- On San Francisco permits
- Jan 2023 to Jul 2026
- Last 24 months
- 11 permits filed
13 permits since 2000: 8 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 3535 Wawona St | unit 414- replace tub with roll in accessible shower. only work identifiedDetails
unit 414- replace tub with roll in accessible shower. only work identified | $10,000 |
| Apr 30, 2026 | In progress issued May 2026 | 1476 Willard St | remodel (e) powder room and expand floor area into an adjacent closet. 2nd floor add (n) powder room. remove and infill (e) window on the side not visible from streetDetails
remodel (e) powder room and expand floor area into an adjacent closet. 2nd floor add (n) powder room. remove and infill (e) window on the side not visible from street | $10,000 |
| Jul 17, 2025 | In progress issued Jan 2026 | 3620 Wawona St | revision to permit pa #201607293733 to relocate sinks and various cafe and roasting equipment. addition of signage, sunshade, and bench at front facade.Details
revision to permit pa #201607293733 to relocate sinks and various cafe and roasting equipment. addition of signage, sunshade, and bench at front facade. | $35,000 |
| Jun 18, 2025 | Completed final sign-off Apr 2026 | 2461 21st Av | front bldg: relocate & replace north side 2nd/f closet window. replace south side 2nd/f bathroom windowDetails
front bldg: relocate & replace north side 2nd/f closet window. replace south side 2nd/f bathroom window | $3,000 |
| May 30, 2025 | Completed final sign-off Apr 2026 | 2461 21st Av | remodel 2nd floor bath, convert 2nd floor bedroom closet into a bathroom. new skylight.Details
remodel 2nd floor bath, convert 2nd floor bedroom closet into a bathroom. new skylight. | $37,800 |
| May 29, 2025 | Completed final sign-off Nov 2025 | 258 Parnassus Av | improvements to street facing facade: remove (e) t1-11 siding and replace with original stucco. replace (e) 4 flider-style aluminum windows with new glider-style energy efficient windows of the same size and location.u=0.3 maxDetails
improvements to street facing facade: remove (e) t1-11 siding and replace with original stucco. replace (e) 4 flider-style aluminum windows with new glider-style energy efficient windows of the same size and location.u=0.3 max | $55,000 |
| May 9, 2025 | Completed final sign-off Feb 2026 | 190 Saint Germain Av | demo 3rd floor deck and replace 3rd floor sliding doors with windows. remodel existing closet.Details
demo 3rd floor deck and replace 3rd floor sliding doors with windows. remodel existing closet. | $25,000 |
| Nov 21, 2024 | Completed final sign-off Dec 2024 | 1015 Florida St | 1st fl - (e) garage wall & door to be removed;add fire rated wall and 20 min doors. 2nd & 3rd. fl (e) non bearing portion of wall to be removed (2) existing property line window to be infill w/1 hr fire wallDetails
1st fl - (e) garage wall & door to be removed;add fire rated wall and 20 min doors. 2nd & 3rd. fl (e) non bearing portion of wall to be removed (2) existing property line window to be infill w/1 hr fire wall | $10,000 |
| Oct 30, 2024 | Completed final sign-off Feb 2025 | 108 Villa Tr | (replace 12 windows and 2 doors total) 9 windows on 3rd floor and 3 windows + 2 doors on 2nd floor with aluminum clad windows. 4 windows + 1 door at front, 2 windows on the eastside, 2 windows at rear and 3 windows + 1 door at westside.Details
(replace 12 windows and 2 doors total) 9 windows on 3rd floor and 3 windows + 2 doors on 2nd floor with aluminum clad windows. 4 windows + 1 door at front, 2 windows on the eastside, 2 windows at rear and 3 windows + 1 door at westside. | $100,000 |
| Oct 25, 2024 | In progress filed Oct 2024, not yet issued | 1015 Florida St | revision tp bpa# 2014-0610-7972. change layout on 1st floor and excluded (2) windows, excluded window and post at stairs on 2nd floor. excluded window and bathroom suite on 3rd floor, and changed sun tunnel to a skylight.Details
revision tp bpa# 2014-0610-7972. change layout on 1st floor and excluded (2) windows, excluded window and post at stairs on 2nd floor. excluded window and bathroom suite on 3rd floor, and changed sun tunnel to a skylight. | |
| Oct 25, 2024 | In progress issued Oct 2024 | 1015 Florida St | recommencement and completion of work approved under pa # 2014-0610-7972Details
recommencement and completion of work approved under pa # 2014-0610-7972 | $312,523 |
| Oct 6, 2023 | Completed final sign-off Feb 2024 | 190 Saint Germain Av | run new gas line from meter to fireplace in master bedroom. replace tiles on existing fireplace. open sheetrock in master bedroom ceiling to run gas line.Details
run new gas line from meter to fireplace in master bedroom. replace tiles on existing fireplace. open sheetrock in master bedroom ceiling to run gas line. | $20,000 |
| Jan 31, 2023 | Completed final sign-off Feb 2023 | 1306 Minna St | replace dry rotted wooden posts at rear deck, stair landing. like for like replacement.Details
replace dry rotted wooden posts at rear deck, stair landing. like for like replacement. | $3,000 |