J C General Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 8 permits filed
46 permits since 2000: 32 completed, 7 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 30 Beckett St | remodel 3rd floor kitchen like to like. remodel 3rd floor half to full bath.Details
remodel 3rd floor kitchen like to like. remodel 3rd floor half to full bath. | $30,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 861 Brussels St | kitchen remodel. cabinet replace. outlet, switch, garbage disposal replace. kitchen sink & faucet replace. kitchen floor replace.Details
kitchen remodel. cabinet replace. outlet, switch, garbage disposal replace. kitchen sink & faucet replace. kitchen floor replace. | $20,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 263 Somerset St | comply to complaint #202651568: convert (e) bathroom into two full bath on 2nd floor. no structural alteration under this permit. no exterior work.Details
comply to complaint #202651568: convert (e) bathroom into two full bath on 2nd floor. no structural alteration under this permit. no exterior work. | $20,000 |
| Nov 4, 2025 | In progress issued Dec 2025 | 1923 Ocean Av | g/f t.i. to remodel e) restaurant: remodel e) ada restroom to comply w/ current code, new food pre area in the front to comply w/nov 202545263 & 202537382Details
g/f t.i. to remodel e) restaurant: remodel e) ada restroom to comply w/ current code, new food pre area in the front to comply w/nov 202545263 & 202537382 | $50,000 |
| Oct 17, 2025 | In progress issued Oct 2025 | 1923 Ocean Av | remove and replace drywall that will be cut out to address a sewer leak issue, approx ceiling 230 sq ft, wall approx. 500 sq ft, paint interior wall and ceiling work only, interior work only.Details
remove and replace drywall that will be cut out to address a sewer leak issue, approx ceiling 230 sq ft, wall approx. 500 sq ft, paint interior wall and ceiling work only, interior work only. | $12,000 |
| Sep 18, 2025 | In progress issued Nov 2025 | 547 Taraval St | prop h: commercial ti, improve (e) tenant space to (n) juice bar.Details
prop h: commercial ti, improve (e) tenant space to (n) juice bar. | $80,000 |
| Sep 3, 2025 | Completed final sign-off Nov 2025 | 1720 Fulton St | change of use from bank to gym. tenant improvement. new interior partitions, finishes, millwork. restroom alteration for ada. electrical lighting. sprinkler under separate permit. (no juice bar & hot tub)Details
change of use from bank to gym. tenant improvement. new interior partitions, finishes, millwork. restroom alteration for ada. electrical lighting. sprinkler under separate permit. (no juice bar & hot tub) | $65,000 |
| Dec 30, 2024 | Completed final sign-off Apr 2026 | 182 Tioga Av | comply w/ complaint #202432302: like to like kitchen & bathroom remodel w/ new counters, kitchen appliances, and plumbing fixtures. new flooring. re-wire electric & lighting. no layout change. all work on 2/f only.Details
comply w/ complaint #202432302: like to like kitchen & bathroom remodel w/ new counters, kitchen appliances, and plumbing fixtures. new flooring. re-wire electric & lighting. no layout change. all work on 2/f only. | $6,500 |
| Sep 24, 2024 | Completed final sign-off Mar 2025 | 3660 20th St | unit 5: add electric heater to address complaint 201836931 item #2.Details
unit 5: add electric heater to address complaint 201836931 item #2. | $20,000 |
| Sep 24, 2024 | In progress issued Jan 2025 | 445 Irving St | unit a: one kitchen and one bath remodel, replace the unit flooringDetails
unit a: one kitchen and one bath remodel, replace the unit flooring | $40,000 |
| Apr 25, 2024 | Completed final sign-off May 2024 | 1040 Montgomery St | existing deck to be removed on the roof. complaint #202421767Details
existing deck to be removed on the roof. complaint #202421767 | $3,000 |
| Mar 25, 2024 | Expired or cancelled expired Nov 2025 | 722 34th Av | one kitchen and 2 bathroom remodel replace flooring. no layout changesDetails
one kitchen and 2 bathroom remodel replace flooring. no layout changes | $35,000 |
| Nov 6, 2023 | Completed final sign-off Dec 2023 | 1886 32nd Av | replace the dry rot wood on top of the garage door, patching the stucco. not to exceed 100 square feetDetails
replace the dry rot wood on top of the garage door, patching the stucco. not to exceed 100 square feet | $3,000 |
| Sep 26, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | comply w/ complaint #202307925: revison to pa #202305167893 & 202305248447 - relocate bathroom & construct hallway to rear yard at g/f.Details
comply w/ complaint #202307925: revison to pa #202305167893 & 202305248447 - relocate bathroom & construct hallway to rear yard at g/f. | $2,000 |
| Sep 20, 2023 | Completed final sign-off Mar 2025 | 2924 Sacramento St | unit 3: install 2 new a/c units on the rooftop. 120lb eachDetails
unit 3: install 2 new a/c units on the rooftop. 120lb each | $5,000 |
| May 24, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | legalize bedroom, bathroom, & construct media room & wet bar at g/f. replace sheet rock w/ new at 2/f (revision under pa #202305167893.)Details
legalize bedroom, bathroom, & construct media room & wet bar at g/f. replace sheet rock w/ new at 2/f (revision under pa #202305167893.) | $235,150 |
| May 16, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | leaking found in (2) bathroom, need to repair. remodel master & guest bathroom. upgrade the (1) kitchen at the same time. add insulation at same time. hvac in back need to replace. in-kindDetails
leaking found in (2) bathroom, need to repair. remodel master & guest bathroom. upgrade the (1) kitchen at the same time. add insulation at same time. hvac in back need to replace. in-kind | $40,000 |
| Mar 24, 2023 | Never finaled issued May 2023, no final | 545 Taraval St | interior remodel on 2nd flr: remodel (e) kitchen and bathroom, add a study room. to comply w/ nov# 201972251Details
interior remodel on 2nd flr: remodel (e) kitchen and bathroom, add a study room. to comply w/ nov# 201972251 | $50,000 |
| Dec 19, 2022 | Completed final sign-off Mar 2023 | 1467 Mckinnon Av | one kitchen remodeling, non structuralDetails
one kitchen remodeling, non structural | $10,000 |
| Oct 6, 2022 | Completed final sign-off Nov 2022 | 1326 Shafter Av | comply with 202295421 and 202294683: remove bathroom gr fl. remove unpermitted plastic sheating from lightwell, clean and repair siding/dryrot at lightwell. new office 2nd fl. note: complaince w/nov shall be complete. no partical compliance.Details
comply with 202295421 and 202294683: remove bathroom gr fl. remove unpermitted plastic sheating from lightwell, clean and repair siding/dryrot at lightwell. new office 2nd fl. note: complaince w/nov shall be complete. no partical compliance. | $6,000 |
| Aug 3, 2022 | Completed final sign-off Feb 2023 | 1241 Vicente St | upgrade (e) front door & toilet room to ada req'd. install automatic push button for front door. all work on g/f (1241 vicente st.)Details
upgrade (e) front door & toilet room to ada req'd. install automatic push button for front door. all work on g/f (1241 vicente st.) | $28,000 |
| Jun 3, 2022 | Never finaled issued Oct 2022, no final | 675 Jackson St | foundation repairDetails
foundation repair | $20,000 |
| May 9, 2022 | Completed final sign-off Apr 2025 | 2924 Sacramento St | remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yardDetails
remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yard | $30,000 |
| Mar 17, 2022 | Completed final sign-off Jan 2023 | 445 Irving St | remodel the bathroom and kitchen. replace tiles, toilet, vanity in bath. replace cabinets, counter top, appliances & flooring in kitchen.Details
remodel the bathroom and kitchen. replace tiles, toilet, vanity in bath. replace cabinets, counter top, appliances & flooring in kitchen. | $20,000 |
| Oct 19, 2021 | Completed final sign-off Nov 2021 | 6 Arleta Av | to obtain final inspection for app#201908068089, 202002063744, 201903296600. allwork is complete.Details
to obtain final inspection for app#201908068089, 202002063744, 201903296600. allwork is complete. | |
| Dec 28, 2020 | Completed final sign-off Oct 2022 | 733 Laguna Honda Bl | project proposes for the addition of a 2 bedroom and one bathroom accessory dwelling unit at the ground level of a detached single family residence by converting the rear section of the existing garage within the existing building envelope.Details
project proposes for the addition of a 2 bedroom and one bathroom accessory dwelling unit at the ground level of a detached single family residence by converting the rear section of the existing garage within the existing building envelope. | $100,000 |
| Aug 7, 2020 | Expired or cancelled cancelled Jan 2026 | 1323 Cortland Av | trench out the sidewalk and install a new water meter box and new 1 in copper water line to the existing building; install backflow and valve, and replace the sidewalkDetails
trench out the sidewalk and install a new water meter box and new 1 in copper water line to the existing building; install backflow and valve, and replace the sidewalk | $3,000 |
| Jul 31, 2020 | Completed final sign-off Oct 2020 | 2115 Alemany Bl | replace 9 windows at the back yard site, not street visibleDetails
replace 9 windows at the back yard site, not street visible | $8,000 |
| Jul 6, 2020 | Completed final sign-off Mar 2023 | 1635 Lake St | to comply with nov# 202025241add steel beam to support (e) framing, comply with nov 2020153 replace (e) backyard staircase wtih new steel staircaseDetails
to comply with nov# 202025241add steel beam to support (e) framing, comply with nov 2020153 replace (e) backyard staircase wtih new steel staircase | $10,000 |
| Jun 10, 2020 | Completed final sign-off Sep 2020 | 1253 47th Av | replace damaged drywall, cabinet ,counter top, reinstall the new appliance in kitchen. all work in kind.Details
replace damaged drywall, cabinet ,counter top, reinstall the new appliance in kitchen. all work in kind. | $15,000 |
| Feb 6, 2020 | Completed final sign-off Nov 2021 | 6 Arleta Av | revision to approved permit #201903296600. relocate kitchen cabinet & counter.Details
revision to approved permit #201903296600. relocate kitchen cabinet & counter. | |
| Dec 20, 2019 | Completed final sign-off Aug 2020 | 445 Irving St | unit a: 9'x 8' kitchen & 3'x 8' bathroom remodel. no alterations wallDetails
unit a: 9'x 8' kitchen & 3'x 8' bathroom remodel. no alterations wall | $30,000 |
| Oct 11, 2019 | Expired or cancelled cancelled Jan 2026 | 383 Vernon St | redo the front yard to reach the 20% landscaping. fixt the complaint 2017-007423 enfDetails
redo the front yard to reach the 20% landscaping. fixt the complaint 2017-007423 enf | $1,500 |
| Sep 26, 2019 | Never finaled issued Nov 2019, no final | 219 King St | revise (e) permit application #201312315439. to modify existing approved restaurant floor layout to create new working station for drinks.Details
revise (e) permit application #201312315439. to modify existing approved restaurant floor layout to create new working station for drinks. | $34,000 |
| Sep 10, 2019 | Completed final sign-off Mar 2020 | 334 Victoria St | upgrade (e) room & construct 1 full bath rm at ground fl.; remodel (e) kitchen, bath rm & convert (e) closet to half bath rm. at 2nd fl.Details
upgrade (e) room & construct 1 full bath rm at ground fl.; remodel (e) kitchen, bath rm & convert (e) closet to half bath rm. at 2nd fl. | $56,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2021 | 6 Arleta Av | voluntary structural upgrade on the 1st fl per 2016 cebc apprndix a4. no exterior work. unit legalization on a separate permitDetails
voluntary structural upgrade on the 1st fl per 2016 cebc apprndix a4. no exterior work. unit legalization on a separate permit | $12,000 |
| Jun 21, 2019 | Completed final sign-off Oct 2019 | 430 Green St | floor and counter top replacement in kind in kitchenDetails
floor and counter top replacement in kind in kitchen | $12,000 |
| Mar 29, 2019 | Completed final sign-off Nov 2021 | 6 Arleta Av | legalize kitchen in (e) living space in 1st floor. change (e) toilet to a full bath per ordinance 43-14Details
legalize kitchen in (e) living space in 1st floor. change (e) toilet to a full bath per ordinance 43-14 | $30,000 |
| Nov 15, 2018 | Completed final sign-off Feb 2019 | 1930 Ocean Av | tenant improvement: change of use from retail to beauty salon. reframe, elec, plumb, flooring, finishes, equipment.Details
tenant improvement: change of use from retail to beauty salon. reframe, elec, plumb, flooring, finishes, equipment. | $15,000 |
| Aug 17, 2018 | Completed final sign-off Oct 2018 | 639 Grand View Av | to obtain final inspection for work approved under pa 201508174436 and pa 201402118269.Details
to obtain final inspection for work approved under pa 201508174436 and pa 201402118269. | |
| Feb 13, 2018 | Completed final sign-off Mar 2019 | 59 Buena Vista Tr | add entertainment, media room, office, den & 3 fixtures full bathroom on 1st floor per plan. add interior staircase to create interior connection between 1st and 2nd floor per planDetails
add entertainment, media room, office, den & 3 fixtures full bathroom on 1st floor per plan. add interior staircase to create interior connection between 1st and 2nd floor per plan | $35,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 443 Irving St | remodel (e) kitchen & (e) bathroom.Details
remodel (e) kitchen & (e) bathroom. | $28,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2018 | 639 Grand View Av | revision to pa #201402118269. deck support details. elimination of fire sprinkler system per code 1012. revise window and door plan on pa# 201401228264Details
revision to pa #201402118269. deck support details. elimination of fire sprinkler system per code 1012. revise window and door plan on pa# 201401228264 | $18,000 |
| Sep 1, 2017 | Completed final sign-off Nov 2017 | 64 Hiliritas Av | remodel kitchen, replace tile, cabinets, new sinks & faucet, new lights and switches. bathroom: tile replacement in shower area.Details
remodel kitchen, replace tile, cabinets, new sinks & faucet, new lights and switches. bathroom: tile replacement in shower area. | $8,000 |
| Jul 10, 2017 | Completed final sign-off Jul 2017 | 1319 22nd Av | to comply with nov#201786071 item #2: in west room, south facing window replacement, non-street facing.Details
to comply with nov#201786071 item #2: in west room, south facing window replacement, non-street facing. | $600 |
| Feb 11, 2014 | Never finaled issued Oct 2014, no final | 639 Grand View Av | horizontal addition. add bedroom & family room @ basement level. relocate kitchen & living room to 1st floor. remodel 2nd floor.Details
horizontal addition. add bedroom & family room @ basement level. relocate kitchen & living room to 1st floor. remodel 2nd floor. | $300,000 |