J C Tan Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2001 to Nov 2022
- Last 24 months
- 0 permits filed
54 permits since 2000: 37 completed, 12 never finaled, 5 expired or cancelled.
Of the 12 never-finaled permits, 4 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2022 | Completed final sign-off May 2024 | 83 Arbor St | construct (n) cantilevered balcony at rear of building 2/f. construct (n) deck w/ staircase at rear of building at basement (size approx. 22'x8'x6').Details
construct (n) cantilevered balcony at rear of building 2/f. construct (n) deck w/ staircase at rear of building at basement (size approx. 22'x8'x6'). | $28,000 |
| Oct 11, 2022 | Completed final sign-off May 2024 | 83 Arbor St | convert (e) bedroom, study room into 1 bedroom, relocate (e) bathroom at g/f. remodel (e) kitchen, bathroom & replace (e) sheet rock with new at 2/f. construct 1 bedroom, family room with wet bar and 1 full bathroom at basement.Details
convert (e) bedroom, study room into 1 bedroom, relocate (e) bathroom at g/f. remodel (e) kitchen, bathroom & replace (e) sheet rock with new at 2/f. construct 1 bedroom, family room with wet bar and 1 full bathroom at basement. | $200,000 |
| Oct 28, 2019 | Completed final sign-off Jun 2020 | 76 Exeter St | inkind repair of wood siding with dry rot on front building facade. no other work.Details
inkind repair of wood siding with dry rot on front building facade. no other work. | $850 |
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 720 Baker St | unit #a: replace bathtub, plumbing fixtures, paint, flooring. no change on walls.Details
unit #a: replace bathtub, plumbing fixtures, paint, flooring. no change on walls. | $12,000 |
| Jul 12, 2019 | Completed final sign-off Oct 2019 | 840 California St | unit #37 - convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install w/dDetails
unit #37 - convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install w/d | $37,000 |
| Feb 20, 2019 | Completed final sign-off Jun 2019 | 520 Scott St | unit 3: rehabilitate e kitchen, rehabilitate e bath, install washer and dryerDetails
unit 3: rehabilitate e kitchen, rehabilitate e bath, install washer and dryer | $33,000 |
| Dec 17, 2018 | Completed final sign-off May 2019 | 520 Scott St | unit #12; rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryerDetails
unit #12; rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer | $30,000 |
| Dec 17, 2018 | Completed final sign-off May 2019 | 520 Scott St | unit #2; rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryerDetails
unit #2; rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer | $25,000 |
| Oct 9, 2018 | Completed final sign-off Dec 2018 | 2115 Hyde St | revision to 201806040860 revise 3rd flr and 2nd flr framining plan, work on unit # 2123Details
revision to 201806040860 revise 3rd flr and 2nd flr framining plan, work on unit # 2123 | |
| Oct 1, 2018 | Completed final sign-off Feb 2019 | 1870 Pacific Av | unit #302: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryerDetails
unit #302: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryer | $30,000 |
| Oct 1, 2018 | Completed final sign-off Apr 2019 | 1870 Pacific Av | unit #704: convert e dining and kitchen to bedroom. relocate kitchen, rehabilitate e bath, install washer/dryerDetails
unit #704: convert e dining and kitchen to bedroom. relocate kitchen, rehabilitate e bath, install washer/dryer | $37,000 |
| Aug 22, 2018 | Completed final sign-off Feb 2019 | 676 Geary St | unit 407 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer/dryer. n/a for maher.Details
unit 407 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer/dryer. n/a for maher. | $38,000 |
| Aug 9, 2018 | Completed final sign-off Feb 2019 | 755 Ofarrell St | unit #7: 1)rehabilitate extg kitchen and extg bathroom. install washer and dryer. all work is non-structural only. n/a for maher.Details
unit #7: 1)rehabilitate extg kitchen and extg bathroom. install washer and dryer. all work is non-structural only. n/a for maher. | $35,000 |
| Jul 30, 2018 | Completed final sign-off Dec 2019 | 920 Leavenworth St | #306: revision to pa# 201805169305. additional work in living room & bedroom. new dry wall on walls & ceiling.Details
#306: revision to pa# 201805169305. additional work in living room & bedroom. new dry wall on walls & ceiling. | $15,000 |
| May 16, 2018 | Completed final sign-off Aug 2018 | 920 Leavenworth St | unit 306 -replace kitchen cabinets, plumbing fixtures in bathroom, flooring & paint. unit 301 -to comply w/ nov 201862011 item 4.Details
unit 306 -replace kitchen cabinets, plumbing fixtures in bathroom, flooring & paint. unit 301 -to comply w/ nov 201862011 item 4. | $18,000 |
| May 4, 2018 | Completed final sign-off Mar 2019 | 52 Teddy Av | recommencement and completion of work approved under pa# 201003178413 & 201010223586Details
recommencement and completion of work approved under pa# 201003178413 & 201010223586 | $15,000 |
| Mar 14, 2018 | Never finaled issued Mar 2018, no final | 140 Duboce Av | unit # 302: replace existing kitchen cabinets, replace (e) plumbing fixtures, new sub-panel. no walls moved, removed, added or installed. all (e) layout to remain unchanged.Details
unit # 302: replace existing kitchen cabinets, replace (e) plumbing fixtures, new sub-panel. no walls moved, removed, added or installed. all (e) layout to remain unchanged. | $30,000 |
| Nov 30, 2017 | Completed final sign-off Apr 2018 | 676 Geary St | #205: remodel existing kitchen and bathroom. washer & dryer hook up (ventless electrical), in same location. no moving of walls, windows or doors.Details
#205: remodel existing kitchen and bathroom. washer & dryer hook up (ventless electrical), in same location. no moving of walls, windows or doors. | $25,000 |
| Oct 27, 2017 | Completed final sign-off Feb 2018 | 676 Geary St | remodel (e) kitchen & bathroom fixtures, bathtub stay. (all works in unit 304) no work in guest room. n/a for maher.Details
remodel (e) kitchen & bathroom fixtures, bathtub stay. (all works in unit 304) no work in guest room. n/a for maher. | $22,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2018 | 1801 Gough St | unit 507 - convert existing kitchen to storage; relocate kitchen; convert existing dining room to bedroom; rehabilitate existing bathroom; install 2nd bathroom; install washer/dryerDetails
unit 507 - convert existing kitchen to storage; relocate kitchen; convert existing dining room to bedroom; rehabilitate existing bathroom; install 2nd bathroom; install washer/dryer | $48,000 |
| Aug 30, 2017 | Never finaled issued Aug 2017, no final | 1658 Sacramento St | unit 12: rev to pa#201707071202: amend permit for address correction from 1656 sacramento st to 1658 sacramento st.Details
unit 12: rev to pa#201707071202: amend permit for address correction from 1656 sacramento st to 1658 sacramento st. | |
| Aug 15, 2017 | Completed final sign-off Dec 2017 | 1240 Bush St | unit #12: rehabilitate (e) kitchen & bathroom. install washer & dryer. maher naDetails
unit #12: rehabilitate (e) kitchen & bathroom. install washer & dryer. maher na | $28,000 |
| Aug 2, 2017 | Completed final sign-off Oct 2017 | 516 Ellis St | unit 306: new kitchen cabinet, floor tiles, hardwood floor, new shower wall tiles, toilet, paint unit kitchen and bathDetails
unit 306: new kitchen cabinet, floor tiles, hardwood floor, new shower wall tiles, toilet, paint unit kitchen and bath | $15,000 |
| Jul 21, 2017 | Completed final sign-off Dec 2017 | 2730 Sacramento St | #10: rehabilitate existing kitchen, bath, install 2nd bath, install washer dryerDetails
#10: rehabilitate existing kitchen, bath, install 2nd bath, install washer dryer | $42,000 |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 1656 Sacramento St | unit 12 - convert (e) kitchen to study, relocate (e) kitchen, rehabilitate (e) bathroomDetails
unit 12 - convert (e) kitchen to study, relocate (e) kitchen, rehabilitate (e) bathroom | $36,000 |
| May 17, 2017 | Expired or cancelled cancelled Oct 2024 | 601 Ofarrell St | unit 606 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom, install wsher & dryer. n/a ordinance #155-13Details
unit 606 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom, install wsher & dryer. n/a ordinance #155-13 | $33,000 |
| Mar 10, 2017 | Completed final sign-off Jun 2017 | 2730 Sacramento St | unit #1: rehabilitation (e) kitchen & bathroom. install 2nd bathroom. install w/d maher naDetails
unit #1: rehabilitation (e) kitchen & bathroom. install 2nd bathroom. install w/d maher na | $45,000 |
| Dec 14, 2016 | Completed final sign-off Jun 2017 | 2730 Sacramento St | remodel unit 12 on the 4th fl. remodel existing kitchen, remodel exist bath, add 2nd bath, add washer dryer maher not reqDetails
remodel unit 12 on the 4th fl. remodel existing kitchen, remodel exist bath, add 2nd bath, add washer dryer maher not req | $42,000 |
| Dec 1, 2016 | Completed final sign-off Apr 2017 | 1060 Pine St | unit #4: remodel (e) kitchen & bathroom. add w/d maher naDetails
unit #4: remodel (e) kitchen & bathroom. add w/d maher na | $30,000 |
| Nov 16, 2016 | Completed final sign-off Apr 2017 | 1060 Pine St | unit #9 at the 3rd fl remodel - remodel (e) kitchen, bathroom. add washer and dryerDetails
unit #9 at the 3rd fl remodel - remodel (e) kitchen, bathroom. add washer and dryer | $27,000 |
| Nov 9, 2016 | Completed final sign-off Mar 2017 | 655 Stockton St | unit #310, 4th floor - remodel existing kitchen, remodel existing bathroom, add 2nd closet, add washer & dryer. n/a maher ordinanceDetails
unit #310, 4th floor - remodel existing kitchen, remodel existing bathroom, add 2nd closet, add washer & dryer. n/a maher ordinance | $30,000 |
| Sep 22, 2016 | Completed final sign-off Apr 2017 | 1660 Bay St | 3/f #204- remodel existing kitchen, convert existing dining to bedroom, add washer & dryer. n/a ordinance #155-13Details
3/f #204- remodel existing kitchen, convert existing dining to bedroom, add washer & dryer. n/a ordinance #155-13 | $25,000 |
| Sep 15, 2016 | Completed final sign-off Feb 2017 | 655 Stockton St | remodel unit #206 at the third floor. remodel extg bathroom, remodel extg kitchen and add washer and dryerl. n/a for maher.Details
remodel unit #206 at the third floor. remodel extg bathroom, remodel extg kitchen and add washer and dryerl. n/a for maher. | $25,000 |
| Aug 19, 2016 | Completed final sign-off Dec 2016 | 2730 Sacramento St | unit 4, 2nd floor - remodel (e) bathroom and kitchen. add bathroom and washer and dryer. n/a ordinance #155-13Details
unit 4, 2nd floor - remodel (e) bathroom and kitchen. add bathroom and washer and dryer. n/a ordinance #155-13 | $40,000 |
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 3023 Fillmore St | residential: remodel (e) 2 bathrooms, new tiles on wall & floor, new sink. no change in wall and opening layout. lighting to be h.e. or controlled by manual-on sensor with h.e. main light.Details
residential: remodel (e) 2 bathrooms, new tiles on wall & floor, new sink. no change in wall and opening layout. lighting to be h.e. or controlled by manual-on sensor with h.e. main light. | $8,000 |
| Apr 15, 2016 | Never finaled issued Apr 2016, no final | 3025 Fillmore St | replace existing kitchen cabinet, sink, flooring - same location. no wall removal, alteration or relocations. no lighting changes.Details
replace existing kitchen cabinet, sink, flooring - same location. no wall removal, alteration or relocations. no lighting changes. | $16,000 |
| Dec 11, 2015 | Completed final sign-off Oct 2021 | 1465 Revere Av | legalize existing kitchen on ground floor to and add one residential unitDetails
legalize existing kitchen on ground floor to and add one residential unit | $8,000 |
| Nov 20, 2015 | Expired or cancelled expired Nov 2021 | 947 Innes Av | (per ordinance 146-15) legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. legalize (e) garage to living space per plan. comply with nov #201569124, #201569691, #201567914Details
(per ordinance 146-15) legalize (e) kitchen to add (1)(n) residential unit under unit legalization program. legalize (e) garage to living space per plan. comply with nov #201569124, #201569691, #201567914 | $8,000 |
| Oct 28, 2015 | Never finaled issued Oct 2015, no final | 1570 Washington St | remodel (e) kitchen and bathroom. new wood flooring, replace 1 (e) window. electrical outlet. new kitchen sink, counter top, cabinets, bath sink, toilet. to comply with complaint #201573073.Details
remodel (e) kitchen and bathroom. new wood flooring, replace 1 (e) window. electrical outlet. new kitchen sink, counter top, cabinets, bath sink, toilet. to comply with complaint #201573073. | $1,800 |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 1572 Washington St | new kitchen cabinet, counter top, sink; remodel (e) bathroom with new bath fixture excluding tub, new full bath & new flooring entire top unit. no walls moved, removed, added, or infilled. all (e) layouts to remain unchanged.Details
new kitchen cabinet, counter top, sink; remodel (e) bathroom with new bath fixture excluding tub, new full bath & new flooring entire top unit. no walls moved, removed, added, or infilled. all (e) layouts to remain unchanged. | $25,000 |
| Aug 31, 2015 | Never finaled issued Aug 2015, no final | 4318 Geary Bl | street spaceDetails
street space | |
| Aug 20, 2015 | Completed final sign-off Aug 2015 | 2641 Mission St | replace existing wooden ladder with metal same configuration as per request by housing inspector ms. barbara lopez. to comply with nov 201538974, item #3Details
replace existing wooden ladder with metal same configuration as per request by housing inspector ms. barbara lopez. to comply with nov 201538974, item #3 | $400 |
| Apr 15, 2015 | Never finaled issued Apr 2015, no final | 2641 Mission St | #1- new kitchen cabinet, new sink and countertop, new flooring. paint entire unit. no structural to comply with nov#201538974Details
#1- new kitchen cabinet, new sink and countertop, new flooring. paint entire unit. no structural to comply with nov#201538974 | $4,500 |
| Feb 10, 2015 | Completed final sign-off Feb 2015 | 2641 Mission St | unit 4: replace broken window with same kind; to comply with his nov 201519351 dated 1/22/2015, items 2, 3, 4 - door latch & deadboltDetails
unit 4: replace broken window with same kind; to comply with his nov 201519351 dated 1/22/2015, items 2, 3, 4 - door latch & deadbolt | $400 |
| Mar 28, 2012 | Never finaled issued Mar 2012, no final | 676 Geary St | remove and replace balcony on front of building at unit 502Details
remove and replace balcony on front of building at unit 502 | $15,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 1355 Lombard St | unit 103: replace kitchen cabinet, countertop, new appliances, new bath fixtures, tiles, lavatory sink, tub remain new flooringDetails
unit 103: replace kitchen cabinet, countertop, new appliances, new bath fixtures, tiles, lavatory sink, tub remain new flooring | $15,000 |
| Mar 26, 2012 | Completed final sign-off Mar 2013 | 1840 Clay St | stucco patch and paintDetails
stucco patch and paint | $5,000 |
| Apr 28, 2010 | Expired or cancelled expired Apr 2013 | 1418 Van Dyke Av | remodel kitchen, replace all cabinetry, sink, flooring, new doors on exisitng paint interior, light fixture.Details
remodel kitchen, replace all cabinetry, sink, flooring, new doors on exisitng paint interior, light fixture. | $40,000 |
| Jul 1, 2009 | Expired or cancelled expired Jan 2011 | 25 Burlwood Dr | to obtain final inspection for work approved under pa#200704199242. all work is complete.Details
to obtain final inspection for work approved under pa#200704199242. all work is complete. | |
| Apr 19, 2007 | Expired or cancelled expired Jun 2009 | 25 Burlwood Dr | vertical addition: additional 1 level over (e) one story over garage.Details
vertical addition: additional 1 level over (e) one story over garage. | $74,500 |
| Jul 18, 2005 | Never finaled issued Jul 2005, no final | 76 Castro St | remodel (e) bathroom: remove & replace (e) exhaust fan. replace (e) lavatory sink. remove & replaceDetails
remodel (e) bathroom: remove & replace (e) exhaust fan. replace (e) lavatory sink. remove & replace | $2,400 |
| Aug 5, 2004 | Completed final sign-off Feb 2005 | 525 07th Av | remodel extg bathroom/skylight on 3rd floorDetails
remodel extg bathroom/skylight on 3rd floor | $4,500 |
| Feb 2, 2001 | Completed final sign-off Feb 2001 | 69 Palm Av | renew application 9704479s/vertical additionDetails
renew application 9704479s/vertical addition | |
| Jan 2, 2001 | Completed final sign-off Feb 2001 | 69 Palm Av | to renew permit#9618746Details
to renew permit#9618746 |