Heare Construction Company
- Based in
- San Rafael
- On San Francisco permits
- Jun 2002 to Aug 2018
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2018 | Completed final sign-off Feb 2019 | 2631 Quintara St | (e) kitchen alterations no changs to the floor plan. replacement of plumbing fixtures, countertop, tile, cabinets, electrical recept, switches and light fixtures. kitchen area 140 sq ftDetails
(e) kitchen alterations no changs to the floor plan. replacement of plumbing fixtures, countertop, tile, cabinets, electrical recept, switches and light fixtures. kitchen area 140 sq ft | $40,000 |
| Feb 12, 2008 | Never finaled issued Feb 2008, no final | 1794 10th Av | 6 sq ft stucco, 6.7 sq ft wood siding repair approx.minor dry rot repair to framingDetails
6 sq ft stucco, 6.7 sq ft wood siding repair approx.minor dry rot repair to framing | $1,000 |
| Jun 7, 2002 | Completed final sign-off Jun 2002 | 1723 Noe St | front siding corner repair.replace the plate up to the center of the first stud.belt down at the endDetails
front siding corner repair.replace the plate up to the center of the first stud.belt down at the end | $1,000 |