High Level Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Jan 2026
- Last 24 months
- 2 permits filed
44 permits since 2000: 40 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2026 | Completed final sign-off Apr 2026 | 173 Harold Av | 1st fl: add wetbar at (e) playroom and remodel part of (e) garage to new media room with new bathroomDetails
1st fl: add wetbar at (e) playroom and remodel part of (e) garage to new media room with new bathroom | $65,000 |
| Dec 10, 2024 | Completed final sign-off Jul 2025 | 234 Madrid St | new 1-level deck @ rear yard. at 1st floor remodel (e) space to (n) family w/wet bar, (n) laundry, (n) bath and (n) bedroom. adding 807 sqft.Details
new 1-level deck @ rear yard. at 1st floor remodel (e) space to (n) family w/wet bar, (n) laundry, (n) bath and (n) bedroom. adding 807 sqft. | $182,000 |
| Sep 21, 2022 | Completed final sign-off Mar 2023 | 601 Montgomery St | commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbingDetails
commercial tenant improvement to suite 1210 on the 12th fl. scope includes partial demo, new non structural partitions, glazing, doors, ceiling, lighting and finishes. includes associated mech, ele, plumbing | $405,570 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | 4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit.Details
4th fl demo of multiple tenants + construction of new rated common corridor tenant demising walls. new common corridor including non-structural partitions, doors, lighting, ceiling, finishes, rr accessibility upgrades. scope includes mep. t.i.. under separate permit. | $310,155 |
| Dec 1, 2020 | Completed final sign-off Mar 2022 | 601 Montgomery St | 4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep.Details
4th fl conference center: commercial t.i.. demo work under separate permit. construction of new non-structural partitions, glazing, doors, ceiling, lighting, finishes, millwork. includes associated mep. | $289,203 |
| Aug 20, 2019 | Completed final sign-off Jul 2022 | 601 Montgomery St | suite 675: commercial t.i. 6th flr which includes demo of non-structural partitions, doors, casework, lighting, finishes, construction includes non-structural partitions, glazing, doors, lighting, finishes, restrm accessibility upgrades includes mech, elect, & plmg. l/s, fire spk, f/a defrd.Details
suite 675: commercial t.i. 6th flr which includes demo of non-structural partitions, doors, casework, lighting, finishes, construction includes non-structural partitions, glazing, doors, lighting, finishes, restrm accessibility upgrades includes mech, elect, & plmg. l/s, fire spk, f/a defrd. | $320,497 |
| May 11, 2017 | Completed final sign-off Apr 2019 | 500 Sutter St | 2nd floor, spec suite 204 - demolition of non-structural partitions and medical equipments. tenant improvement include construction of non-structural partiions, ceilings, lights & finishes includes accessibility upgrades, mechanical, electrical & plumbing.Details
2nd floor, spec suite 204 - demolition of non-structural partitions and medical equipments. tenant improvement include construction of non-structural partiions, ceilings, lights & finishes includes accessibility upgrades, mechanical, electrical & plumbing. | $182,000 |
| May 11, 2017 | Completed final sign-off Sep 2017 | 500 Sutter St | 2nd floor, spec suite 201 - demolition ofnon-structural partitoins, millwork & medical equipments. tenant improvement include construction of new non-structural partiions, ceilings, lights & finishes includes electrical & plumbing.Details
2nd floor, spec suite 201 - demolition ofnon-structural partitoins, millwork & medical equipments. tenant improvement include construction of new non-structural partiions, ceilings, lights & finishes includes electrical & plumbing. | $71,000 |
| Apr 28, 2017 | Never finaled issued Jun 2017, no final | 601 Montgomery St | 7th floor, common areas : commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing.Details
7th floor, common areas : commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing. | $150,000 |
| Apr 28, 2017 | Never finaled issued Jun 2017, no final | 601 Montgomery St | 7th floor unit 750 srs: commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing.Details
7th floor unit 750 srs: commercial t.i. which includes demolition of non-structural partitions, lighting, and finishes. construction of non structural partitions includes accessibility upgrades, mechanical, electrical and plumbing. | $300,000 |
| Oct 14, 2016 | Never finaled issued Nov 2016, no final | 601 Montgomery St | commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep.Details
commercial tenant improvement which includes demo of non-structural partitions, lighting, and finshes. construction of non-structural partitions. includes mep. | $375,600 |
| Nov 19, 2015 | Completed final sign-off Apr 2016 | 601 Montgomery St | suite # 1830: commercial t.i. which includes new non-structural partitions, lighting, plumbin, mechnical, electrical, millwork and finishes. n/a for maher.Details
suite # 1830: commercial t.i. which includes new non-structural partitions, lighting, plumbin, mechnical, electrical, millwork and finishes. n/a for maher. | $214,420 |
| Oct 23, 2015 | Completed final sign-off Sep 2016 | 2638 17th Av | construct two bedrooms, one full bathroom, hallway. all work at ground floor.Details
construct two bedrooms, one full bathroom, hallway. all work at ground floor. | $46,000 |
| Oct 5, 2015 | Completed final sign-off Nov 2015 | 423 31st Av | replace existed dry rotted siding at the front of the building with stucoo and reveal lines where siding existing.Details
replace existed dry rotted siding at the front of the building with stucoo and reveal lines where siding existing. | $7,500 |
| Mar 23, 2015 | Completed final sign-off Aug 2015 | 601 Montgomery St | 18th floor; suite 1825 - partial interior only demo demising of (e) suite 1825. partition construction, new lights & finishes throughout. restrooms; reconfiguration of (e) 18th flr rr to provide accessible stalls & urinal locations. nistallation of vertical acuation bars. maher - not req'dDetails
18th floor; suite 1825 - partial interior only demo demising of (e) suite 1825. partition construction, new lights & finishes throughout. restrooms; reconfiguration of (e) 18th flr rr to provide accessible stalls & urinal locations. nistallation of vertical acuation bars. maher - not req'd | $250,000 |
| Mar 16, 2015 | Completed final sign-off Sep 2015 | 500 Sutter St | suite 300 - demolitoin of non-structural partitions. tenannt improvement include construciton of new interior partitions, new ceiling & lights, & new finishes. at restroom - relocation of grab bars, toilet paper dispenser, installation of vertical acuation bar & coat hooks.Details
suite 300 - demolitoin of non-structural partitions. tenannt improvement include construciton of new interior partitions, new ceiling & lights, & new finishes. at restroom - relocation of grab bars, toilet paper dispenser, installation of vertical acuation bar & coat hooks. | $75,000 |
| Feb 26, 2015 | Completed final sign-off Aug 2015 | 601 Montgomery St | #700- partial interior only, non-structural ti includes demo of walls betweens 3 (e) private offices to provide for a new conference room. demo of (e) ceiling grid and lights, install (n) grid & lights. new sink cabinet at breakroom. restroom- relocate tp dispenser toilet, install vertical actuationDetails
#700- partial interior only, non-structural ti includes demo of walls betweens 3 (e) private offices to provide for a new conference room. demo of (e) ceiling grid and lights, install (n) grid & lights. new sink cabinet at breakroom. restroom- relocate tp dispenser toilet, install vertical actuation | $298,000 |
| Nov 21, 2014 | Completed final sign-off Apr 2015 | 601 Montgomery St | suite 1000: partial interior only demolition to (e) suite 1000, proposed interior only, new finishes, cabinetry and electrical as noted. maher n/aDetails
suite 1000: partial interior only demolition to (e) suite 1000, proposed interior only, new finishes, cabinetry and electrical as noted. maher n/a | $269,765 |
| Oct 27, 2014 | Completed final sign-off Mar 2015 | 601 Montgomery St | #1110- partial interior only demolition to (e) suite. new construction includes new sidelights at private offices. new lights and new ceiling grid throughout. install new suite entry doors. new lowered cabinet casework and accessible sink. n/a ordinance #155-13Details
#1110- partial interior only demolition to (e) suite. new construction includes new sidelights at private offices. new lights and new ceiling grid throughout. install new suite entry doors. new lowered cabinet casework and accessible sink. n/a ordinance #155-13 | $225,000 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 7227 Geary Bl | unit 1: deck repair (less than 50%)for unit #1; (common area)partial rear exterior wall repair under the deck siding only. no structural workDetails
unit 1: deck repair (less than 50%)for unit #1; (common area)partial rear exterior wall repair under the deck siding only. no structural work | $19,950 |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 2223 39th Av | construct one bedroom, family room and one bathroom, all work at ground floor.Details
construct one bedroom, family room and one bathroom, all work at ground floor. | $32,000 |
| Sep 4, 2013 | Completed final sign-off Mar 2014 | 68 Brentwood Av | replace existing stucco with new stucco (in-kind).Details
replace existing stucco with new stucco (in-kind). | $25,000 |
| Jul 23, 2012 | Completed final sign-off Oct 2012 | 122 Paris St | legalize two bedrooms, one full bath & storage/laundry room. all work at ground floor.Details
legalize two bedrooms, one full bath & storage/laundry room. all work at ground floor. | $32,000 |
| Mar 29, 2012 | Completed final sign-off Sep 2012 | 2144 Filbert St | remodel of kitchen and pantry, laundry area, new cabinets, countertops, tile floor and electrical, plumbing.Details
remodel of kitchen and pantry, laundry area, new cabinets, countertops, tile floor and electrical, plumbing. | $19,000 |
| Aug 8, 2011 | Completed final sign-off Jan 2012 | 1214 02nd Av | upper unit - remodel of existing ktichen, demo & install new drywall, flooring, electrical & plumbing & cabinetry. prep, prime & paint.Details
upper unit - remodel of existing ktichen, demo & install new drywall, flooring, electrical & plumbing & cabinetry. prep, prime & paint. | $15,000 |
| Nov 17, 2010 | Completed final sign-off Jan 2011 | 1070 Pacheco St | repair exterior siding on left side and front garage side of house approx. 250 sq. ft.Details
repair exterior siding on left side and front garage side of house approx. 250 sq. ft. | $5,500 |
| Sep 24, 2010 | Completed final sign-off Jun 2013 | 601 Montgomery St | revision to 200909217301. error on original application. scope of work: build out 10 offices, phone room, 1 copy room, 1 coffee room at suites 1925 and 1950 per approved plansDetails
revision to 200909217301. error on original application. scope of work: build out 10 offices, phone room, 1 copy room, 1 coffee room at suites 1925 and 1950 per approved plans | |
| Sep 3, 2010 | Completed final sign-off Nov 2010 | 601 Montgomery St | 17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms.Details
17th floor - demolitoin of one restroom & one conference room wall. build server room. upgrade three restrooms. | $147,400 |
| Jun 2, 2010 | Completed final sign-off Jul 2010 | 225 10th Av | remodel (e) bathroom on 2nd floorDetails
remodel (e) bathroom on 2nd floor | $2,800 |
| Dec 3, 2009 | Completed final sign-off Feb 2010 | 601 Montgomery St | office tenant improvement; demise existing suite, add new door to corridor, remove one existing room(store rm.).Details
office tenant improvement; demise existing suite, add new door to corridor, remove one existing room(store rm.). | $46,126 |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 601 Montgomery St | 7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area.Details
7th floor suite 777 office tennant improvement, remove closet in copy room & install new door, infill existing openign to coffee area. install new section of millwork on coffee area. | $15,500 |
| Sep 30, 2009 | Never finaled issued Oct 2009, no final | 601 Montgomery St | 19th floor - mep submittal for tenant improvement of 2 offices spaces. ref. appl.200909217301.Details
19th floor - mep submittal for tenant improvement of 2 offices spaces. ref. appl.200909217301. | $74,100 |
| Jun 16, 2009 | Completed final sign-off Jul 2009 | 601 Montgomery St | 18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permitsDetails
18th floor-demise (e) office suite into 2 suites of 3529 sq ft & 1670 sq ft, all work non structural. sprinklers and fire alarm separate permits | $12,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | 11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included....Details
11th floor: remodel e restrooms. new fishes at corridors and lobby. smoke guard added at freight elevator-- mech and electrical included.... | $88,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | 8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit.......Details
8th floor: remodel restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator- mech and electrical...life safety separate permit....... | $88,000 |
| Apr 21, 2009 | Completed final sign-off Sep 2009 | 601 Montgomery St | 7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electricalDetails
7th floor - remodel of restrooms. new finishes at corridors and lobby. add smoke guard at freight elevator, mech and electrical | $88,000 |
| Feb 13, 2009 | Completed final sign-off Mar 2009 | 601 Montgomery St | voluntary barrier removal: provide diagonal access to toilets (men's & women's)Details
voluntary barrier removal: provide diagonal access to toilets (men's & women's) | $22,500 |
| Mar 23, 2007 | Completed final sign-off Apr 2007 | 173 Harold Av | renew pa#200607207138 & #200508019062 for final inspection.Details
renew pa#200607207138 & #200508019062 for final inspection. | |
| Mar 23, 2007 | Completed final sign-off Jul 2007 | 1371 32nd Av | adding b, exercise room, bathroom, bedroom added on ground floor and relocate laundry room.Details
adding b, exercise room, bathroom, bedroom added on ground floor and relocate laundry room. | $30,000 |
| Mar 30, 2006 | Completed final sign-off May 2006 | 2142 45th Av | remodel (e) 1 kitchen with new cabinets. counter top. sink appliances and new tiles floor. no structural work. remodel (e) 1 bathroom with new sink & bathtub.Details
remodel (e) 1 kitchen with new cabinets. counter top. sink appliances and new tiles floor. no structural work. remodel (e) 1 bathroom with new sink & bathtub. | $16,000 |
| Aug 2, 2005 | Completed final sign-off Nov 2005 | 1998 15th Av | repair stucco @ right side of the building.Details
repair stucco @ right side of the building. | $6,000 |
| Aug 1, 2005 | Completed final sign-off Apr 2007 | 173 Harold Av | horizontal addition (approx. 40' x 25')Details
horizontal addition (approx. 40' x 25') | $150,000 |
| Jul 2, 2004 | Completed final sign-off Sep 2004 | 74 Arnold Av | repair stucco at frontDetails
repair stucco at front | $7,000 |
| Dec 10, 2003 | Completed final sign-off Apr 2004 | 1974 36th Av | remodel kitchen - change cabinet, sink, stove, walls.Details
remodel kitchen - change cabinet, sink, stove, walls. | $10,000 |