J S B Construction
- Based in
- Montara
- On San Francisco permits
- Sep 2017 to Sep 2019
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2019 | Completed final sign-off Feb 2021 | 372 Marietta Dr | remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl.Details
remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl. | $64,193 |
| Sep 20, 2019 | Completed final sign-off Feb 2020 | 427 Molimo Dr | removal of stucco at entirety of southeast corner of house to repair rotted framing members extending 6'8" away from corner; restucco once repaired; in-kind replacement of stucco and (e) siding to remain. work is street facing.Details
removal of stucco at entirety of southeast corner of house to repair rotted framing members extending 6'8" away from corner; restucco once repaired; in-kind replacement of stucco and (e) siding to remain. work is street facing. | $5,000 |
| Jun 24, 2019 | Completed final sign-off Sep 2020 | 635 Miramar Av | remodel e full bath, convert linen closet area and portiion of laundry rm to new full bath.Details
remodel e full bath, convert linen closet area and portiion of laundry rm to new full bath. | $37,477 |
| Jun 3, 2019 | Completed final sign-off Feb 2020 | 4545 Lincoln Wy | 1st fl: convert portion of garage ot (n) entry/laundry. 2nd fl: remove wall btwn kitchen & dining rooml new cabinets btwn kitchen & dining (main kitchen to remain unchanged; widen opg. btwn living & dining room.Details
1st fl: convert portion of garage ot (n) entry/laundry. 2nd fl: remove wall btwn kitchen & dining rooml new cabinets btwn kitchen & dining (main kitchen to remain unchanged; widen opg. btwn living & dining room. | $28,000 |
| Jul 23, 2018 | Completed final sign-off Jan 2025 | 59 Carl St | work consists of demolishing bathroom to framing, leaving tub to be salvaged. new shower valve and fixtures. no plumbing fixtures to change location. recessed lighting, dedicated circuit and new finishes at all locations. no walls moved, removed, added or infilled. all existing layouts to remain.Details
work consists of demolishing bathroom to framing, leaving tub to be salvaged. new shower valve and fixtures. no plumbing fixtures to change location. recessed lighting, dedicated circuit and new finishes at all locations. no walls moved, removed, added or infilled. all existing layouts to remain. | $15,000 |
| Mar 19, 2018 | Completed final sign-off Sep 2018 | 1052 Cole St | remodel (e) kitchen & enlarge opening between kitchen & dining room; convert (e) half bath to send full bath; relocate laundry area to closet; reconfigure bedroom closetsDetails
remodel (e) kitchen & enlarge opening between kitchen & dining room; convert (e) half bath to send full bath; relocate laundry area to closet; reconfigure bedroom closets | $45,000 |
| Sep 29, 2017 | Completed final sign-off Jun 2019 | 151 Brompton Av | new bedroom, bath and family room at 1st fl, partial lightwell in fill at 2nd fl, new interior stairs, new 2nd and 1st fl decks at rear yard, new door and window opening in (e) rear facadeDetails
new bedroom, bath and family room at 1st fl, partial lightwell in fill at 2nd fl, new interior stairs, new 2nd and 1st fl decks at rear yard, new door and window opening in (e) rear facade | $77,848 |