Hometech Construction & Design Inc
- Based in
- San Jose
- On San Francisco permits
- May 2018 to Aug 2018
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2018 | Never finaled issued Aug 2018, no final | 401 Cambridge St | concrete slab removal in backyard. replace dry wall in a room in basement & paint. no change on walls.Details
concrete slab removal in backyard. replace dry wall in a room in basement & paint. no change on walls. | $10,000 |
| Jul 11, 2018 | Expired or cancelled cancelled Oct 2018 | 419 Capp St | bathroom remodel. replace tub, tile, toilet, vanity, lights, floor, faucetsDetails
bathroom remodel. replace tub, tile, toilet, vanity, lights, floor, faucets | $10,000 |
| May 30, 2018 | Completed final sign-off Sep 2018 | 1501 Church St | unit 1. kitchen and bathroom remodel - like for like replace cabinets, floor, lights, countertops, tub, vanity, toilets, add recessed lights, upgrade electric panel to 100 ampsDetails
unit 1. kitchen and bathroom remodel - like for like replace cabinets, floor, lights, countertops, tub, vanity, toilets, add recessed lights, upgrade electric panel to 100 amps |