Integrated Design
- Based in
- Princeville
- On San Francisco permits
- Oct 2009 to Apr 2010
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2010 | Completed final sign-off Jun 2010 | 711 Castro St | revision to pa# 2009.12.08.2817. additional dry rot repair at rear walls, stair wells and landing platforms, adddrop ceilings on all floors w/ strapping and new 5/8" ext. grade plywood siding. new closet, new window sizes at rear, crawl space vents.Details
revision to pa# 2009.12.08.2817. additional dry rot repair at rear walls, stair wells and landing platforms, adddrop ceilings on all floors w/ strapping and new 5/8" ext. grade plywood siding. new closet, new window sizes at rear, crawl space vents. | $7,500 |
| Dec 23, 2009 | Completed final sign-off Jun 2010 | 711 Castro St | correction to plan dimensions and revisions to shear walls. reference to application no. 2009/1208/2817 (permit no. 1201079)Details
correction to plan dimensions and revisions to shear walls. reference to application no. 2009/1208/2817 (permit no. 1201079) | |
| Dec 8, 2009 | Completed final sign-off Jun 2010 | 711 Castro St | dry rot repair-voluntary strengthening, same for same.Details
dry rot repair-voluntary strengthening, same for same. | $40,000 |
| Oct 30, 2009 | Completed final sign-off Jun 2010 | 711 Castro St | dry rot repair @rear wall, replace in kind, 400 ft (+ or -), at rt rear corner (se corner).Details
dry rot repair @rear wall, replace in kind, 400 ft (+ or -), at rt rear corner (se corner). | $15,000 |