Hui Construction
- Based in
- Burlingame
- On San Francisco permits
- Aug 2014 to Mar 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2015 | Completed final sign-off Jun 2015 | 1725 21st Av | replace kitchen cabinets, countertop, drawers, sink; replace 3 kitchen doors, add 5 electrical outlets, 6 lights. to comply with cec150.0(k)3Details
replace kitchen cabinets, countertop, drawers, sink; replace 3 kitchen doors, add 5 electrical outlets, 6 lights. to comply with cec150.0(k)3 | $2,500 |
| Feb 27, 2015 | Completed final sign-off Aug 2016 | 2125 20th Av | add 3 bedrooms, 2 bathrooms, 1 entertainment and 1 mudroom on 1st floor, add stairs at rear per plan.no extension to building envelope new stair not to exceed 8'Details
add 3 bedrooms, 2 bathrooms, 1 entertainment and 1 mudroom on 1st floor, add stairs at rear per plan.no extension to building envelope new stair not to exceed 8' | $50,000 |
| Feb 6, 2015 | Completed final sign-off Feb 2016 | 441 Judah St | legalize as-build kitchen, bedroom and living room on 1st fl as 3rd unit per plan. entire building to be sprinklered per nfpa 13-r under separate permit. no expansion or addition work. unit legalization ord 43-14.Details
legalize as-build kitchen, bedroom and living room on 1st fl as 3rd unit per plan. entire building to be sprinklered per nfpa 13-r under separate permit. no expansion or addition work. unit legalization ord 43-14. | $30,000 |
| Sep 3, 2014 | Completed final sign-off Jul 2015 | 2844 Ulloa St | revision to appl. 2014.0819.4188. add work to remodel kitchen and bathroom on 2nd floor per plan. relocate skylight per plan and show correct (e) skylights on 2nd floor plan.Details
revision to appl. 2014.0819.4188. add work to remodel kitchen and bathroom on 2nd floor per plan. relocate skylight per plan and show correct (e) skylights on 2nd floor plan. | $20,000 |
| Aug 19, 2014 | Completed final sign-off Jul 2015 | 2844 Ulloa St | (n) rear deck and 1)add 2 bedrooms, 2 bathrooms, mud room, utility room on 1st floor per plan. 2) add rear deck on 2nd floor per plan. 3)add the skylight on 2nd floor per plan.Details
(n) rear deck and 1)add 2 bedrooms, 2 bathrooms, mud room, utility room on 1st floor per plan. 2) add rear deck on 2nd floor per plan. 3)add the skylight on 2nd floor per plan. | $40,000 |