I D Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Oct 2010 to Nov 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2010 | Completed final sign-off Dec 2010 | 333 Greenwich St | to comply with physical inspection report #cc5604Details
to comply with physical inspection report #cc5604 | $500 |
| Oct 18, 2010 | Completed final sign-off Jan 2011 | 333 Greenwich St | repair water damage,patch sheet rock total area 100 sq ft per unit. patch hardwood floor. no structural work.Details
repair water damage,patch sheet rock total area 100 sq ft per unit. patch hardwood floor. no structural work. | $40,000 |