Huynh's Construction Co
- Based in
- Concord
- On San Francisco permits
- Oct 2014 to Dec 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2018 | Completed final sign-off Apr 2019 | 779 18th Av | kitchen and bath remodel in-kindDetails
kitchen and bath remodel in-kind | $100,000 |
| Nov 5, 2018 | Completed final sign-off Jan 2019 | 72 Lippard Av | in kind bathroom remodelDetails
in kind bathroom remodel | $30,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 970 Guerrero St | remove 6 non-historic dh sashes, replace failed dual glazing, and re-install sashes in historic frames. repair per pc section 1005. repair 2 pocket doorsDetails
remove 6 non-historic dh sashes, replace failed dual glazing, and re-install sashes in historic frames. repair per pc section 1005. repair 2 pocket doors | $25,000 |
| Apr 11, 2018 | Completed final sign-off Jul 2018 | 62 Idora Av | remodel kitchen remove old cabinets, tiles and appliances and install all new materials. in kind kitchen remodel.Details
remodel kitchen remove old cabinets, tiles and appliances and install all new materials. in kind kitchen remodel. | $17,000 |
| Sep 16, 2016 | Completed final sign-off Mar 2017 | 846 44th Av | remodel of (e) kitchen and bathroom. all fixtures to remain in same locationDetails
remodel of (e) kitchen and bathroom. all fixtures to remain in same location | $33,000 |
| Aug 5, 2015 | Completed final sign-off Oct 2015 | 27 Mallorca Wy | remodel 1 bath, 1 half bath and paint, replace existing deck doorDetails
remodel 1 bath, 1 half bath and paint, replace existing deck door | $30,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 120 Stanyan St | remodel 2 bathrooms and change 4 windows on the top level, front of the building.Details
remodel 2 bathrooms and change 4 windows on the top level, front of the building. | $20,000 |