Huawell Construction Development Group I

Contractor license
1024653
State license record
Based in
San Jose
On San Francisco permits
Mar 2018 to Mar 2019
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 18, 2019Completed
final sign-off Sep 2019
212 Silliman Strepair/replace damaged wood and stucco on side facade. replace 2nd and 3rd floor front windows (3 total) with aluminum-clad wood, triple casement windows in same rough opening. in-kind replacement of roof and repair/replace portion of rear wall that has dry rot.
Details
Permit
201903185576
Status
complete
Filed
Mar 18, 2019
Permit issued
Mar 18, 2019
Final sign-off
Sep 4, 2019
Declared cost
$17,500
Address
212 Silliman St

repair/replace damaged wood and stucco on side facade. replace 2nd and 3rd floor front windows (3 total) with aluminum-clad wood, triple casement windows in same rough opening. in-kind replacement of roof and repair/replace portion of rear wall that has dry rot.

Open the permit page

$17,500
Mar 12, 2018Completed
final sign-off Dec 2018
245 Jefferson Streconfigure interior layout per plan, relocate bar add two rooms. maher n/a
Details
Permit
201803123427
Status
complete
Filed
Mar 12, 2018
Permit issued
Apr 16, 2018
Final sign-off
Dec 31, 2018
Declared cost
$50,000
Address
245 Jefferson St

reconfigure interior layout per plan, relocate bar add two rooms. maher n/a

Open the permit page

$50,000