Hyline Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Sep 2023
- Last 24 months
- 0 permits filed
32 permits since 2000: 28 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2023 | Completed final sign-off Feb 2024 | 3962 20th St | remove parapet capping at 3rd floor deck and replace with new sheetmetal capping. remove and reinstall guardrail. replace degraded lumber or plywood as needed due to water intrusion. repair in kind.Details
remove parapet capping at 3rd floor deck and replace with new sheetmetal capping. remove and reinstall guardrail. replace degraded lumber or plywood as needed due to water intrusion. repair in kind. | $30,000 |
| Feb 16, 2022 | Completed final sign-off May 2022 | 61 Chattanooga St | existing brick guardrail and foundation at main entry stair to be rebuilt in kind-due to structural failure.Details
existing brick guardrail and foundation at main entry stair to be rebuilt in kind-due to structural failure. | $12,000 |
| Mar 4, 2021 | Completed final sign-off Oct 2021 | 1647 Sanchez St | replace (e) laundry cabinet & countertop, replaece master vanity cabinetry & counterrop. install new master closet cabinet system. upgrade cat 5 to fier cat 7 throughoutDetails
replace (e) laundry cabinet & countertop, replaece master vanity cabinetry & counterrop. install new master closet cabinet system. upgrade cat 5 to fier cat 7 throughout | $45,000 |
| Dec 29, 2016 | Never finaled issued Nov 2019, no final | 394 Laidley St | vertical + horizontal addition to (e) single family home within building area. inprovement to from facade. renovation @ interior. new kitchen, bath, plumbing, electrical, fire sprinkler + fire alarm under separate permit.Details
vertical + horizontal addition to (e) single family home within building area. inprovement to from facade. renovation @ interior. new kitchen, bath, plumbing, electrical, fire sprinkler + fire alarm under separate permit. | $300,000 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 1295 Church St | replace extg windows at west, south and east elevations at top floor. all windows shall be custom marvin aluminum clad wood to match (e) styl, dimension and profile. retain (e) sill , trim and frame.Details
replace extg windows at west, south and east elevations at top floor. all windows shall be custom marvin aluminum clad wood to match (e) styl, dimension and profile. retain (e) sill , trim and frame. | $4,500 |
| Nov 16, 2015 | Completed final sign-off Jun 2020 | 290 Day St | complete interior remodel of first and second floors. overall height increate and exterior remodel.Details
complete interior remodel of first and second floors. overall height increate and exterior remodel. | $150,000 |
| Nov 16, 2015 | Completed final sign-off May 2020 | 1647 Sanchez St | vertical two story addition.remodel single family dwelling, remodel garage for 1 car parking, new type i bike parking, new street trees.Details
vertical two story addition.remodel single family dwelling, remodel garage for 1 car parking, new type i bike parking, new street trees. | $300,000 |
| Oct 29, 2015 | Completed final sign-off Apr 2016 | 33 Miguel St | construct two (n) retaining wallsDetails
construct two (n) retaining walls | $30,000 |
| May 1, 2015 | Completed final sign-off Oct 2015 | 1825 Scott St | revision to 2013 0513 6729; kitchen and room layout at lower level revised interior stair removed, some window sizes changedDetails
revision to 2013 0513 6729; kitchen and room layout at lower level revised interior stair removed, some window sizes changed | |
| May 1, 2015 | Completed final sign-off Oct 2015 | 1827 Scott St | revision to 2013 0513 6725; minor floor plan changes to each floor. some windows revised in sizeDetails
revision to 2013 0513 6725; minor floor plan changes to each floor. some windows revised in size | |
| Jan 8, 2015 | Completed final sign-off Jun 2015 | 1865 Greenwich St | revision to pa# 2012-0202-3456 and pa# 2014-0911-6092. addition of roof deck, accessed by stair from fourth floor and roof hatch.Details
revision to pa# 2012-0202-3456 and pa# 2014-0911-6092. addition of roof deck, accessed by stair from fourth floor and roof hatch. | $8,000 |
| Sep 11, 2014 | Completed final sign-off Jun 2015 | 1865 Greenwich St | revision to app#201202023456. interior changes, relocation of windows.Details
revision to app#201202023456. interior changes, relocation of windows. | |
| Mar 4, 2014 | Completed final sign-off Jul 2014 | 152 Elsie St | revision to 200310066599. modify approved layout for single family dwelling. add wet bar at lower level. infill floor area. relocate bathrooms and kitchen. reconfigure windows.Details
revision to 200310066599. modify approved layout for single family dwelling. add wet bar at lower level. infill floor area. relocate bathrooms and kitchen. reconfigure windows. | $5,000 |
| Dec 20, 2013 | Completed final sign-off Oct 2015 | 1827 Scott St | replace foundation.Details
replace foundation. | $100,000 |
| Dec 20, 2013 | Completed final sign-off Oct 2015 | 1825 Scott St | replace foundation.Details
replace foundation. | $100,000 |
| May 13, 2013 | Completed final sign-off Oct 2015 | 1827 Scott St | convert ground floor storage space to living space renovate kitchen, new partial 3rd story additionDetails
convert ground floor storage space to living space renovate kitchen, new partial 3rd story addition | $90,000 |
| May 13, 2013 | Completed final sign-off Oct 2015 | 1825 Scott St | conduct ground floor storage space to apartment renovate kitchen in main unit, new partial 3rd storyDetails
conduct ground floor storage space to apartment renovate kitchen in main unit, new partial 3rd story | $90,000 |
| Jan 11, 2013 | Completed final sign-off Mar 2013 | 69 Chattanooga St | revision to pa#2010-09-03-0242. structural framing revisions to sheets s1.1, s1.2, s1.3Details
revision to pa#2010-09-03-0242. structural framing revisions to sheets s1.1, s1.2, s1.3 | |
| Sep 14, 2012 | Completed final sign-off Mar 2013 | 69 Chattanooga St | install new fire sprinker system through-out building to nfpa 13 with new 2" combination fire service.Details
install new fire sprinker system through-out building to nfpa 13 with new 2" combination fire service. | $3,000 |
| Aug 20, 2012 | Completed final sign-off Oct 2012 | 1295 Church St | remodel (e) bathroom in kind.Details
remodel (e) bathroom in kind. | $9,037 |
| Jun 21, 2012 | Completed final sign-off Dec 2013 | 55 Jordan Av | remove & replace the raised portion of the (e) garage slabDetails
remove & replace the raised portion of the (e) garage slab | $8,500 |
| Feb 2, 2012 | Completed final sign-off Jun 2015 | 1865 Greenwich St | expansion of basement / garage, horizontal & vertical addition. interior remodel.Details
expansion of basement / garage, horizontal & vertical addition. interior remodel. | $550,000 |
| Dec 15, 2011 | Completed final sign-off Mar 2013 | 69 Chattanooga St | revision to appl #201009030242: add special inspection for shotcrete.Details
revision to appl #201009030242: add special inspection for shotcrete. | |
| Aug 8, 2011 | Completed final sign-off Oct 2012 | 1295 Church St | replace & upgrade partial foundation at ground floor residential unit.Details
replace & upgrade partial foundation at ground floor residential unit. | $10,000 |
| Mar 18, 2011 | Completed final sign-off Oct 2011 | 2147 18th Av | demo center patio, re support roof joists with new beams, remove & repl dry -rot framing at skylightDetails
demo center patio, re support roof joists with new beams, remove & repl dry -rot framing at skylight | $10,000 |
| Mar 2, 2011 | Completed final sign-off Aug 2011 | 45 Chattanooga St | raise perimeter concrete foundation at north wall to corretct earth wood contact condition, fasten 1st floor posts and beam with bolted plate connectorsDetails
raise perimeter concrete foundation at north wall to corretct earth wood contact condition, fasten 1st floor posts and beam with bolted plate connectors | $15,000 |
| Sep 3, 2010 | Never finaled issued May 2011, no final | 69 Chattanooga St | horizontal & vertical additoin and interior remodel to (e) single family residence to convert 2 story residence into a 4 story single family residence.Details
horizontal & vertical additoin and interior remodel to (e) single family residence to convert 2 story residence into a 4 story single family residence. | $600,000 |
| Jul 27, 2010 | Completed final sign-off Jul 2011 | 218 Chenery St | new elevator addition in n.e. side of yard, removal & infill of (e) light court, new windows along n.e. side of building.Details
new elevator addition in n.e. side of yard, removal & infill of (e) light court, new windows along n.e. side of building. | $15,000 |
| Apr 28, 2010 | Completed final sign-off Oct 2017 | 368 Prentiss St | horizontal & vertical addition at rear & garage below (e) dwelling. remodel (e) single family residence, create new garage.Details
horizontal & vertical addition at rear & garage below (e) dwelling. remodel (e) single family residence, create new garage. | $125,000 |
| Oct 27, 2009 | Completed final sign-off Feb 2011 | 457 Buena Vista East Av | revision to application 200805162250 to propose shear walls in lieu of moment frames, alternating tread device for access to roof in lieu of roof hatch. change material at front facade and reduce window sizes to accomodate shear walls. floor framing changesDetails
revision to application 200805162250 to propose shear walls in lieu of moment frames, alternating tread device for access to roof in lieu of roof hatch. change material at front facade and reduce window sizes to accomodate shear walls. floor framing changes | |
| Jun 19, 2008 | Completed final sign-off Oct 2009 | 369 Prentiss St | revision to appl #2006121498478 to revise foundation wall detail.Details
revision to appl #2006121498478 to revise foundation wall detail. | |
| Sep 13, 2004 | Never finaled issued Sep 2004, no final | 79 Chattanooga St | remove existing non conforming kitchen area, & remove existing bath in (e) toilet room-both at grndDetails
remove existing non conforming kitchen area, & remove existing bath in (e) toilet room-both at grnd | $2,000 |