J C Quality Construction
- Based in
- San Franciso
- On San Francisco permits
- Mar 2015 to Jul 2017
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2017 | Completed final sign-off Aug 2017 | 2466 Francisco St | replacing kitchen countertops and backsplashes, and install a new garbage disposal and new kwitchen sink.Details
replacing kitchen countertops and backsplashes, and install a new garbage disposal and new kwitchen sink. | $3,200 |
| May 11, 2016 | Completed final sign-off Jun 2016 | 2650 Franklin St | unit #36 - replace bathtub surrounding tiles to quartz panels in the bathroom, patch-up walls in kitchen & bathroom after plumbing work is done. install kitchen countertops (one 8'& one 18"). n/a maher ordinanceDetails
unit #36 - replace bathtub surrounding tiles to quartz panels in the bathroom, patch-up walls in kitchen & bathroom after plumbing work is done. install kitchen countertops (one 8'& one 18"). n/a maher ordinance | $3,000 |
| Nov 23, 2015 | Completed final sign-off Mar 2016 | 2650 Franklin St | unit 30: replace bathtub surrounding tiles, repalce floor tiles. patch up walls after plumbing work is done.Details
unit 30: replace bathtub surrounding tiles, repalce floor tiles. patch up walls after plumbing work is done. | $1,500 |
| Nov 23, 2015 | Never finaled issued Nov 2015, no final | 1023 York St | unit 1023: renovation for bathroom, new plumbig and electrical fixtures. new gfci outlets, replce bathroom,surrounding tiles. replace floor tiles.Details
unit 1023: renovation for bathroom, new plumbig and electrical fixtures. new gfci outlets, replce bathroom,surrounding tiles. replace floor tiles. | $3,000 |
| Aug 7, 2015 | Completed final sign-off Sep 2015 | 2650 Franklin St | unit 35: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required.Details
unit 35: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required. | $1,000 |
| Aug 7, 2015 | Completed final sign-off Sep 2015 | 2650 Franklin St | unit 34: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. countertop replacement in kitchen. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required.Details
unit 34: replace bathtub surrounding tiles, replace floor tiles, patch walls after plumbing work is done. countertop replacement in kitchen. no walls to be moved/no structural. all fire rated assemblies to be maintained. compliance with maher ordinance no 155-13 not required. | $1,000 |
| May 15, 2015 | Completed final sign-off Jun 2015 | 2650 Franklin St | unit 37: replace bathtub surrounding tiles, new faucet, replace floor tiles for bathroom & patch walls after plumbing work is done.Details
unit 37: replace bathtub surrounding tiles, new faucet, replace floor tiles for bathroom & patch walls after plumbing work is done. | $1,000 |
| Mar 25, 2015 | Completed final sign-off Apr 2015 | 1945 Clay St | repair waste pipe accessible in unit 9 servicing unit 14; drywall repair/replacement related to waste pipe repair. drywall shall be 5/8" type x gypsum board.Details
repair waste pipe accessible in unit 9 servicing unit 14; drywall repair/replacement related to waste pipe repair. drywall shall be 5/8" type x gypsum board. | $500 |