Her Construction
- Based in
- San Mateo
- On San Francisco permits
- Nov 2022 to Jul 2026
- Last 24 months
- 6 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 155 Vicksburg St | relocate (e) washer + dryer to (e) closet in the same room area. no changes to wall layout.Details
relocate (e) washer + dryer to (e) closet in the same room area. no changes to wall layout. | $15,000 |
| Jul 13, 2026 | Completed final sign-off Sep 2026 | 155 Vicksburg St | bathroom remodel - same layout to remain, no wall alterations, new fixtures, tile and electricalDetails
bathroom remodel - same layout to remain, no wall alterations, new fixtures, tile and electrical | $30,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 1816 Lake St | master bathroom remodel - new fixtures, tile and showerDetails
master bathroom remodel - new fixtures, tile and shower | $20,000 |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 289 Hermann St | add a full bath, shower pan, toilet, and sink at garage level.Details
add a full bath, shower pan, toilet, and sink at garage level. | $50,000 |
| Aug 14, 2025 | Completed final sign-off Dec 2025 | 304 Winfield St | new stair and landing, like for like in front of home. street visible. tile installation on new stairs.Details
new stair and landing, like for like in front of home. street visible. tile installation on new stairs. | $21,000 |
| Jun 11, 2025 | Completed final sign-off Jul 2025 | 279 Hermann St | 1/f -addition of a powder room (toilet and lavatory) within utility room space. sink, and exhaust fan.Details
1/f -addition of a powder room (toilet and lavatory) within utility room space. sink, and exhaust fan. | $15,000 |
| Nov 22, 2022 | In progress issued Oct 2024 | 1816 Lake St | new concrete curbs @(e)driveway,(e)of(e)trench drain,(n)enlarged garage door,(n)mail slot @garage door,infill under(e)main fl w/(n) unconditioned space.replace(e)fireplace w/ gas applicance.remove(e)door @ foyer,enlarge opening(n)frech door @ foyer,(n)kitchen cabinetry.Details
new concrete curbs @(e)driveway,(e)of(e)trench drain,(n)enlarged garage door,(n)mail slot @garage door,infill under(e)main fl w/(n) unconditioned space.replace(e)fireplace w/ gas applicance.remove(e)door @ foyer,enlarge opening(n)frech door @ foyer,(n)kitchen cabinetry. | $200,000 |