Highq Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2023 to Jun 2026
- Last 24 months
- 5 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 2301 Irving St | ti for grocery store. lighting and hvac to remain unchanged. no meps. adjust front entry door operating effort to be 5lb max. replace toilet w/ accessible toilet. provide 2 grab bars in restroom. no plumbing other than toilet replacement.Details
ti for grocery store. lighting and hvac to remain unchanged. no meps. adjust front entry door operating effort to be 5lb max. replace toilet w/ accessible toilet. provide 2 grab bars in restroom. no plumbing other than toilet replacement. | $3,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 738 Shields St | on 2nd floor: kitchen and bathroom remodel, in kind, like to like, interior work onlyDetails
on 2nd floor: kitchen and bathroom remodel, in kind, like to like, interior work only | $3,000 |
| Dec 2, 2025 | Completed final sign-off Feb 2026 | 189 Country Club Dr | lower unit (ground level): bathroom remodel, replace floor tiles, wall tiles, change toilet and vanity, keep bathtub, like for like, no change with plumbing and electrical.Details
lower unit (ground level): bathroom remodel, replace floor tiles, wall tiles, change toilet and vanity, keep bathtub, like for like, no change with plumbing and electrical. | $13,500 |
| Apr 7, 2025 | Completed final sign-off Aug 2025 | 120 Duncan St | level 2 (120 ducan st): relocated kitchen. reconfigure interior walls, new bathroom. replace rear yard facing window (same size), new laundry closet. level 3 (122 ducan st): new bathroom. relocate laundry closet.Details
level 2 (120 ducan st): relocated kitchen. reconfigure interior walls, new bathroom. replace rear yard facing window (same size), new laundry closet. level 3 (122 ducan st): new bathroom. relocate laundry closet. | $130,000 |
| Oct 18, 2024 | Completed final sign-off Dec 2024 | 736 47th Av | stucco repair at front side of the house. approx 300 sf total area.Details
stucco repair at front side of the house. approx 300 sf total area. | $3,800 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 130 Wilson St | construct 2 bedroom, 2 bathroom, office, study room & install kitchenette at g/f. replace partial (e) foundation w/ new.Details
construct 2 bedroom, 2 bathroom, office, study room & install kitchenette at g/f. replace partial (e) foundation w/ new. | $210,000 |
| Jul 11, 2023 | Completed final sign-off Feb 2024 | 130 Wilson St | remodel (e) kitchen, bathroom. construct one new full bathroom & replace sheet rock w/ new at 2/f. construct one new full bathroom & replace sheet rock w/ new at attic space.Details
remodel (e) kitchen, bathroom. construct one new full bathroom & replace sheet rock w/ new at 2/f. construct one new full bathroom & replace sheet rock w/ new at attic space. | $365,000 |