J Farley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2022 to Sep 2026
- Last 24 months
- 13 permits filed
19 permits since 2000: 13 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Oct 2026 | 1754 Fell St | new garage door and improve access to storage and associate structural work.Details
new garage door and improve access to storage and associate structural work. | $2,500 |
| Sep 10, 2026 | In progress issued Sep 2026 | 33 Retiro Wy | remove existing wall on the second floor including the existing front door. build a new wall where the front door will be located.Details
remove existing wall on the second floor including the existing front door. build a new wall where the front door will be located. | $25,000 |
| Apr 17, 2026 | Completed final sign-off Aug 2026 | 10 Coventry Ct | side stairs replacement, remove & replace stairs in bluestone treads and galvanized steel supporting structure w/ steel railing.Details
side stairs replacement, remove & replace stairs in bluestone treads and galvanized steel supporting structure w/ steel railing. | $5,000 |
| Feb 20, 2026 | Completed final sign-off Jun 2026 | 1990 Green St | unit 205: replace kitchen cabinets, keeping layout. remodel bathroom, convert tub to shower. no removal of wallsDetails
unit 205: replace kitchen cabinets, keeping layout. remodel bathroom, convert tub to shower. no removal of walls | $50,000 |
| Oct 17, 2025 | Completed final sign-off Oct 2026 | 254 Avila St | demolish concrete slab at 1st fl (but garage slab to remain) construct new 1 story sunroom addition to rear of e sf residence. interior remodeling including renovations to provide 1 more bath.Details
demolish concrete slab at 1st fl (but garage slab to remain) construct new 1 story sunroom addition to rear of e sf residence. interior remodeling including renovations to provide 1 more bath. | $70,000 |
| Sep 22, 2025 | Completed final sign-off Dec 2025 | 711 Kansas St | add new bathroom, remodel existing bathroom, remodel kitchen, upgrade electrical. (n) door in garageDetails
add new bathroom, remodel existing bathroom, remodel kitchen, upgrade electrical. (n) door in garage | $65,000 |
| Sep 16, 2025 | In progress issued Sep 2025 | 711 Kansas St | floor protection and exploration demolition in kitchen and bathroomDetails
floor protection and exploration demolition in kitchen and bathroom | $2,500 |
| Sep 3, 2025 | In progress issued Jan 2026 | 33 Retiro Wy | revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door.Details
revision to 202505227067. field documentation of structural work per inspector request. 2nd fl bathroom door changed to pocket door. | |
| May 22, 2025 | In progress issued Jun 2025 | 33 Retiro Wy | addition of 49 sqft with the infill of interior lightwell at second fl. remodel kitchen and bathroom. two new skylights at kitchen. no change to exterior.Details
addition of 49 sqft with the infill of interior lightwell at second fl. remodel kitchen and bathroom. two new skylights at kitchen. no change to exterior. | $125,000 |
| Jan 2, 2025 | Completed final sign-off Jul 2025 | 464 Los Palmos Dr | interior remodel of sfd provide lighting for 2nd and 3rd floors kitchen remodel new windows at kitchen not visible provide new skylight at kitchen replace (e) windows at dining with french doors not visible from street replace rim blocks with psl rim joist at 3rd floor overhangDetails
interior remodel of sfd provide lighting for 2nd and 3rd floors kitchen remodel new windows at kitchen not visible provide new skylight at kitchen replace (e) windows at dining with french doors not visible from street replace rim blocks with psl rim joist at 3rd floor overhang | $20,000 |
| Nov 27, 2024 | In progress filed Nov 2024, not yet issued | 333 Main St | remove tub and create a shower enclosure (in-kind)Details
remove tub and create a shower enclosure (in-kind) | $3,000 |
| Oct 21, 2024 | Completed final sign-off Jul 2025 | 464 Los Palmos Dr | provide new bathroom on 3rd flr. no work on second and ground flr. provide 32in by 32 in skylights located in bathroomDetails
provide new bathroom on 3rd flr. no work on second and ground flr. provide 32in by 32 in skylights located in bathroom | $20,000 |
| Oct 7, 2024 | Completed final sign-off Mar 2025 | 382 Liberty St | replace (e) windows in front elevation at 1st floor, the same size, the same location.Details
replace (e) windows in front elevation at 1st floor, the same size, the same location. | $9,500 |
| Apr 8, 2024 | Completed final sign-off Jun 2024 | 2920 Sacramento St | front bldg structural repair of existing roof deck over front garage structure for exploratory demo; upgrade guardrail connection to roof system; reconstruct deck system over exisint structural joists. replace steel guardrail w/glass; install 1-hr rated parapet @ east sideDetails
front bldg structural repair of existing roof deck over front garage structure for exploratory demo; upgrade guardrail connection to roof system; reconstruct deck system over exisint structural joists. replace steel guardrail w/glass; install 1-hr rated parapet @ east side | $42,000 |
| Feb 1, 2024 | Completed final sign-off Jun 2024 | 2920 Sacramento St | demo sections of the tile deck to determine how to repair and re-tile deck correctly. cover leaking areas with plastics, tile & water proofing only approx 400 sq ftDetails
demo sections of the tile deck to determine how to repair and re-tile deck correctly. cover leaking areas with plastics, tile & water proofing only approx 400 sq ft | $20,000 |
| Jan 2, 2024 | Completed final sign-off Mar 2024 | 1990 Green St | unit 205: remove and replace tile, replace shower valve, replace existing fan with light switch. paint.Details
unit 205: remove and replace tile, replace shower valve, replace existing fan with light switch. paint. | $11,000 |
| Nov 3, 2023 | Completed final sign-off Oct 2024 | 254 Avila St | remodel bathroom & vanity.Details
remodel bathroom & vanity. | $55,000 |
| Sep 1, 2023 | Completed final sign-off Dec 2024 | 2595 14th Av | remodel kitchen, new countertop, backsplash, new appliances. repair cabinets to fit new microwave and oven.Details
remodel kitchen, new countertop, backsplash, new appliances. repair cabinets to fit new microwave and oven. | $10,000 |
| Apr 6, 2022 | Completed final sign-off Dec 2024 | 384 Liberty St | repair & seismically strengthen (e) rear decks. seismically strengthen rear portion of building by adding a new moment frame.Details
repair & seismically strengthen (e) rear decks. seismically strengthen rear portion of building by adding a new moment frame. | $200,000 |