Herrera Construction
- Based in
- Novato
- On San Francisco permits
- Jan 2021 to Aug 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 3881 Cesar Chavez St | revision to pa # 202606304269: revise foundation detail and add shear to (n) wallDetails
revision to pa # 202606304269: revise foundation detail and add shear to (n) wall | $5,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 3881 Cesar Chavez St | add bath to second floor. framing at entry and living room.Details
add bath to second floor. framing at entry and living room. | $40,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 3881 Cesar Chavez St | remodel bathroom w/ 35 sf addition into garage,frame (2) closets, replace (e) door with (n) window. replace window with (n) door. replace 2(e) windows in kind not visible from street., move washer and dryer from garage to inside, add bar sinkDetails
remodel bathroom w/ 35 sf addition into garage,frame (2) closets, replace (e) door with (n) window. replace window with (n) door. replace 2(e) windows in kind not visible from street., move washer and dryer from garage to inside, add bar sink | $40,000 |
| Jan 22, 2024 | Completed final sign-off Jun 2024 | 10 Beaver St | to comply w/ nov# 202317379, to repair front stair , will replace the same way it was built. repair siding of 30 sqft.Details
to comply w/ nov# 202317379, to repair front stair , will replace the same way it was built. repair siding of 30 sqft. | $10,000 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 90 Ord St | remove existing cabinets. install new owner supplied cabinets/countertops/ appliances and fixtures. move plumb 5 ft at sink area. replace new lighting where needed. bring wiring up to code where necessary as needed. repair drywall, paint to matchDetails
remove existing cabinets. install new owner supplied cabinets/countertops/ appliances and fixtures. move plumb 5 ft at sink area. replace new lighting where needed. bring wiring up to code where necessary as needed. repair drywall, paint to match | $22,000 |