Herreroboldt Partners
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Dec 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 4 completed, 8 never finaled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2018 | Completed final sign-off Jan 2019 | 26 27th St | to obtain final inspection for work approved under pa#201407111099. all work is complete.Details
to obtain final inspection for work approved under pa#201407111099. all work is complete. | |
| Dec 21, 2017 | Completed final sign-off Apr 2019 | 1100 Van Ness Av | tenant improvement of tunnel between 1100 vaness to 1101 van ness; n/a maherDetails
tenant improvement of tunnel between 1100 vaness to 1101 van ness; n/a maher | $600,000 |
| Jul 11, 2014 | Never finaled issued Sep 2014, no final | 1471 Guerrero St | temporary shoring to accomodate new construction at 3555 cesar chavez st.Details
temporary shoring to accomodate new construction at 3555 cesar chavez st. | $23,574 |
| Jul 11, 2014 | Never finaled issued Sep 2014, no final | 3631 Cesar Chavez St | temporary shoring to accomodate new construction at 3555 cezar chevez street.Details
temporary shoring to accomodate new construction at 3555 cezar chevez street. | $16,839 |
| Jul 11, 2014 | Never finaled issued Sep 2014, no final | 3627 Cesar Chavez St | temporary shoring to accomodate new construction at 3555 cesar chavez st.Details
temporary shoring to accomodate new construction at 3555 cesar chavez st. | $25,258 |
| Jul 11, 2014 | Never finaled issued Sep 2014, no final | 26 27th St | temporary shoring to accomodate new construction at 3555 cesar chavez st.Details
temporary shoring to accomodate new construction at 3555 cesar chavez st. | $60,019 |
| Apr 11, 2014 | Never finaled issued Oct 2014, no final | 3555 Cesar Chavez St | temporary shoring.Details
temporary shoring. | $2,600,000 |
| Mar 10, 2014 | Never finaled issued Mar 2014, no final | 1101 Van Ness Av | revision to approved permit 2012-0702-3942. remove underground tanks on geary blvd from original scope of work. tie backs shall not extend beyond city street right of way.Details
revision to approved permit 2012-0702-3942. remove underground tanks on geary blvd from original scope of work. tie backs shall not extend beyond city street right of way. | |
| May 20, 2013 | Completed final sign-off Sep 2013 | 1200 Van Ness Av | new interior non load bearing partitions, doors, finishes. there is no structural or exterior work. sprinklers, m.e.p under seperate permitDetails
new interior non load bearing partitions, doors, finishes. there is no structural or exterior work. sprinklers, m.e.p under seperate permit | $320,000 |
| May 17, 2013 | Completed final sign-off Jul 2013 | 1200 Van Ness Av | interior non structural demolition of the 1st floor. all work to comply with ab-017. tenant improvement under separate permit.Details
interior non structural demolition of the 1st floor. all work to comply with ab-017. tenant improvement under separate permit. | $45,000 |
| Jul 2, 2012 | Never finaled issued Dec 2013, no final | 1101 Van Ness Av | excavation and shoring for new building.Details
excavation and shoring for new building. | $6,800,000 |
| Sep 23, 2011 | Never finaled issued Aug 2013, no final | 1101 Van Ness Av | interior non-structural demo to floors 1 - 9, building to remain vacant until being demolished. disable access documentation is exempted per sfbc, ab-017.Details
interior non-structural demo to floors 1 - 9, building to remain vacant until being demolished. disable access documentation is exempted per sfbc, ab-017. | $1,102,200 |