Iproperty Solutions
- Based in
- Daly City
- On San Francisco permits
- Jul 2025 to Jan 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2026 | Completed final sign-off Apr 2026 | 220 Francisco St | revision to pa#202507160915. the 2 windows in kitchen, one will closed off and the other one willl be replaced. change kitchen layout, one window in living room , one in laundry room will be replaced. add landing in front +Details
revision to pa#202507160915. the 2 windows in kitchen, one will closed off and the other one willl be replaced. change kitchen layout, one window in living room , one in laundry room will be replaced. add landing in front + | $2,500 |
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 220 Francisco St | unit 222: move (e) subpanel, keep 70 amp rating. patch holes/ openings. install mini split system 3t, 4 head units. plumbing - copper pipes for head units between living room to bedroom + office. unit 220 a: install mini split system 1.5t, 2 head units.Details
unit 222: move (e) subpanel, keep 70 amp rating. patch holes/ openings. install mini split system 3t, 4 head units. plumbing - copper pipes for head units between living room to bedroom + office. unit 220 a: install mini split system 1.5t, 2 head units. | $18,000 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 220 Francisco St | unit #220a: remodel (e) kitchen and bathroom. all new electrical at g/f unit.Details
unit #220a: remodel (e) kitchen and bathroom. all new electrical at g/f unit. | $75,000 |