J & L Construction Roofing
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Sep 2015
- Last 24 months
- 0 permits filed
101 permits since 2000: 81 completed, 17 never finaled, 3 expired or cancelled.
Of the 17 never-finaled permits, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 101.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2015 | Completed final sign-off Jun 2016 | 718 Faxon Av | 1st floor: add 2 bedrooms, 2 full baths, one office, and 1 family room. 2nd floor: remodel kitchen and bath, add one full bath.Details
1st floor: add 2 bedrooms, 2 full baths, one office, and 1 family room. 2nd floor: remodel kitchen and bath, add one full bath. | $120,000 |
| Jul 27, 2015 | Completed final sign-off Nov 2015 | 5225 Mission St | unit 203: remodel: replace kitchen fixtures, replace kitchen sink, replace bathroom fixtures, replace the toilet and water faucet, replace 4 windows fiberglass max u-factor 0.35.Details
unit 203: remodel: replace kitchen fixtures, replace kitchen sink, replace bathroom fixtures, replace the toilet and water faucet, replace 4 windows fiberglass max u-factor 0.35. | $9,000 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 270 Ewing Tr | reroofingDetails
reroofing | $10,500 |
| Nov 19, 2013 | Completed final sign-off Dec 2013 | 1970 Fell St | comply with complaint# 201336101 laying #3 rebar and forms to pour concrete on back yard of property, 2000 sq.ft., less than 50% of the yard extension and install appropriate drainage.Details
comply with complaint# 201336101 laying #3 rebar and forms to pour concrete on back yard of property, 2000 sq.ft., less than 50% of the yard extension and install appropriate drainage. | $12,000 |
| Nov 8, 2013 | Completed final sign-off Nov 2013 | 3222 Steiner St | reroofingDetails
reroofing | $9,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 1919 San Jose Av | reroofingDetails
reroofing | $5,800 |
| Oct 23, 2013 | Completed final sign-off Feb 2014 | 500 Burrows St | reroofingDetails
reroofing | $3,000 |
| Oct 23, 2013 | Completed final sign-off Dec 2013 | 160 07th St | reroofingDetails
reroofing | $12,800 |
| Oct 11, 2013 | Completed final sign-off Oct 2013 | 148 Niagara Av | reroofingDetails
reroofing | $5,700 |
| Sep 18, 2013 | Completed final sign-off Sep 2013 | 1219 15th Av | reroofingDetails
reroofing | $8,500 |
| Aug 30, 2013 | Completed final sign-off Sep 2013 | 5021 California St | reroofingDetails
reroofing | $10,000 |
| Aug 29, 2013 | Never finaled issued Aug 2013, no final | 2021 California St | reroofingDetails
reroofing | $10,000 |
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 1126 Howard St | corrective work to address nov#200717571. remove illegal mezzanine, low ht partitions. replace windows on howard st. new accessible toilet at g/f; and demolition of partitions at mezzanine.Details
corrective work to address nov#200717571. remove illegal mezzanine, low ht partitions. replace windows on howard st. new accessible toilet at g/f; and demolition of partitions at mezzanine. | $125,000 |
| Aug 7, 2013 | Completed final sign-off Aug 2013 | 3132 Cabrillo St | reroofingDetails
reroofing | $5,500 |
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 1126 Howard St | re-install on existing or re-open on existing 6 skylights, 6'x12' set on existing frame in kind skylights replacement.Details
re-install on existing or re-open on existing 6 skylights, 6'x12' set on existing frame in kind skylights replacement. | $4,200 |
| Jul 24, 2013 | Completed final sign-off Jul 2013 | 679 Moultrie St | reroofing - tear off (e) tar and gravel finishes. install #30 membrane base & 900 s.f. of #1 class gta bitumen on a flat roof (less than 2" in 12" slope)Details
reroofing - tear off (e) tar and gravel finishes. install #30 membrane base & 900 s.f. of #1 class gta bitumen on a flat roof (less than 2" in 12" slope) | $4,800 |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 1136 Howard St | re-open skylights. 6 skylights, 6'x12' and make new frame on it to set the skylights on this warehouse. no structural changes. in kind skylights replacement. max u factor is 0.77Details
re-open skylights. 6 skylights, 6'x12' and make new frame on it to set the skylights on this warehouse. no structural changes. in kind skylights replacement. max u factor is 0.77 | $4,200 |
| Jul 18, 2013 | Completed final sign-off Jul 2013 | 2500 Mcallister St | reroofingDetails
reroofing | $10,200 |
| Jul 16, 2013 | Completed final sign-off Sep 2013 | 2120 Clement St | reroofingDetails
reroofing | $16,000 |
| Jul 15, 2013 | Never finaled issued Jul 2013, no final | 70 Richland Av | to comply with nov#201306131 - repair floor finishes of front stair; repair dry rot at rear stair (<50%) and provide handrails throughout; repair broken glazing in 2 windows at rear of house.Details
to comply with nov#201306131 - repair floor finishes of front stair; repair dry rot at rear stair (<50%) and provide handrails throughout; repair broken glazing in 2 windows at rear of house. | $750 |
| Jul 1, 2013 | Completed final sign-off Jul 2013 | 515 20th Av | reroofingDetails
reroofing | $4,600 |
| Jun 27, 2013 | Completed final sign-off Jul 2013 | 119 Maynard St | reroofingDetails
reroofing | $6,800 |
| Jun 25, 2013 | Completed final sign-off Jul 2013 | 1033 Jones St | reroofingDetails
reroofing | $6,800 |
| Jun 21, 2013 | Completed final sign-off Jun 2013 | 245 Santa Rosa Av | reroofingDetails
reroofing | $4,900 |
| May 29, 2013 | Completed final sign-off Jul 2013 | 462 27th St | window replacement. replace one 8'x2' vinyl window by two 4'x3-1/2" vinyl windows at back of the building.Details
window replacement. replace one 8'x2' vinyl window by two 4'x3-1/2" vinyl windows at back of the building. | $1,600 |
| Apr 22, 2013 | Completed final sign-off Apr 2013 | 45 Prospect Av | reroofingDetails
reroofing | $8,000 |
| Apr 17, 2013 | Completed final sign-off Apr 2013 | 53 Albion St | reroofingDetails
reroofing | $3,700 |
| Mar 19, 2013 | Completed final sign-off Mar 2013 | 630 Paris St | reroofingDetails
reroofing | $4,500 |
| Feb 19, 2013 | Completed final sign-off Feb 2013 | 4044 Folsom St | reroofingDetails
reroofing | $3,600 |
| Feb 6, 2013 | Completed final sign-off Feb 2014 | 631 O'farrell St | revision app # 201209270749, 2 bathrooms remodeling new plumbing and electricity, replace sink& bathtub for unit 1606 only no walls doors windows or floors under this permit .Details
revision app # 201209270749, 2 bathrooms remodeling new plumbing and electricity, replace sink& bathtub for unit 1606 only no walls doors windows or floors under this permit . | |
| Jan 16, 2013 | Completed final sign-off Apr 2013 | 1970 Fell St | new hvac in unit #8Details
new hvac in unit #8 | $3,500 |
| Dec 20, 2012 | Completed final sign-off Sep 2013 | 535 Mangels Av | reroofingDetails
reroofing | $4,000 |
| Dec 18, 2012 | Never finaled issued Dec 2012, no final | 2590 Pine St | reroofingDetails
reroofing | $6,800 |
| Dec 14, 2012 | Completed final sign-off Jan 2013 | 20 Canyon Dr | reroofingDetails
reroofing | $3,100 |
| Dec 14, 2012 | Completed final sign-off Sep 2013 | 692 Hayes St | kitchen & bathroom remodeling, fix plumbing & electrical to code. lighting will comply with title 24Details
kitchen & bathroom remodeling, fix plumbing & electrical to code. lighting will comply with title 24 | $25,000 |
| Dec 6, 2012 | Completed final sign-off Jan 2013 | 309 Montcalm St | reroofingDetails
reroofing | $4,200 |
| Nov 9, 2012 | Completed final sign-off Nov 2012 | 3659 18th St | reroofingDetails
reroofing | $8,600 |
| Nov 9, 2012 | Completed final sign-off Nov 2012 | 3574 17th St | reroofingDetails
reroofing | $10,800 |
| Nov 5, 2012 | Completed final sign-off Nov 2012 | 523 Campbell Av | reroofingDetails
reroofing | $8,000 |
| Oct 23, 2012 | Never finaled issued Oct 2012, no final | 2867 22nd St | replace 1000 sq.ft. of wood siding for hardi backer tipe, i nstall plywood and insulation if required on rear of building, install 12 windows in front of bldg. replace 12 wood windows for fiberglass windows, single hung windows, u value=0.40. max.Details
replace 1000 sq.ft. of wood siding for hardi backer tipe, i nstall plywood and insulation if required on rear of building, install 12 windows in front of bldg. replace 12 wood windows for fiberglass windows, single hung windows, u value=0.40. max. | $28,000 |
| Oct 18, 2012 | Completed final sign-off Oct 2012 | 167 Goettingen St | reroofingDetails
reroofing | $6,000 |
| Sep 20, 2012 | Completed final sign-off Oct 2012 | 391 Valencia St | reroofingDetails
reroofing | $28,000 |
| Sep 13, 2012 | Completed final sign-off Oct 2012 | 546 46th Av | re-roof tear of old roof install #30 fiberglass paper base, install 1800 sq ft of high definishion composition shingles 30 yr roof is 5' in 12" pichDetails
re-roof tear of old roof install #30 fiberglass paper base, install 1800 sq ft of high definishion composition shingles 30 yr roof is 5' in 12" pich | $1,800 |
| Sep 6, 2012 | Completed final sign-off Sep 2012 | 955 Goettingen St | reroofingDetails
reroofing | $3,800 |
| Aug 23, 2012 | Completed final sign-off Aug 2013 | 692 Hayes St | complete remodel of 1 bathroom and 1 kitchen.Details
complete remodel of 1 bathroom and 1 kitchen. | $30,000 |
| Aug 13, 2012 | Completed final sign-off Mar 2013 | 45 Prosper St | comply with nov 201230262 under application 201206061953 and 201205231074 for payment of fines and remove wall & finishes in bathroom, install tile board and ceramic tileDetails
comply with nov 201230262 under application 201206061953 and 201205231074 for payment of fines and remove wall & finishes in bathroom, install tile board and ceramic tile | |
| Jun 11, 2012 | Completed final sign-off Mar 2013 | 3829 Mission St | repair/replace damaged front facade on ground floor per plan.Details
repair/replace damaged front facade on ground floor per plan. | $20,000 |
| Jun 6, 2012 | Completed final sign-off Jul 2012 | 667 Ellsworth St | replace (2) 2'x2' windows, one on each bathroom. replace approx 100f of hardy backer siding.Details
replace (2) 2'x2' windows, one on each bathroom. replace approx 100f of hardy backer siding. | $1,500 |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 45 Prosper St | replace 6 room windows, replace approx 80f of ceramic tile on the bathroom. rear window only.Details
replace 6 room windows, replace approx 80f of ceramic tile on the bathroom. rear window only. | $1,500 |
| May 23, 2012 | Never finaled issued May 2012, no final | 45 Prosper St | reroofingDetails
reroofing | $1,200 |
| May 16, 2012 | Completed final sign-off May 2012 | 1434 Clement St | reroofingDetails
reroofing | $4,600 |
| May 16, 2012 | Completed final sign-off May 2012 | 1960 Union St | reroofingDetails
reroofing | $6,800 |
| May 4, 2012 | Completed final sign-off May 2012 | 214 Fair Oaks St | reroofingDetails
reroofing | $5,400 |
| May 4, 2012 | Completed final sign-off Jun 2012 | 2285 Mission St | reroofingDetails
reroofing | $9,500 |
| Apr 24, 2012 | Completed final sign-off May 2012 | 3972 Folsom St | reroofingDetails
reroofing | $5,400 |
| Apr 20, 2012 | Completed final sign-off Apr 2012 | 325 Peninsula Av | reroofingDetails
reroofing | $3,800 |
| Apr 17, 2012 | Completed final sign-off Apr 2012 | 334 Peninsula Av | reroofingDetails
reroofing | $4,600 |
| Apr 17, 2012 | Completed final sign-off Apr 2012 | 73 Maynard St | reroofingDetails
reroofing | $4,300 |
| Mar 27, 2012 | Completed final sign-off Aug 2012 | 462 27th St | unit #3 - remodel kitchen & bathroom, replace countertop, cabinets, floor, bathtub, sink & tile.Details
unit #3 - remodel kitchen & bathroom, replace countertop, cabinets, floor, bathtub, sink & tile. | $10,000 |
| Feb 15, 2012 | Completed final sign-off May 2012 | 5225 Mission St | replace 23 windows on the back of building in kind, replace the outside siding in new plywood under and insulation, max u factor .40Details
replace 23 windows on the back of building in kind, replace the outside siding in new plywood under and insulation, max u factor .40 | $32,000 |
| Jan 23, 2012 | Completed final sign-off Aug 2012 | 462 27th St | unit #6: bathroom remodel 5'x7'; no wall relocationDetails
unit #6: bathroom remodel 5'x7'; no wall relocation | $6,000 |
| Jan 23, 2012 | Completed final sign-off Feb 2012 | 476 Eureka St | bathroom remodel (all (n) lighting must comply with cec 150(k) 10Details
bathroom remodel (all (n) lighting must comply with cec 150(k) 10 | $5,000 |
| Jan 18, 2012 | Completed final sign-off Jun 2012 | 5225 Mission St | kitchen remodel, replace the kitchen cabinets, counter top and floor tile and replace the tile in bathroom or electricity involve property, strap water heater and for kitchen sink. provide co always per cbc-2010 section 420.6Details
kitchen remodel, replace the kitchen cabinets, counter top and floor tile and replace the tile in bathroom or electricity involve property, strap water heater and for kitchen sink. provide co always per cbc-2010 section 420.6 | $6,000 |
| Nov 1, 2011 | Completed final sign-off Nov 2011 | 235 Granville Wy | reroofingDetails
reroofing | $5,200 |
| Oct 27, 2011 | Completed final sign-off Nov 2011 | 82 Caine Av | reroofingDetails
reroofing | $3,800 |
| Oct 26, 2011 | Never finaled issued Oct 2011, no final | 646 Edinburgh St | remove kitchen units on 1st floor & cut all supplies to source.Details
remove kitchen units on 1st floor & cut all supplies to source. | $100 |
| Oct 19, 2011 | Completed final sign-off Aug 2012 | 462 27th St | unt #2 & unit #5: remodel (2) bathrooms: replace the bath tub, replace the toilet and the vanity sink. provide high efficacy lights or "manual on" occupancy sensor.Details
unt #2 & unit #5: remodel (2) bathrooms: replace the bath tub, replace the toilet and the vanity sink. provide high efficacy lights or "manual on" occupancy sensor. | $5,390 |
| Sep 29, 2011 | Completed final sign-off Oct 2011 | 444 Lawton St | reroofingDetails
reroofing | $3,800 |
| Sep 20, 2011 | Completed final sign-off Nov 2011 | 2843 Webster St | repair roof framing @ carport, and repair slab at carport per plan.Details
repair roof framing @ carport, and repair slab at carport per plan. | $8,000 |
| Sep 19, 2011 | Completed final sign-off Sep 2011 | 244 09th St | reroofingDetails
reroofing | $4,800 |
| Sep 7, 2011 | Never finaled issued Sep 2011, no final | 2843 Webster St | reroofingDetails
reroofing | $8,500 |
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 2843 Webster St | remove old roofing & sheathing on the garage bldg on backside od property. install new plywood 1/2" cdx, nailed with 10d @ 6" oc at edges, 12" oc at field. new roofing installed on separate permit.Details
remove old roofing & sheathing on the garage bldg on backside od property. install new plywood 1/2" cdx, nailed with 10d @ 6" oc at edges, 12" oc at field. new roofing installed on separate permit. | $4,000 |
| Jun 20, 2011 | Completed final sign-off Jul 2011 | 2971 Lake St | reroofingDetails
reroofing | $12,000 |
| Jun 7, 2011 | Completed final sign-off Jun 2011 | 126 San Carlos St | reroofingDetails
reroofing | $7,500 |
| Apr 25, 2011 | Expired or cancelled cancelled Jul 2011 | 1500 Wallace Av | change of use. interior improvements for new restaurant. install walls, doors, kitchen, equipment, electrical, plumbing and hvac.Details
change of use. interior improvements for new restaurant. install walls, doors, kitchen, equipment, electrical, plumbing and hvac. | $90,000 |
| Apr 14, 2011 | Completed final sign-off Apr 2011 | 2036 14th Av | reroofingDetails
reroofing | $3,800 |
| Apr 14, 2011 | Completed final sign-off Apr 2011 | 3436 19th St | reroofingDetails
reroofing | $6,800 |
| Mar 23, 2011 | Completed final sign-off Apr 2011 | 2525 Steiner St | reroofingDetails
reroofing | $4,500 |
| Mar 18, 2011 | Never finaled issued Mar 2011, no final | 2525 Steiner St | installation of new windows at 3rd floor. installation of 2 skylights at roof.Details
installation of new windows at 3rd floor. installation of 2 skylights at roof. | $8,000 |
| Feb 17, 2011 | Completed final sign-off Feb 2011 | 33 Ramona Av | reroofingDetails
reroofing | $4,800 |
| Dec 13, 2010 | Never finaled issued Dec 2010, no final | 2080 Great Hy | reroofingDetails
reroofing | $3,100 |
| Dec 13, 2010 | Completed final sign-off Dec 2010 | 1454 17th Av | reroofingDetails
reroofing | $4,200 |
| Nov 29, 2010 | Completed final sign-off Dec 2010 | 231 Upper Tr | reroofingDetails
reroofing | $4,200 |
| Nov 4, 2010 | Completed final sign-off Nov 2010 | 2940 22nd Av | reroofingDetails
reroofing | $3,200 |
| Oct 18, 2010 | Never finaled issued Oct 2010, no final | 843 Howard St | reroofingDetails
reroofing | $7,000 |
| Aug 12, 2010 | Completed final sign-off Oct 2010 | 2154 48th Av | remove dry-rot on side of home & replace with (n) siding (to match existing). work to be done in front of home.Details
remove dry-rot on side of home & replace with (n) siding (to match existing). work to be done in front of home. | $2,100 |
| May 20, 2010 | Completed final sign-off Feb 2014 | 1500 Wallace Av | fire rebuild walls, roof, electrical, plumbing, restrooms, foundation. f-1 occupancy for machine shops.Details
fire rebuild walls, roof, electrical, plumbing, restrooms, foundation. f-1 occupancy for machine shops. | $302,000 |
| May 3, 2010 | Completed final sign-off Aug 2010 | 236 Santos St | construct rear deck with stairs @ rear of (e) bldg. to add two bedrm. one full bathrm. & laundry rm. on (e) ground flr. per plan.Details
construct rear deck with stairs @ rear of (e) bldg. to add two bedrm. one full bathrm. & laundry rm. on (e) ground flr. per plan. | $40,000 |
| Oct 28, 2009 | Completed final sign-off Nov 2009 | 36 Flora St | reroofingDetails
reroofing | $7,000 |
| Oct 21, 2009 | Completed final sign-off Nov 2009 | 60 Navajo Av | reroofingDetails
reroofing | $4,000 |
| Oct 19, 2009 | Completed final sign-off Nov 2009 | 20 Upper Tr | reroofingDetails
reroofing | $4,000 |
| Oct 6, 2009 | Completed final sign-off Jan 2010 | 1628 Kirkwood Av | reroofing.Details
reroofing. | $7,000 |
| Oct 2, 2009 | Completed final sign-off Oct 2009 | 881 Capp St | reroofingDetails
reroofing | $7,000 |
| Sep 15, 2009 | Completed final sign-off Oct 2009 | 3267 Mission St | reroofingDetails
reroofing | $5,000 |
| Sep 10, 2009 | Expired or cancelled cancelled Nov 2009 | 3367 Mission St | reroofingDetails
reroofing | $5,000 |
| Sep 1, 2009 | Never finaled issued Sep 2009, no final | 187 Tucker Av | reroofing.Details
reroofing. | $3,000 |
| Jul 14, 2009 | Completed final sign-off Jul 2009 | 135 03rd Av | reroofingDetails
reroofing | $3,000 |
| Jul 13, 2009 | Expired or cancelled cancelled Nov 2009 | 137 03rd Av | re-roofing (6 squares - 600 square feet) 30 years shinglesDetails
re-roofing (6 squares - 600 square feet) 30 years shingles | $3,000 |
| Jul 2, 2009 | Completed final sign-off Jul 2009 | 643 Lisbon St | reroofingDetails
reroofing | $5,000 |
| Jun 16, 2009 | Completed final sign-off Jul 2009 | 68 Pasadena St | replace kitchen cabinets, replace granite stone, replace 3 old plugs for gif plugs, no wiring or plumning work, paint bathroom & kitchen.Details
replace kitchen cabinets, replace granite stone, replace 3 old plugs for gif plugs, no wiring or plumning work, paint bathroom & kitchen. | $3,000 |