Hutan Construction
- Based in
- Oakland
- On San Francisco permits
- Mar 2018 to Nov 2022
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 29, 2022 | Completed final sign-off Mar 2023 | 74 Levant St | revision to pa# 202203170190. replace 200 sqft front wood siding in-kind(replace 200sq ft, not 2500 sq ft).Details
revision to pa# 202203170190. replace 200 sqft front wood siding in-kind(replace 200sq ft, not 2500 sq ft). | |
| Jul 19, 2022 | Completed final sign-off Nov 2022 | 1355 Monterey Bl | valuation to job valuation from $200,000 to $350,000 per inspector to permit #202012301936 amd #202112275042.Details
valuation to job valuation from $200,000 to $350,000 per inspector to permit #202012301936 amd #202112275042. | $150,000 |
| Apr 21, 2022 | Completed final sign-off Apr 2022 | 10 Brewster St | replace existing exterior siding, finish to stucco. to comply with complaint #202181154Details
replace existing exterior siding, finish to stucco. to comply with complaint #202181154 | $2,000 |
| Mar 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1355 Monterey Bl | reroofing.Details
reroofing. | $15,000 |
| Mar 17, 2022 | Completed final sign-off Mar 2023 | 74 Levant St | replace front wood shingle siding to hardie shingle siding. repair rotted siding on the side and rear. approx 2500 sqftDetails
replace front wood shingle siding to hardie shingle siding. repair rotted siding on the side and rear. approx 2500 sqft | $15,000 |
| Mar 14, 2022 | Completed final sign-off Dec 2022 | 2968 23rd St | 1/f: new bedroom #b, bath, family rm, wet-bar, laundry rm and stair. new barn door, new low deck. 2/f: remodel existing bedroom to master room with new master bath. remodel existing kitchen and bathroom. infill lightwell, new stair. demo rear shedDetails
1/f: new bedroom #b, bath, family rm, wet-bar, laundry rm and stair. new barn door, new low deck. 2/f: remodel existing bedroom to master room with new master bath. remodel existing kitchen and bathroom. infill lightwell, new stair. demo rear shed | $100,000 |
| Jan 10, 2022 | Expired or cancelled cancelled May 2024 | 2229 Webster St | new foundation and voluntary seismic retrofit. new interior renovations second and third floors. new partitions, new millwork, new fixtures.Details
new foundation and voluntary seismic retrofit. new interior renovations second and third floors. new partitions, new millwork, new fixtures. | $360,000 |
| Dec 27, 2021 | Completed final sign-off Nov 2022 | 1355 Monterey Bl | revision to bpa #2020/1230/1936,structural work.Details
revision to bpa #2020/1230/1936,structural work. | |
| Jul 2, 2021 | Completed final sign-off Mar 2022 | 201 Girard St | add a 2nd unit: convert at 1st floor to livng space:install new furnace and water heater.Details
add a 2nd unit: convert at 1st floor to livng space:install new furnace and water heater. | $39,000 |
| Jun 16, 2021 | Completed final sign-off May 2025 | 316 Laurel St | bsmt - add 1 office, 1 bedrm, 1 (3) fixture bathrm, 1 powdrm, laundry w/sink, 1 entertainment rm; elevator replace in-kind; 1st fl - reconfig int layout. include foyer, livingrm, library, kitchen, dining, wet bar & fam rm. alter front entrance & stair. replace skylight @ fam rm; 2nd fl - reconfigDetails
bsmt - add 1 office, 1 bedrm, 1 (3) fixture bathrm, 1 powdrm, laundry w/sink, 1 entertainment rm; elevator replace in-kind; 1st fl - reconfig int layout. include foyer, livingrm, library, kitchen, dining, wet bar & fam rm. alter front entrance & stair. replace skylight @ fam rm; 2nd fl - reconfig | $100,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2022 | 74 Levant St | replace 8 windows in kind. some windows are street facing. u factor 0.30 maxDetails
replace 8 windows in kind. some windows are street facing. u factor 0.30 max | $8,000 |
| Jun 3, 2021 | Completed final sign-off Oct 2022 | 74 Levant St | in kind kitchen remodel. in kind two bathroom remodel. repairing deck and stairs dry rot at rear. under 50 % repair balconey at 2nd floor and dry rotDetails
in kind kitchen remodel. in kind two bathroom remodel. repairing deck and stairs dry rot at rear. under 50 % repair balconey at 2nd floor and dry rot | $35,000 |
| Mar 31, 2021 | Completed final sign-off Aug 2021 | 201 Girard St | re-roofingDetails
re-roofing | $10,000 |
| Mar 31, 2021 | Completed final sign-off Mar 2022 | 201 Girard St | window replacement (18 windows) 6 front facing. 2 bathroom and kitchen renovation. replace furnace. on girard and felton street - wood hung with aluminum cladding - no sliders allowed.Details
window replacement (18 windows) 6 front facing. 2 bathroom and kitchen renovation. replace furnace. on girard and felton street - wood hung with aluminum cladding - no sliders allowed. | $35,000 |
| Mar 26, 2021 | Completed final sign-off Jul 2021 | 2625 Yorba St | remodel 1 kitchen and 2 bathroom. replace 9 windows in-kind (street facing). comply w/ nov 2021745487 at the front wood interior aluminum clad exterior windows. no works in basementDetails
remodel 1 kitchen and 2 bathroom. replace 9 windows in-kind (street facing). comply w/ nov 2021745487 at the front wood interior aluminum clad exterior windows. no works in basement | $15,000 |
| Dec 30, 2020 | Completed final sign-off Nov 2022 | 1355 Monterey Bl | convert 353 s.f of existing garage to living space. rebuild interior stair to basement, interior remodel of kitchen, powder room, laundry and bathrooms. replce existing windows in kind.Details
convert 353 s.f of existing garage to living space. rebuild interior stair to basement, interior remodel of kitchen, powder room, laundry and bathrooms. replce existing windows in kind. | $120,000 |
| Mar 27, 2018 | Completed final sign-off Nov 2024 | 1910 Baker St | 3 units residential remodel to include: front & rear horizontal addition with deck. 3rd story vertical addition with roof deck above. interior remodel with unit reconfiguration & associated structural work with proposed additions. 3 new baths, 1 new powder room, 3 new bedrooms. sprinkler separate.Details
3 units residential remodel to include: front & rear horizontal addition with deck. 3rd story vertical addition with roof deck above. interior remodel with unit reconfiguration & associated structural work with proposed additions. 3 new baths, 1 new powder room, 3 new bedrooms. sprinkler separate. | $535,000 |