Hector Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Aug 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2011 | Completed final sign-off Oct 2011 | 166 Gaven St | had electrical fire in back bedroom. resheetrock leff side @ rear bedroom & add more electrical plugs in house. re-sheetrock with 5/8 inch type x gyp.Details
had electrical fire in back bedroom. resheetrock leff side @ rear bedroom & add more electrical plugs in house. re-sheetrock with 5/8 inch type x gyp. | $6,000 |
| Oct 20, 2009 | Completed final sign-off Oct 2009 | 706 Holloway Av | revision to p.a. #2008/0620/5036 to delete from scope of work; on basemet/first flr. remodel. no work to be done & to remain as storage & garage. all work @ 2nd. flr. was completed.ist fllor plan as per application 2009 1020 9353Details
revision to p.a. #2008/0620/5036 to delete from scope of work; on basemet/first flr. remodel. no work to be done & to remain as storage & garage. all work @ 2nd. flr. was completed.ist fllor plan as per application 2009 1020 9353 | |
| Jun 20, 2008 | Completed final sign-off Oct 2009 | 706 Holloway Av | to comply with nov# 200856412 to replace wall finishes on 2nd floor kitchen,lvg rm and hallway area of lath and plaster, electrical upgrade. convert a portion of ex. garage and storage space on the grd flr to 1 br, 1 full bath, utility rm, replace 5 window in front infill ex. lightwell, new stairsDetails
to comply with nov# 200856412 to replace wall finishes on 2nd floor kitchen,lvg rm and hallway area of lath and plaster, electrical upgrade. convert a portion of ex. garage and storage space on the grd flr to 1 br, 1 full bath, utility rm, replace 5 window in front infill ex. lightwell, new stairs | $60,000 |
| Mar 30, 2007 | Completed final sign-off May 2007 | 1396 Thomas Av | to comply with nov 200795252. repair rottern subfloor to southeast bedroom. comply with nov#200795252Details
to comply with nov 200795252. repair rottern subfloor to southeast bedroom. comply with nov#200795252 | $1,500 |
| Nov 18, 2004 | Completed final sign-off Aug 2005 | 1660 Hayes St | 3 new bathroom opening up walls between kitchen and family rom in all unitsDetails
3 new bathroom opening up walls between kitchen and family rom in all units | $30,000 |
| Oct 13, 2004 | Completed final sign-off Aug 2005 | 1660 Hayes St | remodel kitchen & bath, update electrical & plumbing, paint & patch wallsDetails
remodel kitchen & bath, update electrical & plumbing, paint & patch walls | $40,000 |
| Apr 22, 2002 | Completed final sign-off Jun 2003 | 345 Jersey St | reduce the size of deck, couble up deck joists, relocate footings, widen railings of both sides, insDetails
reduce the size of deck, couble up deck joists, relocate footings, widen railings of both sides, ins | $16,625 |