Ishida Builders
- Based in
- San Mateo
- On San Francisco permits
- Apr 2013 to Jun 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2021 | Completed final sign-off Dec 2021 | 777 Brotherhood Wy | remove 5 interior non-structural walls. patch dry wall and paint. frame 6 doorsDetails
remove 5 interior non-structural walls. patch dry wall and paint. frame 6 doors | $3,200 |
| May 19, 2016 | Completed final sign-off Jun 2016 | 2261 Fulton St | repair and replace dry rot in siding. siding to be replaced d/ the same materials. paint lightwell. area measures approx. 500 sq. ft. all proposed work is non-structural and not visible from the street.Details
repair and replace dry rot in siding. siding to be replaced d/ the same materials. paint lightwell. area measures approx. 500 sq. ft. all proposed work is non-structural and not visible from the street. | $15,000 |
| Jan 25, 2016 | Completed final sign-off Mar 2016 | 2255 Fulton St | bathroom remodel. replace existing fixtures and finishes. no structural alterations.Details
bathroom remodel. replace existing fixtures and finishes. no structural alterations. | $8,000 |
| Sep 29, 2015 | Completed final sign-off Mar 2016 | 2255 Fulton St | addition of half bath on ground floor including new lavatory & new toilet for 2255 fulton, not accessible to other units. lighting at half bath. maher naDetails
addition of half bath on ground floor including new lavatory & new toilet for 2255 fulton, not accessible to other units. lighting at half bath. maher na | $7,500 |
| Jun 4, 2014 | Completed final sign-off Jun 2014 | 1937 Taylor St | 5/8" type "x" sheetrock walls & ceilings in storage room at garage level.Details
5/8" type "x" sheetrock walls & ceilings in storage room at garage level. | $2,000 |
| Nov 4, 2013 | Never finaled issued Nov 2013, no final | 2255 Fulton St | to comply with physical inspection report cc# 7315 mechanical install 26 ga duct at side hall & fire caulk at penetrations w garageDetails
to comply with physical inspection report cc# 7315 mechanical install 26 ga duct at side hall & fire caulk at penetrations w garage | $700 |
| Apr 1, 2013 | Completed final sign-off Apr 2013 | 101 Los Palmos Dr | replace (e) handrails on existing concrete deck - 42" height spacing not to exceed 4", bolt mudsill to concret foundation, install (3) simpson holddowns on 4x4 posts -5/8' galv all thread 7" embed. all wt in basement. install ufp10 -sds3 where low clearance will not permit bolting.Details
replace (e) handrails on existing concrete deck - 42" height spacing not to exceed 4", bolt mudsill to concret foundation, install (3) simpson holddowns on 4x4 posts -5/8' galv all thread 7" embed. all wt in basement. install ufp10 -sds3 where low clearance will not permit bolting. | $6,000 |