Innovative Construction
- Based in
- Oakland
- On San Francisco permits
- Apr 2018 to Sep 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 351 Buena Vista East Av | unit 503e:install new laundry box for new compact ventless washer & dryer at existing closet location. upgrade existing panel to 120 amp. install new 240v plug for electrical dryer.Details
unit 503e:install new laundry box for new compact ventless washer & dryer at existing closet location. upgrade existing panel to 120 amp. install new 240v plug for electrical dryer. | $4,800 |
| Apr 6, 2018 | Completed final sign-off Jun 2018 | 355 Buena Vista East Av | relocate (e) sub panel from bedroom closet location sto outside hallway. install h.c water laundry box in (e) closet for future appliance useDetails
relocate (e) sub panel from bedroom closet location sto outside hallway. install h.c water laundry box in (e) closet for future appliance use | $7,200 |