In&Out Plumbing And Construction
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2014 to Aug 2026
- Last 24 months
- 5 permits filed
17 permits since 2000: 8 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 1367 Rhode Island St | less than 50% repair at the front: remove (e) terrazo and brick stairs to fix existing damaged. waterproof membrane and replace with grace waterproof membrane. repair any dry rotted spots on the plywood and landings. new stairs replace with split red bricks. no terrazzo back.Details
less than 50% repair at the front: remove (e) terrazo and brick stairs to fix existing damaged. waterproof membrane and replace with grace waterproof membrane. repair any dry rotted spots on the plywood and landings. new stairs replace with split red bricks. no terrazzo back. | $3,500 |
| Jun 23, 2026 | In progress issued Jul 2026 | 1526 Wallace Av | revision to 202503252996: revise the e) cooler inside the marketDetails
revision to 202503252996: revise the e) cooler inside the market | |
| Jul 1, 2025 | Completed final sign-off Sep 2025 | 465 Hayes St | replace existing hand sink oven with turbochef oven. install 1 50 amp circuitDetails
replace existing hand sink oven with turbochef oven. install 1 50 amp circuit | $5,000 |
| Mar 25, 2025 | In progress issued Apr 2026 | 1526 Wallace Av | convert a vacant space into mini mareket, layout equipmenmt: such as shelves, tables, rerigeration, paint, change the flooring.Details
convert a vacant space into mini mareket, layout equipmenmt: such as shelves, tables, rerigeration, paint, change the flooring. | $15,000 |
| Dec 9, 2024 | Expired or cancelled withdrawn Mar 2025 | 1526 Wallace Av | we will paint the place and change the floor. convert a vacant space into a mini market. layout equipment such as shelving, tables and refrigerators.Details
we will paint the place and change the floor. convert a vacant space into a mini market. layout equipment such as shelving, tables and refrigerators. | $18,000 |
| Sep 9, 2024 | In progress issued Dec 2024 | 510 Valencia St | existing vacant retail space to be converted into a restaurant. modify floor plan. remove wood floor to make entry door accessible. new toilet to accessible req'ment. new type-i hood.Details
existing vacant retail space to be converted into a restaurant. modify floor plan. remove wood floor to make entry door accessible. new toilet to accessible req'ment. new type-i hood. | $120,000 |
| Apr 19, 2024 | Completed final sign-off Oct 2024 | 2055 Union St | demo and rebuild (e) service counter and replace kitchen equipment in kind replace non ada bathroom sink and install required ada signageDetails
demo and rebuild (e) service counter and replace kitchen equipment in kind replace non ada bathroom sink and install required ada signage | $50,000 |
| May 17, 2023 | Completed final sign-off May 2024 | 730 Howard St | tenant ti renovation to remove and replace finishes, plumbing fixtures, and lighting; add toilet partitions in restrooms. mew food service equipment in service and food prep areasDetails
tenant ti renovation to remove and replace finishes, plumbing fixtures, and lighting; add toilet partitions in restrooms. mew food service equipment in service and food prep areas | $45,000 |
| Mar 28, 2023 | Expired or cancelled cancelled Jan 2026 | 730 Howard St | carpentry, plumbing, electrical, fixture installation (minor modifications), wall patching, floor patching, cabinet removal, plug upgrade.Details
carpentry, plumbing, electrical, fixture installation (minor modifications), wall patching, floor patching, cabinet removal, plug upgrade. | $19,000 |
| Sep 8, 2021 | Completed final sign-off Jun 2022 | 333 Bush St | installing 12 long glass partition wall on the 5th fl. the glass wall seperates the (e) office for sound and privacyDetails
installing 12 long glass partition wall on the 5th fl. the glass wall seperates the (e) office for sound and privacy | $15,000 |
| Aug 12, 2021 | Completed final sign-off Aug 2021 | 661 Cayuga Av | to comply with nov 202180838 replace gutter drain on lightwell.Details
to comply with nov 202180838 replace gutter drain on lightwell. | $1,900 |
| Aug 5, 2021 | Never finaled filed Aug 2021, never issued | 1144 Irving St | existing rear detached structure to be converted to new accessory u occupancy structure. comply w/ n.o.v bid-202176965.Details
existing rear detached structure to be converted to new accessory u occupancy structure. comply w/ n.o.v bid-202176965. | $50,000 |
| Aug 26, 2020 | Completed final sign-off Oct 2020 | 1 Daniel Burnham Ct | replace bathroom tub shower, like for like. replace bathroom tile with new.Details
replace bathroom tub shower, like for like. replace bathroom tile with new. | $10,000 |
| May 22, 2019 | Completed final sign-off May 2019 | 252 Chattanooga St | to obtain final inspection for work approved under pa # 201304194963. all work is complete.Details
to obtain final inspection for work approved under pa # 201304194963. all work is complete. | |
| Mar 14, 2018 | Never finaled issued Mar 2018, no final | 60 Rausch St | bathroom remodelDetails
bathroom remodel | $6,500 |
| Mar 6, 2018 | Never finaled issued Mar 2018, no final | 1258 12th Av | unit 1: kitchen upgrade in-kind, can light install, comply w/cec150.0 (k) 3, no structural work, no wall removal/relocationDetails
unit 1: kitchen upgrade in-kind, can light install, comply w/cec150.0 (k) 3, no structural work, no wall removal/relocation | $23,000 |
| Nov 7, 2014 | Completed final sign-off Feb 2015 | 15 Romolo Pl | to comply with nov 201467172. need to install handicapped grab bars at all community bathroomsDetails
to comply with nov 201467172. need to install handicapped grab bars at all community bathrooms | $5,600 |