High Q Construction Llc
- Based in
- Dublin
- On San Francisco permits
- Sep 2023 to Nov 2024
- Last 24 months
- 2 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2024 | Completed final sign-off Jan 2025 | 190 08th St | repairing siding by north side of the building. changing wiring to control box and swaping the frame on the control box. less than 5 sq ft.Details
repairing siding by north side of the building. changing wiring to control box and swaping the frame on the control box. less than 5 sq ft. | $2,500 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 43 Norwich St | revision to pa # 202409039959- to have front room not for sleeping purpose & enlarge front street facing windows (44"x 60")Details
revision to pa # 202409039959- to have front room not for sleeping purpose & enlarge front street facing windows (44"x 60") | $16,500 |
| Sep 3, 2024 | In progress issued Sep 2024 | 43 Norwich St | creating/add a single rm. converting 275 sf of e) garage space to new bedroom. add a new street facing window.Details
creating/add a single rm. converting 275 sf of e) garage space to new bedroom. add a new street facing window. | $16,500 |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 43 Norwich St | bathroom remodelingDetails
bathroom remodeling | $26,939 |
| Sep 21, 2023 | Completed final sign-off Mar 2025 | 190 08th St | fire restoration of 1-story building next to 9th street, restore part of roof/framing, sesmic retrofic. no ti; remain vacant, no fire sprinkler/fire alarm. exterior stairway to be restored with material/design to match existing.Details
fire restoration of 1-story building next to 9th street, restore part of roof/framing, sesmic retrofic. no ti; remain vacant, no fire sprinkler/fire alarm. exterior stairway to be restored with material/design to match existing. | $25,000 |