Hydra Ventures Inc./ Cal Pac Plumb. Syst
- Based in
- Brisbane
- On San Francisco permits
- Feb 2018 to Sep 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2022 | Completed final sign-off Feb 2023 | 4753 Mission St | abc license from type 47 to type 48. flooring, paint (interior) wall paper. no change in building code use or occupancy. all walls to remain all (e) equipment to remain. proposed work is cosmetic work that does not affect items regulated by the building code.Details
abc license from type 47 to type 48. flooring, paint (interior) wall paper. no change in building code use or occupancy. all walls to remain all (e) equipment to remain. proposed work is cosmetic work that does not affect items regulated by the building code. | $30,000 |
| Oct 25, 2019 | Completed final sign-off Sep 2021 | 1140 Harrison St | plumbing storm control plan review.Details
plumbing storm control plan review. | |
| Apr 25, 2019 | Completed final sign-off Apr 2021 | 49 South Van Ness Av | storm water control plan - plumbing plan checkDetails
storm water control plan - plumbing plan check | |
| Aug 8, 2018 | Completed final sign-off Aug 2020 | 210 Arkansas St | pid to review scp for new multi-story mid-rise apartment. ref pa #2016-0301-0904.Details
pid to review scp for new multi-story mid-rise apartment. ref pa #2016-0301-0904. | |
| Aug 8, 2018 | Completed final sign-off Mar 2021 | 1601 Mariposa St | pid to review scp for this ref app #2016-0303-1058. new multi-story mid-rise apartment.Details
pid to review scp for this ref app #2016-0303-1058. new multi-story mid-rise apartment. | |
| Apr 24, 2018 | Completed final sign-off Jun 2021 | 875 California St | for pid to review the stormwater control plan to a new multi-story mid-rise condo. ref to 2016-0309-1627 s3. maher n/aDetails
for pid to review the stormwater control plan to a new multi-story mid-rise condo. ref to 2016-0309-1627 s3. maher n/a | |
| Feb 20, 2018 | Completed final sign-off Apr 2019 | 1301 Turk St | underground fire supply from city to fire riser maher na overhead sprinkler permit was issued under pa # 2015-0619-9453/s-3Details
underground fire supply from city to fire riser maher na overhead sprinkler permit was issued under pa # 2015-0619-9453/s-3 | $5,000 |