Hi Level Inc
- Based in
- San Mateo
- On San Francisco permits
- Nov 2014 to May 2020
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2020 | Completed final sign-off Jun 2020 | 3759 22nd St | repair left side rear of house siding fungus/dry rot.Details
repair left side rear of house siding fungus/dry rot. | $7,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2020 | 1664 Grove St | remodel kitchen, add full bath, add closets 3rd flDetails
remodel kitchen, add full bath, add closets 3rd fl | $60,000 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 274 Topeka Av | build a new exterior redwood deck 5'x12' sister joist.Details
build a new exterior redwood deck 5'x12' sister joist. | $5,000 |
| Mar 7, 2019 | Completed final sign-off Apr 2019 | 3826 Cesar Chavez St | title 24 change gas water heater to electric per electrical inspector for final.rev to pa 201602048798Details
title 24 change gas water heater to electric per electrical inspector for final.rev to pa 201602048798 | |
| May 23, 2018 | Completed final sign-off Nov 2018 | 3818 Cesar Chavez St | front facade remodel: replace and reconfigure windows, update (e) stair, (n) wood siding, remove concrete planters@ stair.Details
front facade remodel: replace and reconfigure windows, update (e) stair, (n) wood siding, remove concrete planters@ stair. | $60,000 |
| Jun 22, 2017 | Never finaled issued Dec 2017, no final | 3828 Cesar Chavez St | demolish 1-story rear cottageDetails
demolish 1-story rear cottage | $10,000 |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 2336 Lake St | explore wall and cement floors check to see for engineer wall remove. no structural workDetails
explore wall and cement floors check to see for engineer wall remove. no structural work | $5,000 |
| Apr 21, 2016 | Completed final sign-off Jun 2016 | 3759 22nd St | relocate first floor bathroom and add bedroom.Details
relocate first floor bathroom and add bedroom. | $12,000 |
| Apr 5, 2016 | Completed final sign-off Jun 2016 | 3759 22nd St | revision to ref pa 2015 0617 9190: add vent shaft in bedroom #1 top floor. relocate skylight and add 2 additional skylightsDetails
revision to ref pa 2015 0617 9190: add vent shaft in bedroom #1 top floor. relocate skylight and add 2 additional skylights | $5,000 |
| Apr 5, 2016 | Completed final sign-off Jun 2016 | 3759 22nd St | revision to ref pa 2015 1016 0014: wall locationDetails
revision to ref pa 2015 1016 0014: wall location | |
| Feb 4, 2016 | Completed final sign-off Apr 2019 | 3826 Cesar Chavez St | remodel of garage foundation, upgrade 1st floor. remodel/addition of 2nd fl unit. remodel/ addition of 3rd fl unit.Details
remodel of garage foundation, upgrade 1st floor. remodel/addition of 2nd fl unit. remodel/ addition of 3rd fl unit. | $200,000 |
| Jan 22, 2016 | Never finaled issued Sep 2016, no final | 2336 Lake St | remodel existing kitchen, powder on main fl, 2nd fl, remodel e bath 2, new bath and laundry, e master bath on 3rd fl, new mech rm on 1st fl, water heater/hvacDetails
remodel existing kitchen, powder on main fl, 2nd fl, remodel e bath 2, new bath and laundry, e master bath on 3rd fl, new mech rm on 1st fl, water heater/hvac | $80,000 |
| Oct 16, 2015 | Completed final sign-off Jun 2016 | 3759 22nd St | new retaining wall in basement in front of (e) conrete wallDetails
new retaining wall in basement in front of (e) conrete wall | $12,000 |
| Jun 17, 2015 | Completed final sign-off Jun 2016 | 3759 22nd St | remodel upper and main floor, remove stair from main floor to lower floor, replace redwood decking to ipe wood, add skylight, new furance & gas water heater, replace windows as in kind, add powder room, master bathroom, washer & dryer. legalize living, sitting area & bathroom, remove kitchen on g/f.Details
remodel upper and main floor, remove stair from main floor to lower floor, replace redwood decking to ipe wood, add skylight, new furance & gas water heater, replace windows as in kind, add powder room, master bathroom, washer & dryer. legalize living, sitting area & bathroom, remove kitchen on g/f. | $80,000 |
| Nov 21, 2014 | Completed final sign-off Mar 2015 | 1240 Filbert St | remodel of master bathroom; remodel of guest bath (lower floor); wet bar added to family room (lower floor); refinish (e) wood floors. maher n/aDetails
remodel of master bathroom; remodel of guest bath (lower floor); wet bar added to family room (lower floor); refinish (e) wood floors. maher n/a | $25,000 |