Ideal Electric
- Based in
- Redwood City
- On San Francisco permits
- Sep 2022 to Jul 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2023 | Completed final sign-off Jul 2024 | 409 42nd Av | remodel kitchen & bathroom, add washer/dryer to bathroom, rewire all knob and tube, add sub panel, replace kitchen window not visible from st.Details
remodel kitchen & bathroom, add washer/dryer to bathroom, rewire all knob and tube, add sub panel, replace kitchen window not visible from st. | $45,500 |
| Jan 10, 2023 | Never finaled issued Jan 2023, no final | 425 01st St | unit 5202: redo shower tile, replace shower, change out flourescent recessed lights for led. no other work.Details
unit 5202: redo shower tile, replace shower, change out flourescent recessed lights for led. no other work. | $6,000 |
| Sep 22, 2022 | Never finaled issued Sep 2022, no final | 201 Arkansas St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $17,200 |