Hong Chang Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Feb 2026
- Last 24 months
- 3 permits filed
60 permits since 2000: 53 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 535 Guerrero St | remodel existing kitchen and bathroom in kind. kitchen approx 90 sq ft, bathroom approx 50 sq ft. remove wall plaster for bedroom (2 exterior walls) and insulate and recover with sheetrock. install eletric sub panel for the unit. 5/8" type x sheet rock in kitchen, bathroom and bedroom(2 ext.walls).Details
remodel existing kitchen and bathroom in kind. kitchen approx 90 sq ft, bathroom approx 50 sq ft. remove wall plaster for bedroom (2 exterior walls) and insulate and recover with sheetrock. install eletric sub panel for the unit. 5/8" type x sheet rock in kitchen, bathroom and bedroom(2 ext.walls). | $73,500 |
| Feb 27, 2026 | Completed final sign-off Jul 2026 | 539 Guerrero St | partial kitchen remodel in kind. 7' run of base cabinets with sink, faucet and countertop. replace range hood in kind. install new slow faucet for bathroom. install electrical sub panel for the unit.Details
partial kitchen remodel in kind. 7' run of base cabinets with sink, faucet and countertop. replace range hood in kind. install new slow faucet for bathroom. install electrical sub panel for the unit. | $11,500 |
| Sep 3, 2025 | Completed final sign-off Oct 2025 | 1915 Laguna St | unit 2: remodel existing kitchen (cabinet, countertop, sink, appliance). install new kitchen (cabinet, countertop, sink, appliance, vinyl floor). install one new 50 amp subpanel for kitchen.Details
unit 2: remodel existing kitchen (cabinet, countertop, sink, appliance). install new kitchen (cabinet, countertop, sink, appliance, vinyl floor). install one new 50 amp subpanel for kitchen. | $15,000 |
| Mar 25, 2024 | Completed final sign-off Jul 2024 | 537 Guerrero St | remodel (1) kitchen, (2) bathrooms in the unit. upgrade electrical in kitchen and bathrooms. add electrical outlet in bedrooms. no removal of wallsDetails
remodel (1) kitchen, (2) bathrooms in the unit. upgrade electrical in kitchen and bathrooms. add electrical outlet in bedrooms. no removal of walls | $52,000 |
| Dec 18, 2023 | Completed final sign-off Mar 2024 | 448 12th Av | main bathroom remodeling, install new fan, light sink, tile. install new counter top, sink, faucet. add new 125 amp subpanel for the unit. add electrical receptacles for kitchen. relocate gas furnance in basement. new painting for entire unit.Details
main bathroom remodeling, install new fan, light sink, tile. install new counter top, sink, faucet. add new 125 amp subpanel for the unit. add electrical receptacles for kitchen. relocate gas furnance in basement. new painting for entire unit. | $42,500 |
| Oct 26, 2023 | Completed final sign-off Dec 2023 | 1451 41st Av | fix house front post damaged by a car accident. in kind repair material to match existingDetails
fix house front post damaged by a car accident. in kind repair material to match existing | $3,200 |
| Jan 31, 2022 | Completed final sign-off Apr 2022 | 179 Teddy Av | replace dryrot in backyard sunroom and fix leaking. change (4) window in backyard and sunroom in-kind.Details
replace dryrot in backyard sunroom and fix leaking. change (4) window in backyard and sunroom in-kind. | $6,800 |
| Jun 17, 2021 | Completed final sign-off Jan 2022 | 50 Morningside Dr | remodel (1) kitchen & 1 bathroom on 2/f. including plumbing & electrical.Details
remodel (1) kitchen & 1 bathroom on 2/f. including plumbing & electrical. | $35,000 |
| Feb 24, 2020 | Completed final sign-off Mar 2020 | 460 Brussels St | remodle kitchen, 1 full bathroom at second floor. comply with complaint # 202012331 and 202012341Details
remodle kitchen, 1 full bathroom at second floor. comply with complaint # 202012331 and 202012341 | $22,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2020 | 143 Gaven St | construct 2 bedroom, 2 full baths @ ground floor; relocate (e) kitchen, remodel (e) bath room. add 1 new bathroom and convert (e) dining room to bedroom @ 2nd flDetails
construct 2 bedroom, 2 full baths @ ground floor; relocate (e) kitchen, remodel (e) bath room. add 1 new bathroom and convert (e) dining room to bedroom @ 2nd fl | $135,000 |
| Mar 12, 2019 | Completed final sign-off Nov 2019 | 173 Ellington Av | construct 1 bedroom, 2 bathrooms, family room & media room @ ground floor; remodel (e) bathroom & add 1 new bath room @ 2nd floor; replace partial (e) foundation w/newDetails
construct 1 bedroom, 2 bathrooms, family room & media room @ ground floor; remodel (e) bathroom & add 1 new bath room @ 2nd floor; replace partial (e) foundation w/new | $89,000 |
| Feb 26, 2019 | Expired or cancelled expired Nov 2024 | 1269 09th Av | replace ceiling sheetrock in dining area. painting entire restaurant (walls and ceilings).Details
replace ceiling sheetrock in dining area. painting entire restaurant (walls and ceilings). | $12,000 |
| Oct 24, 2018 | Completed final sign-off Jan 2019 | 1998 Pacific Av | remove bathroom bath tub, washer machine, double sink, toilet, wall tile, floor tile. install new bath tub, washer machine, double vanity cabinet with sink, toilet, new floor tile, wall tile. 5 cieling lights & new painting. 6'x'10 = 60sf.Details
remove bathroom bath tub, washer machine, double sink, toilet, wall tile, floor tile. install new bath tub, washer machine, double vanity cabinet with sink, toilet, new floor tile, wall tile. 5 cieling lights & new painting. 6'x'10 = 60sf. | $14,500 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 187 Stanyan St | remove existing kitchen cabinets, tile, countertop, plumbing fixtures, and appliances. install new kitchen cabinets, countertop, sink, faucet, lighting fixtures for ceiling, electrical outlets, new hardwood floor. kitchen size: 10' x 12'Details
remove existing kitchen cabinets, tile, countertop, plumbing fixtures, and appliances. install new kitchen cabinets, countertop, sink, faucet, lighting fixtures for ceiling, electrical outlets, new hardwood floor. kitchen size: 10' x 12' | $11,500 |
| Mar 1, 2018 | Completed final sign-off Apr 2018 | 1801 Diamond St | remdel (e) 1 bathroom, shower, toilet, sink, install new shower, toilet, sink, new wall/floor tile, new exhaust ceiling fanDetails
remdel (e) 1 bathroom, shower, toilet, sink, install new shower, toilet, sink, new wall/floor tile, new exhaust ceiling fan | $9,500 |
| Jun 12, 2017 | Completed final sign-off Oct 2017 | 33 Lisbon St | comply with nov 201783831, dated 6/17/2017. replace garage door.Details
comply with nov 201783831, dated 6/17/2017. replace garage door. | $1,200 |
| Mar 17, 2017 | Completed final sign-off May 2017 | 33 Lisbon St | remove existing windows. install new replacement windows for entire house. repair 40 sf of stucco for the front. comply with complaint #201767171.Details
remove existing windows. install new replacement windows for entire house. repair 40 sf of stucco for the front. comply with complaint #201767171. | $2,500 |
| Dec 30, 2016 | Completed final sign-off Jul 2019 | 33 Lisbon St | per ordinance #162-16. add dwelling unit to (e) single family dwelling unit.Details
per ordinance #162-16. add dwelling unit to (e) single family dwelling unit. | $30,000 |
| Dec 23, 2016 | Completed final sign-off May 2017 | 33 Lisbon St | alter (e) 2nd flr - remodel (e) kitchen, bathroom and dining room. remove walls between kitchen and dining rm and utility rm, add new bathroom . replace w/h & furnaceDetails
alter (e) 2nd flr - remodel (e) kitchen, bathroom and dining room. remove walls between kitchen and dining rm and utility rm, add new bathroom . replace w/h & furnace | $30,000 |
| Oct 24, 2016 | Completed final sign-off Nov 2016 | 1905 Fillmore St | lighting fixtures for title 24. ref app#201603041269. n/a for maherDetails
lighting fixtures for title 24. ref app#201603041269. n/a for maher | |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 1905 Fillmore St | change of use only. change use to "formula retail" apparel sales - 45rpm. dcp case no. 2015-015784 cua. tenants improvement work.Details
change of use only. change use to "formula retail" apparel sales - 45rpm. dcp case no. 2015-015784 cua. tenants improvement work. | |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 271 Moscow St | replace new floor tile and wall tiles in kitchen & 1 bathroom ; replace 2 new vinyl windows in back yard wall, install new hardwood floor for enitre house, painting entire house.Details
replace new floor tile and wall tiles in kitchen & 1 bathroom ; replace 2 new vinyl windows in back yard wall, install new hardwood floor for enitre house, painting entire house. | $17,500 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 229 Saint Charles Av | 1. legalize bedroom, bath. construct one new bedroom and storage at ground floor. 2. construct new deck with staircase at rear of building. size approx. 15'x7'Details
1. legalize bedroom, bath. construct one new bedroom and storage at ground floor. 2. construct new deck with staircase at rear of building. size approx. 15'x7' | $32,000 |
| Apr 4, 2014 | Completed final sign-off Aug 2014 | 3623 Cabrillo St | replace (e) siding on 3rd floor & replace (e0 stucco on 1st & 2nd floor in kind. at front & side & back.Details
replace (e) siding on 3rd floor & replace (e0 stucco on 1st & 2nd floor in kind. at front & side & back. | $3,000 |
| Nov 15, 2013 | Completed final sign-off May 2014 | 211 Clement St | revision to appl #2013.09.26.7784: delete new steel channels & posts support w/conc. footing from plan due to existing wood beam does not exist. delete steel welding form special inspection.Details
revision to appl #2013.09.26.7784: delete new steel channels & posts support w/conc. footing from plan due to existing wood beam does not exist. delete steel welding form special inspection. | |
| Oct 24, 2013 | Never finaled issued Dec 2013, no final | 763 30th Av | revision to bpa#2013-1003-8442. convert (n) family room to storage room at first floor.Details
revision to bpa#2013-1003-8442. convert (n) family room to storage room at first floor. | |
| Oct 24, 2013 | Completed final sign-off Aug 2014 | 3625 Cabrillo St | revision to bpa#2013-0823-5142. reconfigure bathrooms, laundry room & bedroom at 2/f & 3/f. add 3 bedrooms, 2 bathrooms, & entertainment room at 1/f. replace (e) windows at front of building w/fiberglass clad. replace (e) foundation at rear & side of building. (n) electrical wall heater.Details
revision to bpa#2013-0823-5142. reconfigure bathrooms, laundry room & bedroom at 2/f & 3/f. add 3 bedrooms, 2 bathrooms, & entertainment room at 1/f. replace (e) windows at front of building w/fiberglass clad. replace (e) foundation at rear & side of building. (n) electrical wall heater. | $38,000 |
| Oct 23, 2013 | Completed final sign-off Mar 2014 | 3232 16th St | to erect non electrical sign for restaurant.Details
to erect non electrical sign for restaurant. | $1,200 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 763 30th Av | add new 2 bedrooms, media room and bathroom at 1st floor. remodel extg laundry area at 1st floor.Details
add new 2 bedrooms, media room and bathroom at 1st floor. remodel extg laundry area at 1st floor. | $28,000 |
| Aug 23, 2013 | Never finaled issued Aug 2013, no final | 3623 Cabrillo St | reconfigure extg bathroom at 2nd floors per plan. remodel and relocate extg kitchen at 2nd and 3rd floor. new furnace and washer/dryer machine at 3rd floor. new master suite at 3rd floor. remodel extg bath at 3rd floor. replace extg window at rear and siding of bldg.Details
reconfigure extg bathroom at 2nd floors per plan. remodel and relocate extg kitchen at 2nd and 3rd floor. new furnace and washer/dryer machine at 3rd floor. new master suite at 3rd floor. remodel extg bath at 3rd floor. replace extg window at rear and siding of bldg. | $130,000 |
| Jul 5, 2013 | Completed final sign-off Feb 2014 | 866 Sutter St | to comply with nov#201301161. to remove illegal stairway connecting between commercial & residential use.Details
to comply with nov#201301161. to remove illegal stairway connecting between commercial & residential use. | $2,000 |
| Feb 20, 2013 | Completed final sign-off Jul 2013 | 408 Dellbrook Av | proposed construction of 1 new full bath on 1st floor and relocate existing furnace and water heaterDetails
proposed construction of 1 new full bath on 1st floor and relocate existing furnace and water heater | $10,000 |
| Jan 18, 2013 | Completed final sign-off Nov 2013 | 151 Everglade Dr | revision to pa#2012-11-01-3360. replace wood beam posts beams to steel beam.Details
revision to pa#2012-11-01-3360. replace wood beam posts beams to steel beam. | |
| Nov 1, 2012 | Completed final sign-off Nov 2013 | 151 Everglade Dr | new deck at rear side of bldgDetails
new deck at rear side of bldg | $6,000 |
| Sep 5, 2012 | Completed final sign-off Nov 2013 | 151 Everglade Dr | add new bedroom and family room at 1st floor. legalize (e) bathroom and laundry room at 1st floor. remodel (e) master bathroom & kitchen at 2nd floor. add new bathroom at 2nd floor as per plan. replace window thru house, replace front window w/wood window, repair stucco at side fo bldg approx 100 sfDetails
add new bedroom and family room at 1st floor. legalize (e) bathroom and laundry room at 1st floor. remodel (e) master bathroom & kitchen at 2nd floor. add new bathroom at 2nd floor as per plan. replace window thru house, replace front window w/wood window, repair stucco at side fo bldg approx 100 sf | $46,000 |
| Dec 14, 2011 | Completed final sign-off Aug 2012 | 137 Lakeview Av | remodel two bathrooms & one kitchen. remove (e) plaster at walls of two bedrms, living rm & dinning rm w/n) 5/8" sheetrock nailed w/6d cooler nails @6"o.c. at edges, install insulation. use 5/8" type x gyp bd at exterior wall. approx. 600 sf of wall area. no wall relocation.Details
remodel two bathrooms & one kitchen. remove (e) plaster at walls of two bedrms, living rm & dinning rm w/n) 5/8" sheetrock nailed w/6d cooler nails @6"o.c. at edges, install insulation. use 5/8" type x gyp bd at exterior wall. approx. 600 sf of wall area. no wall relocation. | $20,000 |
| Nov 1, 2010 | Completed final sign-off Mar 2011 | 60 Meadowbrook Dr | add new bedrooms, bathrooms, and storage at first floor.Details
add new bedrooms, bathrooms, and storage at first floor. | $45,000 |
| Jun 11, 2010 | Completed final sign-off Mar 2011 | 265 Peabody St | remodel existing bathroom, repl new floor, wall tile, replace bath tub sink toilet, replace existing alum with rear window 3 vinyl double glass windowDetails
remodel existing bathroom, repl new floor, wall tile, replace bath tub sink toilet, replace existing alum with rear window 3 vinyl double glass window | $4,000 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 2710 Webster St | install new cabinets in kitchen & counter top, install new wall tile & floor tile in bathroom, patch living room cracks & paint. no new lightingDetails
install new cabinets in kitchen & counter top, install new wall tile & floor tile in bathroom, patch living room cracks & paint. no new lighting | $9,964 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 1673 18th Av | remove old cabinets in kitchen, install new kitchen cabinets & counter top. new tile floor, painting. no new lighting, replace 2 ceiling lights al least 50% high efficacy lighting by wattageDetails
remove old cabinets in kitchen, install new kitchen cabinets & counter top. new tile floor, painting. no new lighting, replace 2 ceiling lights al least 50% high efficacy lighting by wattage | $8,736 |
| May 3, 2010 | Never finaled issued May 2010, no final | 563 15th Av | insert permeation grouting (25' long) under blog to prepare it for underpining.Details
insert permeation grouting (25' long) under blog to prepare it for underpining. | $3,500 |
| Jan 22, 2010 | Completed final sign-off May 2010 | 2223 42nd Av | legalize (e) master bedroom & bathroom at 1st floor (garage)Details
legalize (e) master bedroom & bathroom at 1st floor (garage) | $20,000 |
| Dec 31, 2009 | Completed final sign-off May 2010 | 63 Shawnee Av | add new bedrooms and baths at 1st floorDetails
add new bedrooms and baths at 1st floor | $48,000 |
| Sep 24, 2009 | Completed final sign-off Jan 2010 | 1250 33rd Av | upgrade (e) play room to bedroom w/full bathroom & construct staircase from 2nd floor to ground floor at rear of bldg. replace (e) siding w/new at rear of bldg.Details
upgrade (e) play room to bedroom w/full bathroom & construct staircase from 2nd floor to ground floor at rear of bldg. replace (e) siding w/new at rear of bldg. | $28,000 |
| Aug 27, 2009 | Completed final sign-off Nov 2009 | 1246 25th Av | remodel (e) bathroom & kitchen on second floor. add new half bath on second floor. legalize existing family room and bathroom on first floor. add 150 sq. ft. new family room at first floor. replace 4 rear windows at 1st and 2nd floors, and replace front window in-kind.Details
remodel (e) bathroom & kitchen on second floor. add new half bath on second floor. legalize existing family room and bathroom on first floor. add 150 sq. ft. new family room at first floor. replace 4 rear windows at 1st and 2nd floors, and replace front window in-kind. | $20,000 |
| May 21, 2009 | Completed final sign-off Aug 2009 | 801 Pacheco St | remodel existing kitchen & bathroom on second, add new bedroom & bathroom on first floor, replace all windows in kind.Details
remodel existing kitchen & bathroom on second, add new bedroom & bathroom on first floor, replace all windows in kind. | $30,000 |
| Feb 17, 2009 | Completed final sign-off Apr 2009 | 526 29th Av | convert existing dining rom into a new bathrm and closet on second flor, remodel existing kitchen on second floor.Details
convert existing dining rom into a new bathrm and closet on second flor, remodel existing kitchen on second floor. | $16,000 |
| Oct 3, 2008 | Completed final sign-off Dec 2008 | 125 Christopher Dr | divided existing family room into a bedroom with sliding window & a family room; add a bath in existing storage room at ground floor.Details
divided existing family room into a bedroom with sliding window & a family room; add a bath in existing storage room at ground floor. | $15,000 |
| Aug 10, 2007 | Completed final sign-off Mar 2008 | 430 04th Av | add new bathroom at 2nd floor. convert existing bathroom into two bathrooms at 3rd floor.Details
add new bathroom at 2nd floor. convert existing bathroom into two bathrooms at 3rd floor. | $15,000 |
| May 21, 2007 | Completed final sign-off Aug 2007 | 1606 46th Av | revised pa# 200701121602-relocate door and revised bathsDetails
revised pa# 200701121602-relocate door and revised baths | |
| Jun 2, 2006 | Completed final sign-off Jun 2006 | 1582 43rd Av | stucco with total 100 sf at the front, right bottom wndw side 3' under wndw. 8' above wndw replace dryrot apply new stucco, install wndw/replace extg wndw at front same sizeDetails
stucco with total 100 sf at the front, right bottom wndw side 3' under wndw. 8' above wndw replace dryrot apply new stucco, install wndw/replace extg wndw at front same size | $5,300 |
| Apr 24, 2006 | Completed final sign-off Apr 2008 | 130 21st Av | lateral addition to include remodeled kitchen and new powder room.Details
lateral addition to include remodeled kitchen and new powder room. | $38,000 |
| Apr 14, 2006 | Completed final sign-off Jul 2006 | 1507 43rd Av | repair (e) front stair dryrot. patch stucco. less than 50%. add water proofing membrance min 12" up stucco wall.Details
repair (e) front stair dryrot. patch stucco. less than 50%. add water proofing membrance min 12" up stucco wall. | $6,500 |
| Jan 12, 2006 | Never finaled issued Jan 2006, no final | 1422 23rd Av | renew 200508311768, 200503016430 & 200504200493 for final inspection.Details
renew 200508311768, 200503016430 & 200504200493 for final inspection. | |
| Aug 27, 2004 | Completed final sign-off Oct 2004 | 709 42nd Av | remove (e)stucco from wall @ front.put on new water proof paper & metal wire,apply 2 coats of newDetails
remove (e)stucco from wall @ front.put on new water proof paper & metal wire,apply 2 coats of new | $5,200 |
| Oct 6, 2003 | Completed final sign-off Jan 2004 | 53 Van Buren St | dry rot existing peeling siding on west side wall of house. total 250' replace . new siding.Details
dry rot existing peeling siding on west side wall of house. total 250' replace . new siding. | $3,200 |
| Jul 23, 2003 | Completed final sign-off Jul 2003 | 2091 21st Av | replace 4 new vinyl windows in front of houesDetails
replace 4 new vinyl windows in front of houes | $1,200 |
| Jul 2, 2003 | Completed final sign-off Nov 2003 | 3025 Ulloa St | rev. to pa#2003/06/13/7040 - to replace 28 feet of (e) foundationDetails
rev. to pa#2003/06/13/7040 - to replace 28 feet of (e) foundation | |
| Sep 5, 2002 | Completed final sign-off Oct 2002 | 563 38th Av | remove dryrot outside brick &under stair.install granite stair tread,riser&landing.Details
remove dryrot outside brick &under stair.install granite stair tread,riser&landing. | $5,300 |
| Jul 31, 2002 | Completed final sign-off Aug 2002 | 166 Chilton Av | dry rot existing kitchen cabinet. replace new cabinet new stove new counter top new refrigerator.Details
dry rot existing kitchen cabinet. replace new cabinet new stove new counter top new refrigerator. | $2,800 |