Hillside Construction
- Based in
- Concord
- On San Francisco permits
- Aug 2010 to Sep 2016
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2016 | Completed final sign-off May 2017 | 619 Mississippi St | to comply with complaint 201620772 - replace (e) rear yard retaining wall with new concrete retaining wall.Details
to comply with complaint 201620772 - replace (e) rear yard retaining wall with new concrete retaining wall. | $8,000 |
| Sep 7, 2016 | Expired or cancelled expired Dec 2025 | 1068 De Haro St | to comply with complaint#201405531: kitchen & bathroom remodel,including new electrical & plumbing. in-kind. no changes to walls or addition of walls.Details
to comply with complaint#201405531: kitchen & bathroom remodel,including new electrical & plumbing. in-kind. no changes to walls or addition of walls. | $7,500 |
| Aug 2, 2016 | Completed final sign-off Mar 2018 | 625 Mississippi St | horizontal & vertical addition. new 297 sq.ft. lower fl bedroom/bath addition under(e)deck covert 106 sq.ft. of (e) basement to habitable bath, and laundry room, rebuild 217 sq.ft. deck and reconfigure exterior stair.Details
horizontal & vertical addition. new 297 sq.ft. lower fl bedroom/bath addition under(e)deck covert 106 sq.ft. of (e) basement to habitable bath, and laundry room, rebuild 217 sq.ft. deck and reconfigure exterior stair. | $90,000 |
| Jun 1, 2016 | Completed final sign-off Oct 2016 | 625 Mississippi St | replace appliances in kitchen & bathroom, refinish walls & floor tile, change lighting & cabinetry.Details
replace appliances in kitchen & bathroom, refinish walls & floor tile, change lighting & cabinetry. | $25,000 |
| Dec 23, 2011 | Completed final sign-off May 2012 | 404 Andover St | interior renovation of second floor unit of (e) 2-unit building as follows; renovation of (e) kitchen, (e) bath, (n) bath, responding to nov.#2011616927, dated; 10/6/11.Details
interior renovation of second floor unit of (e) 2-unit building as follows; renovation of (e) kitchen, (e) bath, (n) bath, responding to nov.#2011616927, dated; 10/6/11. | $25,000 |
| Jul 21, 2011 | Completed final sign-off Jul 2012 | 404 Andover St | foundation work incl. replace partial failed concrete ftg., new centerline beam and post at basement level. int. renovation on 1st fl. remodel kitchen, bath room and add new full bathroom. install centerline beam and posts at basement leve.Details
foundation work incl. replace partial failed concrete ftg., new centerline beam and post at basement level. int. renovation on 1st fl. remodel kitchen, bath room and add new full bathroom. install centerline beam and posts at basement leve. | $45,000 |
| Aug 19, 2010 | Never finaled issued Aug 2010, no final | 2200 22nd St | minor revision to 201004160398. recongifure closet, changed office to computer room, widened doorway for computer room, window made egress compliant, skylight in kitchen to remain, laundry skylight added, bath widenedDetails
minor revision to 201004160398. recongifure closet, changed office to computer room, widened doorway for computer room, window made egress compliant, skylight in kitchen to remain, laundry skylight added, bath widened |