Ibr Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2019 to Feb 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2022 | Completed final sign-off Sep 2022 | 115 San Pablo Av | bathroom remodelingDetails
bathroom remodeling | $15,000 |
| Aug 4, 2021 | Completed final sign-off May 2022 | 1143 Naples St | to legalize (e) bathroom in exercise room @ ground floor. (n) wet bar in family room @ ground floor. (n) laundry @ upper floor.Details
to legalize (e) bathroom in exercise room @ ground floor. (n) wet bar in family room @ ground floor. (n) laundry @ upper floor. | $12,000 |
| Apr 2, 2021 | Completed final sign-off Aug 2021 | 460 Staples Av | exterior stair case replacmentDetails
exterior stair case replacment | $7,000 |
| Dec 9, 2020 | Completed final sign-off Nov 2021 | 187 Denslowe Dr | revision to pa 202011098471. kitchen remodel at ground fl. replace existing windows to sliding door. wall demo between nook & existing kitchen area, door openingDetails
revision to pa 202011098471. kitchen remodel at ground fl. replace existing windows to sliding door. wall demo between nook & existing kitchen area, door opening | $15,000 |
| Nov 9, 2020 | Completed final sign-off Dec 2021 | 187 Denslowe Dr | kitchen remodeling with no layout change. holding recess lightingDetails
kitchen remodeling with no layout change. holding recess lighting | $12,000 |
| Oct 7, 2020 | Completed final sign-off Apr 2021 | 685 Lakeview Av | provide rail at sides of (e) garage. provide metal gate at street entry. reframe (e) deck above garage due to dry rotDetails
provide rail at sides of (e) garage. provide metal gate at street entry. reframe (e) deck above garage due to dry rot | $15,000 |
| Dec 26, 2019 | Completed final sign-off Feb 2020 | 3 Mabrey Ct | two bathroom remodeling (no layout changing), kitchen remodeling (no layout changing)recessed lights adding. no removal of walls.Details
two bathroom remodeling (no layout changing), kitchen remodeling (no layout changing)recessed lights adding. no removal of walls. | $35,000 |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 1806 28th Av | remove existing window at storage room. infill with 1 hr fire resistive wall. not visible from streetDetails
remove existing window at storage room. infill with 1 hr fire resistive wall. not visible from street | $1,500 |