In Charge Energy Inc
- Based in
- Los Angeles
- On San Francisco permits
- Jan 2022 to Jul 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2025 | In progress issued Nov 2025 | 1401 Folsom St | installation of ev charging station and their accompany civil and electrical infrastructure. demolition of existing surfaces. grading of 37 cubic yards of soil. insall 1 utitlity transform, 1 switchboard assembly, 5 400kw alpitronic hyc400 ev chargers, 8 ev sign posts, 2 accessible ev sign posts,Details
installation of ev charging station and their accompany civil and electrical infrastructure. demolition of existing surfaces. grading of 37 cubic yards of soil. insall 1 utitlity transform, 1 switchboard assembly, 5 400kw alpitronic hyc400 ev chargers, 8 ev sign posts, 2 accessible ev sign posts, | $400,000 |
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 855 Geary St | revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plansDetails
revision to pa#: 202204132175. 1st flr installation of ev chargers within eixsting parking garage. added 2 mini-split condenser/fan coil units for the elec distribution room. added direct-current fast charging. relocated distrib. panel. misc chnages per plans | $60,000 |
| Nov 7, 2022 | Never finaled filed Nov 2022, never issued | 855 Geary St | install new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargersDetails
install new electrical service/room, electrical equipment, pipe, wire, etc., for insall of (22) 180kw dc ev chargers & (17) 40a level 2 chargers | $1,100,000 |
| Apr 13, 2022 | Completed final sign-off Jan 2024 | 855 Geary St | basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit.Details
basement/2 & ground floors: installation of charging infrastructure for plug-in hybrid electric vehicles, including: new electrical service & switch gear. electrical distribution equipment, ac/dc charging equipment. chargers @ gr/f to be installed in future permit. | $65,000 |
| Jan 14, 2022 | Completed final sign-off Jan 2023 | 333 Brannan St | installation of charging infrastructure for plug-in hybrid electric vehicle chargers. not for public use.Details
installation of charging infrastructure for plug-in hybrid electric vehicle chargers. not for public use. | $150,000 |