Hubeymar Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2021 to Sep 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2024 | Completed final sign-off Aug 2025 | 785 Page St | replacement of (e) concrete retaining wall currently buckling with the potential of collapse. new design includes new footings, concrete stem wall, with a 6'0" privacy fence to match existing conditions.Details
replacement of (e) concrete retaining wall currently buckling with the potential of collapse. new design includes new footings, concrete stem wall, with a 6'0" privacy fence to match existing conditions. | $24,000 |
| Jan 21, 2021 | Completed final sign-off Feb 2021 | 86 San Jose Av | repair wood and stucco caused by car into building. comply w/ nov 202172078. garage front on the side of door.Details
repair wood and stucco caused by car into building. comply w/ nov 202172078. garage front on the side of door. | $4,000 |