- 5 permits filed
28 permits since 2000: 20 completed, 3 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1125 Irving St | recommencement and completion of work approved under pa# 202507100543Details
recommencement and completion of work approved under pa# 202507100543 | |
| Jun 30, 2026 | In progress issued Jul 2026 | 1645 Waller St | nov# 202657937. #3-14 to include repair sheetrock, stairs handrails in kind less than 50% relocate trash receptables, intercom. remove plastic roof cover, repair penthouse door and inter walls in kind. repair to exterior deck and fire ladder handrails at rear in kind. less than 50%Details
nov# 202657937. #3-14 to include repair sheetrock, stairs handrails in kind less than 50% relocate trash receptables, intercom. remove plastic roof cover, repair penthouse door and inter walls in kind. repair to exterior deck and fire ladder handrails at rear in kind. less than 50% | $3,800 |
| Oct 9, 2025 | Completed final sign-off Oct 2025 | 1135 Church St | correct nov #202540403 repair work to repair stairs of building item #1. less than 50% repair. stairs are in rear, non street visible.Details
correct nov #202540403 repair work to repair stairs of building item #1. less than 50% repair. stairs are in rear, non street visible. | $2,000 |
| Jul 10, 2025 | In progress issued Jul 2025 | 1125 Irving St | find and repair leak in lightwell.Details
find and repair leak in lightwell. | $6,000 |
| Feb 10, 2025 | Completed final sign-off Dec 2025 | 1040 Bryant St | change of use from b/u to b/f-1 continuation of existing industrial (cultivational) ag. for cannabis and new distribution (wholesale sales)Details
change of use from b/u to b/f-1 continuation of existing industrial (cultivational) ag. for cannabis and new distribution (wholesale sales) | |
| May 10, 2023 | Completed final sign-off Aug 2024 | 4264 Mission St | replace in kind exterior convenience staircase at rear of commercial unit 4264 mission st.not part of egress access nor required to beDetails
replace in kind exterior convenience staircase at rear of commercial unit 4264 mission st.not part of egress access nor required to be | $4,000 |
| Dec 12, 2022 | Completed final sign-off Jul 2023 | 700 25th Av | modifying top of existing blended transition to be compliant with accessible business entrance ord. 51-16. install. abe 202205311168Details
modifying top of existing blended transition to be compliant with accessible business entrance ord. 51-16. install. abe 202205311168 | $6,000 |
| Oct 27, 2022 | Completed final sign-off Aug 2024 | 4260 Mission St | revision to pa#202104168715; shearwall changes foundation and shearwall revisions. (residential)Details
revision to pa#202104168715; shearwall changes foundation and shearwall revisions. (residential) | $1,000 |
| Oct 27, 2022 | Completed final sign-off Aug 2024 | 4260 Mission St | revision to pa#202104168716; foundation and shearwall revisions.(commercial)Details
revision to pa#202104168716; foundation and shearwall revisions.(commercial) | |
| May 18, 2022 | Never finaled issued May 2022, no final | 1608 Larkin St | rot repair on exterior stairs at rear/back of the building.Details
rot repair on exterior stairs at rear/back of the building. | $10,000 |
| Oct 4, 2021 | Never finaled issued Oct 2021, no final | 161 Page St | provide temporary shoring for permit application #2021/0603/1590Details
provide temporary shoring for permit application #2021/0603/1590 | $20,000 |
| Jun 3, 2021 | Completed final sign-off Mar 2022 | 161 Page St | replace existing foundation and add new plywood to walls at garage level. voluntary work.Details
replace existing foundation and add new plywood to walls at garage level. voluntary work. | $70,000 |
| Apr 16, 2021 | Completed final sign-off Aug 2024 | 4260 Mission St | mandatory soft story retrofit per sfebc ch 4d & 2019 cebc appendix a-4. (residential portion)Details
mandatory soft story retrofit per sfebc ch 4d & 2019 cebc appendix a-4. (residential portion) | $64,000 |
| Apr 16, 2021 | Completed final sign-off Aug 2024 | 4260 Mission St | mandatory soft story retrofit per sfebc ch 4d & 2019 cebc appendix a-4. 3 accessible bathrooms. 2 door actuators per ab05. (commercial portion)Details
mandatory soft story retrofit per sfebc ch 4d & 2019 cebc appendix a-4. 3 accessible bathrooms. 2 door actuators per ab05. (commercial portion) | $32,000 |
| Apr 4, 2019 | Completed final sign-off Nov 2024 | 1040 Bryant St | to correct complaint #202425058 for unpermitted work. no connecting doors between 72 converse and 1040 bryant street. instead build 2 hour fire wall.Details
to correct complaint #202425058 for unpermitted work. no connecting doors between 72 converse and 1040 bryant street. instead build 2 hour fire wall. | $5,000 |
| Mar 6, 2019 | Completed final sign-off Apr 2019 | 1053 Oak St | to comply with nov # 201920231 # 3, replade in kind repair 20 ft of (e) stairs back of the bldgDetails
to comply with nov # 201920231 # 3, replade in kind repair 20 ft of (e) stairs back of the bldg | $1,300 |
| Jan 24, 2019 | Expired or cancelled cancelled Jan 2019 | 3414 California St | find leak in roof and fix. repair in-kindDetails
find leak in roof and fix. repair in-kind | $5,000 |
| Jan 23, 2019 | Completed final sign-off Nov 2019 | 2557 22nd Av | rot repair, remove and replace rotten wood siding at the rear of the subject building.Details
rot repair, remove and replace rotten wood siding at the rear of the subject building. | $5,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 1477 09th Av | revision to 201609238673 add storage room to (e) parking garageDetails
revision to 201609238673 add storage room to (e) parking garage | $7,000 |
| Oct 4, 2018 | Completed final sign-off Nov 2018 | 731 South Van Ness Av | repair brick work on front facade of building. 60 sq ft of repair, repointing, replacement of mortar joints in kind at 2nd level.Details
repair brick work on front facade of building. 60 sq ft of repair, repointing, replacement of mortar joints in kind at 2nd level. | $8,000 |
| Feb 6, 2018 | Completed final sign-off Jul 2018 | 150 Shawnee Av | replace existing brick step at front of building exterior, 50% repair to existing onlyDetails
replace existing brick step at front of building exterior, 50% repair to existing only | $8,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2018 | 845 Marina Bl | remodel one bathroom on top level, no change in walls & openings. new tile work, new bathroom fixtures. relocate light fixtures, painting, replace shower valve, shower pan. maher naDetails
remodel one bathroom on top level, no change in walls & openings. new tile work, new bathroom fixtures. relocate light fixtures, painting, replace shower valve, shower pan. maher na | $19,000 |
| Sep 14, 2017 | Completed final sign-off Oct 2019 | 1595 Noe St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $75,000 |
| Aug 28, 2017 | Completed final sign-off Jan 2018 | 1628 Haight St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $27,000 |
| Aug 24, 2017 | Completed final sign-off Sep 2018 | 33 Elgin Pk | compliance w/ mandatory seismic retrofit program per 2015 iebc appendix a-4. ** maher: n/a **Details
compliance w/ mandatory seismic retrofit program per 2015 iebc appendix a-4. ** maher: n/a ** | $60,000 |
| Apr 7, 2017 | Completed final sign-off Jul 2017 | 3414 California St | bathroom remodel: new shower pan and tile, mixing valve, new floor and wall tile. rmeoving one of the two (e) sinks and install new bidet, paint.Details
bathroom remodel: new shower pan and tile, mixing valve, new floor and wall tile. rmeoving one of the two (e) sinks and install new bidet, paint. | $18,600 |
| Nov 21, 2016 | Never finaled issued Dec 2016, no final | 111 Toland St | administrative change of use, no construction to be performed under this permit. tenant improvement under separte permit. n/a maher ord. 155-13Details
administrative change of use, no construction to be performed under this permit. tenant improvement under separte permit. n/a maher ord. 155-13 | |
| Sep 23, 2016 | Completed final sign-off Nov 2019 | 1477 09th Av | adding bathroom, bedroom replace windows flooring. all work at basement level.Details